The Challenge was To pump screed 47 floors up in a ‘single pump’ operation. And to lay 1800m2 a day for the Shangri La Hotel section of The Shard. 40mm Gyvlon SKY on a resilient layer to part E, pumped internally in the building to allow the glass cladding and other operations to continue. Single pump operation at 14m3 per hour up 200 metres