Blackwall Tunnel

OVERVIEW

BAM Nuttall was awarded the contract by Transport for London to refurbish the northbound carriageway of the Blackwall Tunnel. TFL had a difficult task with the refurbishment as they had to ensure the tunnel remained open to traffic during the day. Faced with the challenges of designing and installing a waterproofing system for a domed roof that features mechanical ‘petals’ that open and close, the architects Acanthus LW worked with specialist contractor Robertson Roofing to develop an innovative solution for the unusual single ply membrane application.

No featured products in this case study

Contact Sikaplan® by clicking the button below to find out which products were used in this case study.