NBS Source
I'm a manufacturer

ACO StormBrixx plays its part in new Academy’s SuDS design for exceedance

OVERVIEW

ACO Water Management’s StormBrixx system has been utilised as part of an exemplar SuDS design for exceedance. ACO worked closely with the project engineers for Telford Co-Operative Academy, to develop a multi-functional solution able to manage a 1:100 year event plus an uplift of 30% for climate change - equating to around 1000m3 of surface water. The Telford Co-Operative Academy’s main building, all weather sports field and car park form three substantial drainage elements, which threw up a number of challenges for Telford and Wrekin Council and the project contractor Shepherd Construction

No featured products in this case study

Contact ACO Technologies plc by clicking the button below to find out which products were used in this case study.

More case studies from ACO Technologies plc

View all case studies (26)
Handcrafted drainage for craft beer brewer

Handcrafted drainage for craft beer brewer

ACO combined kerb drainage system installed throughout widening of A453

ACO combined kerb drainage system installed throughout widening of A453

Welsh Housebuilder turns to ACO StormBrixx for access

Welsh Housebuilder turns to ACO StormBrixx for access

ACO Provides Sustainable Drainage to Supermarket

ACO Provides Sustainable Drainage to Supermarket