NBS Source
I'm a manufacturer

This case study is no longer available.

High rise Residential

OVERVIEW

For a Flagship building like 'The Shard' the thought of screeding at that height would have been madness, fortunately for the design team our Hollow floor system met the challenge, our 36mm Combi T system was installed throughout 10 floors of penthouse circa 4000m2. this provided the perfect subfloor to accommodate the various luxury floor finishes.

No featured products in this case study

Contact Mero-Schmidlin (UK) plc by clicking the button below to find out which products were used in this case study.