The new Ardley EfW Plant, including a 12m basement built over an Artesian Well, presented a host of construction challenges. Due to the extreme water pressure created by the Artesian Well, as well as ammonium salts in the ground, Fosroc worked closely with Tata Projects specifying a solution using Proofex Engage to provide a watertight, chemically resistant barrier, with Supercast SW20 in the construction joints to reinforce the floor to wall joint. Fosroc provided a ‘total solution’ package to ensure Tata Projects could feel confident with the proposed specification, from basement waterproofing, to grouting crane bases, flooring and sealants.
Contact Fosroc International Limited by clicking the button below to find out which products were used in this case study.
Crossrail Victoria Dock