NBS Source
I'm a manufacturer

Flood Defence Scheme

OVERVIEW

In the summer of 2007 the country witnessed extensive flooding with areas in England experiencing “over two months rainfall in just 14 hours.” Loss of water and electricity supply was experienced with thousands of homes. Providing protection against a 1 in 1000 year flood event involved building over 1 kilometer of reinforced concrete and sheet piled walls. As well as protecting the site from future flooding, the team at RHI Industrials worked in partnership with Lochrin Bain to ensure the security fencing system was fully integrated with the substations new flood defences.

No featured products in this case study

Contact Lochrin Bain Limited by clicking the button below to find out which products were used in this case study.

More case studies from Lochrin Bain Limited

View all case studies (6)
Utility Site Security Upgrade

Utility Site Security Upgrade

Regeneration Site: Waterfront Business Park

Regeneration Site: Waterfront Business Park

Bulk Storage Facility

Bulk Storage Facility

Distribution HQ: Combi Palisade SL1

Distribution HQ: Combi Palisade SL1