The Jan Palfijn Hospital in Ghent went through a thorough transformation. The hospital was stripped down to its concrete structure and subsequently rebuilt with an entirely new layout and altered view. The Temporary Association Boeckx-Arch&Teco-Bontinck signed the master plan and coordinated this tremendous project.
No featured products in this case study
Contact Renson Fabrications Ltd by clicking the button below to find out which
products were used in this case study.