The hotel’s newly marble-fitted bathrooms required a thin, water resistant floating screed to be applied to the insulation boards providing a base for the marble flooring. The screed needed to withstand the weight of the marble baths and other fixtures.
No featured products in this case study
Contact Ronacrete Ltd by clicking the button below to find out which
products were used in this case study.