NBS Source
I'm a manufacturer

London 1 Data Center

OVERVIEW

London 1 Data Center is the first phase of a brand new data centre development for a global data centre operator. Located in Dagenham, East London it has been operational since December 2020.


When the subsequent phases are completed it will make the data centre one of the UK’s largest. In order to secure the data centre from intruders, the operator required a range of entrance control solutions as part of their layered approach to security. Having previously installed entrance control products at the clients Hemel Hempstead and Slough facilities, Meesons were approached to provide solutions for their new data centre.

Products featured in this case study

View all products (10)
C190 Cylindrical Security Portal - High-security doorsets

C190 Cylindrical Security Portal - High-security doorsets

EasyGate SPT/ SPD Speed Gate

EasyGate SPT/ SPD Speed Gate

More case studies from Meesons A I Ltd

View all case studies (18)
VIRTUS Data Centres

VIRTUS Data Centres

Hogan Lovells

Hogan Lovells

2 London Wall Place

2 London Wall Place

Francis Crick Institute

Francis Crick Institute

More case studies from Half-height access control gates

View all case studies (12)
DEMAND FOR INCREASED SECURITY IN MULTI TENANTED BUILDINGS - Automatic Systems - International

DEMAND FOR INCREASED SECURITY IN MULTI TENANTED BUILDINGS - Automatic Systems - International

Secure your data centre by installing access control equipment - access control, turnstile, speed gate, barrier Automatic Systems

Secure your data centre by installing access control equipment - access control, turnstile, speed gate, barrier Automatic Systems

A PRACTICAL GUIDE TO ACCESS CONTROL EQUIPMENT FOR EDUCATION CAMPUS’S - Automatic Systems - International

A PRACTICAL GUIDE TO ACCESS CONTROL EQUIPMENT FOR EDUCATION CAMPUS’S - Automatic Systems - International

Two Hardman Street, Manchester

Two Hardman Street, Manchester