CPS Manufacturing was awarded the contract to revive the flexible floor space in the Alexandra Palace. This included manufacturing and installing four seating rostra configurations, three orchestra pit infill configurations and a stage infill. 200 stage decks, 1200 stage legs and over 200 fascia panels and valance curtains were installed in total.
Contact CPS Manufacturing Co LLP by clicking the button below to find out which products were used in this case study.
Villa Cross Church of God Prophecy Auditorium Seating
Exeter Cathedral Staging
2012 Olympic Games Media Centre Auditorium Seating and Staging
Grimsby Leisure Centre Swimming Pool Spectator Seating