Alexandra Palace Theatre Restoration Seating, Orchestra Pit and Staging
OVERVIEW
CPS Manufacturing was awarded the contract to revive the flexible floor space in the Alexandra Palace.
This included manufacturing and installing four seating rostra configurations, three orchestra pit infill configurations and a stage infill.
200 stage decks, 1200 stage legs and over 200 fascia panels and valance curtains were installed in total.
No featured products in this case study
Contact CPS Manufacturing Co LLP by clicking the button below to find out which
products were used in this case study.