NBS Source
I'm a manufacturer

This case study is no longer available.

Factory coated Larch cladding

OVERVIEW

Built by Inti Construction Ltd using a SIPS construction method, Siberian Larch cladding factory coated with Organowood creating a consistent silver/grey façade. Planed all round, supplied in set lengths with a fine-sawn face. Spaced with 10mm shadow-gaps, sitting on black Tyvek UV wrap to give definition in appearance. The Grade A, kiln dried Siberian Larch finished to a 118mm width has been factory coated with Organowood under controlled conditions to speed up the weathering, creating a consistent, uniformed appearance to all elevations. Summary: Larch Grade A Width. 20x118mm Length. 4m/5.7m Profile: PAR + Fine-Sawn

No featured products in this case study

Contact Millworks Ltd by clicking the button below to find out which products were used in this case study.