NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

BB93 Solution for Teeside University

OVERVIEW

The original building was constructed in 1997 and incorporated some sound absorbent materials; the refurbishment had to inject new life into the interior whilst also enhancing the library’s acoustic performance. The open-plan layout, which can have up to 450 students using it at any one time, presented a particular challenge for controlling the build-up and spread of sound.

No featured products in this case study

Contact CMS Danskin Acoustics by clicking the button below to find out which products were used in this case study.

More case studies from CMS Danskin Acoustics

View all case studies (28)
Sound Absorption Solution for Moneypenny Call Centre HQ

Sound Absorption Solution for Moneypenny Call Centre HQ

SuperLag Quietslab used at ExxonMobil Oil Refinery

SuperLag Quietslab used at ExxonMobil Oil Refinery

Sound Absorption Solution for CCGT Power Station at Landivisiau in Brittany

Sound Absorption Solution for CCGT Power Station at Landivisiau in Brittany

Nine Elms Parkside Case Study: Under Screed Acoustic Layer

Nine Elms Parkside Case Study: Under Screed Acoustic Layer