NBS Source
I'm a manufacturer

This case study is no longer available.

London Gatwick Airport

OVERVIEW

Successful installation of sports bottle refill stations for use by passenger both land and air side. The units chosen are robust and able to withstand a large footfall and capable of rapid sports bottle filling. The machines we provided were WRAS and CE approved, wheelchair accessible and vandal resistant. We started with a consultation and site visit to determine the best possible spots for installation, providing all technical information required. Finally installation took place and on going service and support is being provided to ensure units are long lasting and remain clean and at their best condition at all times.

No featured products in this case study

Contact MIW Water Cooler Experts by clicking the button below to find out which products were used in this case study.