NBS Source
I'm a manufacturer

Glasgow Harbour - Scotland

OVERVIEW

Glasgow Harbour is one of Clyde Waterfront regeneration projects. This regeneration development will benefit Glasgow and Scotland economically and socially. Major infrastructure works have been carried out along the Expressway at Glasgow Harbour with £25 million spent on local roads improvements. In addition to its residential and commercial facilities, Glasgow Harbour also have features around 50 acres of open public space, and approximately 3km of waterfront walkways. Effisus A1 Fire Rated Breather FR Membrane, was the chosen membrane to protect the new façade against moisture, driving rain and wind.

No featured products in this case study

Contact EFFISUS by clicking the button below to find out which products were used in this case study.

More case studies from EFFISUS

View all case studies (46)
Southbank Place

Southbank Place

SSE Hydro Arena

SSE Hydro Arena

Birmingham New Street Station

Birmingham New Street Station

Royal Wharf

Royal Wharf