NBS Source
I'm a manufacturer

This case study is no longer available.

H&M

OVERVIEW

WHEN WAS THE PROJECT? November 2018 to February 2019 WHERE IS THE PROJECT? Karl Johans gt 14, Oslo WHAT WAS THE BRIEF? WHAT WAS DESIGNED AND INSTALLED? The fabrication, supply and install of all metal work items within the multi level department store. As specified by NSW architects.

No featured products in this case study

Contact Metalform Group Ltd by clicking the button below to find out which products were used in this case study.