NBS Source
I'm a manufacturer

This case study is no longer available.

Manchester One

OVERVIEW

This building which is now known as Manchester One was completed in 1962 and at that time its height of 80m made it one of the tallest buildings in the UK. As part of a £2m re-development of the 21 floors a new reception was created. Blinds were required to reduce heat and light gain in this highly glazed reception space. Pentel proposed the Astralux 3000 heavy duty roller blind system with just three blinds required to shade over 50 square metres of curtain walling.

No featured products in this case study

Contact Astralux Blind System by clicking the button below to find out which products were used in this case study.