Mast Architects, Glasgow - Airtightness Project

by BPD Building Product Design Ltd

The proposed developments followed traditional timber kit design, consisting of an outer brick skin 50mm cavity, with an internal 140mm stud frame, and using mineral wool insulation minimum 20mm service void, finished with a plasterboard lining. The brief was to achieve air permeability less than 6m3/h/m².

Products featured in this case study

View all products (70)
Glidevale Protect Barriair AVCL

Glidevale Protect Barriair AVCL

Glidevale Protect FCM750 Floor Cassette Membrane

Glidevale Protect FCM750 Floor Cassette Membrane

Glidevale Protect VC Foil Ultra AVCL

Glidevale Protect VC Foil Ultra AVCL

Glidevale Protect TF200 Thermo Breather Membrane

Glidevale Protect TF200 Thermo Breather Membrane

More case studies from BPD Building Product Design Ltd

View all case studies(13)
The Loft Holiday Home

The Loft Holiday Home

Bateman's Tower Cafe, Brightlingsea

Bateman's Tower Cafe, Brightlingsea

Monoridge Project - Danbury, Essex

Monoridge Project - Danbury, Essex

Victoria Views - Arundel Crescent Development, Plymouth

Victoria Views - Arundel Crescent Development, Plymouth