NBS Source
I'm a manufacturer

iDecking walkway in high profile modern style home

OVERVIEW

The client was looking to replace an old 67 metre long wooden walkway surrounding a pool. Their contractor recommended the Decking system due to the low profile aluminium substructure and moisture-proof composite boards which require far less ongoing maintenance. The installer removed the old decking to reveal the sub base, then used Wallbarn’s heavy duty MegaPad pedestals to underpin the iDecking rail system. Our proposed laying pattern complemented the architect’s original design, drawing the eye down the length of the walkway. The entire job took two weeks to complete. The client is delighted with the results.

No featured products in this case study

Contact Wallbarn Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Wallbarn Ltd

View all case studies (40)
Adjustable Paving Supports - Woodbury Close, Finsbury Park

Adjustable Paving Supports - Woodbury Close, Finsbury Park

Instant Green Roof - Wimbledon - Care Home - M-Tray®

Instant Green Roof - Wimbledon - Care Home - M-Tray®

M-Tray® Instant Green Roof - The May Fair Hotel

M-Tray® Instant Green Roof - The May Fair Hotel

iDecking Project - Dunalastair, Perthshire, Scotland

iDecking Project - Dunalastair, Perthshire, Scotland