NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

Adare Manor - Minimising Build-Up in The Manor

OVERVIEW

Schlüter-Systems used its specialist technical knowledge and a number of key product solutions to minimise floor build-up and guarantee complete waterproofing provision in the refurbishment of one of Ireland’s most magnificent country houses. Set in 840 acres of grounds, Adare Manor was the subject of an 18-month-long renovation—its most extensive in 25 years. 40 new bedrooms have been added to this 19th century neo-gothic masterpiece as well as a host of new facilities; including a swimming pool, boardroom, cinema, spa and 350-capacity ballroom.

Products featured in this case study

View all products (121)
Schlüter®-DITRA - Uncoupling and Waterproofing Membrane

Schlüter®-DITRA - Uncoupling and Waterproofing Membrane

Schlüter®-KERDI-KEBA - Sealing Band

Schlüter®-KERDI-KEBA - Sealing Band

Schlüter®-KERDI 200 - Waterproofing Membrane

Schlüter®-KERDI 200 - Waterproofing Membrane

Schlüter®-DITRA-HEAT - Electric Underfloor Heating

Schlüter®-DITRA-HEAT - Electric Underfloor Heating

More case studies from Schlüter-Systems Ltd

View all case studies (34)
The Eiffel Tower - Uncoupling an Icon

The Eiffel Tower - Uncoupling an Icon

Tate Britain - An Artistic Uncoupling of Tile

Tate Britain - An Artistic Uncoupling of Tile

Lalit Hotel London - Wetrooms Fit for a Maharaja

Lalit Hotel London - Wetrooms Fit for a Maharaja

Adare Manor - Minimising Build-Up in The Manor

Adare Manor - Minimising Build-Up in The Manor

More case studies from Plastics sheets

View all case studies (25)
Drumhierny Woodland Holiday Lodges

Drumhierny Woodland Holiday Lodges

The Moorings, Wales

The Moorings, Wales

The Willows, EnerPHit Retrofit

The Willows, EnerPHit Retrofit

Forensic Laboratory Backweston

Forensic Laboratory Backweston