NBS Source
I'm a manufacturer

This case study is no longer available.

St Johns School Maidstone

OVERVIEW

During the initial meeting with the architect it was found not copper green but copper brown was chosen to match the existing. The project would also have 2 extensions/phases at different stages. During 1st phase, the decision to carry on with the second phase was made. All existing contractors were nominated to carry out the 2nd phase. During all works on phases 1 and 2, contact was kept with the architect and was informed that decision was made to re-roof the existing buildings. All works were carried out successfully.

No featured products in this case study

Contact RENOLIT Cramlington Ltd by clicking the button below to find out which products were used in this case study.

More case studies from RENOLIT Cramlington Ltd

View all case studies (20)
When aesthetics and environmental consideration go hand-in-hand

When aesthetics and environmental consideration go hand-in-hand

Unique, aesthetic and ecological

Unique, aesthetic and ecological

Architectural freedom of design

Architectural freedom of design

Energy neutral with pv installation and hot water panels..

Energy neutral with pv installation and hot water panels..