NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

Ruskin Square

OVERVIEW

Building One at Ruskin Square is the first of five that are planned as part of a £500 million development adjacent to East Croydon station. The building was designed by Shedkm architects and constructed by Lendlease and comprises a 9 storey 184,000 sq ft office building which has been fully let to HMRC. The building has two cores and these have 2700mm high Novista Steel Riser doorsets on all four sides which have been painted with emulsion the match the adjoining wall making them virtually invisible when to door is closed.

Products featured in this case study

View all products (10)
Novista Concealed Steel Riser – FD120 - Doorset With Hidden Frame

Novista Concealed Steel Riser – FD120 - Doorset With Hidden Frame

More case studies from Aspex UK Limited

View all case studies (54)
Macclesfield Town Hall - Restoration

Macclesfield Town Hall - Restoration

Sidney Stringer Academy - Education

Sidney Stringer Academy - Education

2012 London Olympics Athletes Village - Accommodation

2012 London Olympics Athletes Village - Accommodation

Chelsea Barracks - Residential

Chelsea Barracks - Residential

More case studies from Carbon steel doorsets

View all case studies (79)
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Compound Semiconductor Innovation Centre for CSA Catapult

Compound Semiconductor Innovation Centre for CSA Catapult

The Compound Semiconductor Facility for IQE

The Compound Semiconductor Facility for IQE

Glasgow Royal Infirmary University Tower for NHS

Glasgow Royal Infirmary University Tower for NHS