A global leader in interactive and digital entertainment
OVERVIEW
As a part of a large refurbishment of two outdated 1980’s office buildings separated by a large open courtyard, their new European Headquarters were looking for an efficient, reliable and stylish instant boiling and chilled water system. As the offices are spread across several floors, accommodating a large number of people was the key requirement.The company approached us with a clear requirement for an energy-efficient and reliable boiling and chilled system with a sleek design to match their contemporary break out areas.
No featured products in this case study
Contact Billi UK by clicking the button below to find out which
products were used in this case study.