HDS Heated ramp system installed at St Georges court in Weybridge.

OVERVIEW

A luxury modern development with several executive apartments. HDS was contracted to supply and install an Ice and snow melting system, to give safe access from the underground carpark up to ground level. The client wanted the full width of the ramp heated, so 5 x HDS 4455W driveway heating cables (300W/Sqm) were fitted on top of the old ramp before it was covered with a new 60mm layer of Surface coat tarmac. The heated ramp is controlled by an HDS ice and snow melting control, with 2 ground/moisture sensors and one air temperature sensor.