NBS Source
I'm a manufacturer

Tile Showroom Kings Heath Birmingham

OVERVIEW

A thick tile floor covering meant a reduced floor section buildup, plus reduced construction joints to aid tiling. Ground floor 45mm Gyvlon ECO over 90mm insulation on a beam and block substrate First Floor 45mm Gyvlon ECO on a precast plank substrate. Gyvlon was used to reduce the floor build on both floors plus reducing the need for construction joints. This gave the client more flexibility on the thick floor coverings and eased installation with reduced construction joints.

No featured products in this case study

Contact Anhydritec Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Anhydritec Ltd

View all case studies (8)
251 Newington Causeway

251 Newington Causeway

The Shard

The Shard

Derby Civic Center

Derby Civic Center

Stadthaus N1

Stadthaus N1