This case study is no longer available.
OVERVIEW
McDonalds were facing a series of challenges with the cost of refurbishment and with new build sites. With downtime a key consideration for franchisees, achieving rapid fit-out speeds was essential. We designed bespoke panels to match tight specifications for size and colour before completing test installs and demonstrating our highly unique position in the market.
We enabled McDonalds to slash refurbishment times in half, from 5 days to 2.5 days and for new builds, from 2 weeks to 1 week.
After our 30 store trial, a period of testing for sustainability and durability commenced over 6 months. The result; in 2021 we'll be rolling out Reco to a further 600 stores.
Contact Reco Surfaces Ltd by clicking the button below to find out which products were used in this case study.
Wall Protection - Leicester Royal Infirmary
Wall Protection - The Priory Ruskin Academy, Grantham
Wall Protection - St Ninians, East Renfrewshire
Wall Protection & Matting - Proton Beam Therapy Centre