At Speedwell Mill the existing damp concrete floor was dug up and excavated ready to install the
breathable LABC registered Glasscrete (Limecrete) floor system. This was to prevent
the old concrete floor from driving ground moisture to the perimeter walls causing
damp issues.
No featured products in this case study
Contact GEOCELL Foam Glass by clicking the button below to find out which
products were used in this case study.