Madrid Airport

OVERVIEW

Working on 100m2 per night, the entire floor of natural stone tiles had to be refurbished whilst the airport remained fully operational. The solution was a high strength ARDEX Ultra Rapid Drying Screed Cement in combination with ARDEX MICROTEC Natural Stone Adhesive, and Rapid Drying Tile Grout.

Products featured in this case study

View all products (92)
ARDEX MG Flexible Rapid Set Tile & Stone Grout

ARDEX MG Flexible Rapid Set Tile & Stone Grout

ARDEX A 35 Ultra Rapid Drying Screed Cement

ARDEX A 35 Ultra Rapid Drying Screed Cement

More case studies from Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

View all case studies (50)
British Museum - London

British Museum - London

Victoria and Albert Museum - London

Victoria and Albert Museum - London

North Manchester General Hospital

North Manchester General Hospital

Burj Khalifa - Dubai

Burj Khalifa - Dubai

More case studies from Quick-drying levelling screed mixes

View all case studies (14)
Madrid Airport

Madrid Airport

Tollcross International Swimming Centre

Tollcross International Swimming Centre

Savoy Hotel Restoration Project

Savoy Hotel Restoration Project

It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks

It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks

More case studies from Cementitious and reaction resin grouts

View all case studies (7)
Madrid Airport

Madrid Airport

McDonald's Tiling Refit for UK Restaurants

McDonald's Tiling Refit for UK Restaurants

London Aquatic Centre - Olympic Pool

London Aquatic Centre - Olympic Pool

Tottenham Court Road Underground Station - London

Tottenham Court Road Underground Station - London