Following the brief outlined by the water treatment plan the proposal adopted for implementation was for the creation of secure access control. Bi-Folding Speed Gates, topped with razor wire were supplied to each of the main entry and exit points to the site. These were supported by PAS 68 rising bollards and rising arm barriers with synchronised operation and traffic light signalling. The gates and barriers were flanked by runs of Jacksons mesh fencing to provide a separate pedestrian entranc…
Show moreContact Jacksons Fencing by clicking the button below to find out which products were used in this case study.
New: Jacksons helps Twickenham Stadium prepare for the Rugby World Cup
New: Improving perimeter safety and security at the Eurotunnel terminal in Coquelles, Calais
Reducing noise with Acoustic Barriers from The Leys School’s sports facilities into neighbouring properties
New: Southern Salads reducing noise and light pollution with Jacksons Acoustic Barriers