NBS Source
I'm a manufacturer

This case study is no longer available.

TAPER-LOC System eases Balustrade installation at New Olympia swimming and leisure complex, Dundee

OVERVIEW

The brand new complex features a 50 metre competition pool, wave pool, rapid river, dive pool, flumes and fitness suite. The Main Pool incorporates a movable floor and end walls to enable it to be reconfigured into a 25 metre Training Pool for clubs and public lane swimming. The TAPER-LOC System was used to create a beautiful frameless balustrade in several areas of the pool and leisure complex. The clean lines of balustrade solution offered a simple but effective method to enclose the different types of seating and staircase arrangements.

No featured products in this case study

Contact C.R. Laurence (CRL) by clicking the button below to find out which products were used in this case study.