NBS Source
I'm a manufacturer

iDecking Project - Finchampstead, Berkshire

OVERVIEW

This 115m² project was a large luxury new-build. The decking required two distinct build-up methods around the house. One section was on a waterproofing membrane, the other on a steel framed walkway. Adjustable support pedestals were loose-laid onto the membrane. iDecking aluminium rail system was set onto the pedestals and EasyClick boards were clicked into place. Pedestals lifted the decking structure off the membrane allowing free drainage and creating a level surface on the falling roof. Aluminium rails were mechanically fixed to the steel structure and the whole terrace was set to one, seamless level wrapping around the house.

No featured products in this case study

Contact Wallbarn Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Wallbarn Ltd

View all case studies (40)
Adjustable Paving Supports - Woodbury Close, Finsbury Park

Adjustable Paving Supports - Woodbury Close, Finsbury Park

Instant Green Roof - Wimbledon - Care Home - M-Tray®

Instant Green Roof - Wimbledon - Care Home - M-Tray®

M-Tray® Instant Green Roof - The May Fair Hotel

M-Tray® Instant Green Roof - The May Fair Hotel

iDecking Project - Dunalastair, Perthshire, Scotland

iDecking Project - Dunalastair, Perthshire, Scotland