Waste Water Treatment Works

OVERVIEW

MAX FRANK supplied Stremaform “self-supporting” concrete jointing system, Pecafil permanent formwork, Fradiflex metal waterstop and Synko-Flex non-expanding waterstop to the largest Waste Water Treatment Works in the UK, which drains the entire western side of Manchester (1.2 Million People) at 30,000 litres per second. The scheme, an expansion of existing treatment works, included 6 circular new primary settlement tanks, an activated sludge plant and 10 circular final settlement tanks. As part of offsite manufacturing philosophy, precast concrete was utilised for many structures on this project.

No featured products in this case study

Contact MAX FRANK Ltd by clicking the button below to find out which products were used in this case study.