by Fixfast Ltd
The DrillFast Stainless composite panel fasteners are the ultimate in reliability, even in the exceptional length required for this project. In this situation the contractor required matching reliability from the delivery schedule, and Fixfast stepped up to the mark, making sure the product was always there when needed.
Contact Fixfast Ltd by clicking the button below to find out which products were used in this case study.
Leeds Arena
America's Test Cup Building
Pondwick's Close, St Albans
Worthing Pools