NBS Source
I'm a manufacturer

"internal shutters for doors and windows"

165 results found

Sort by:

Showing 1-13 of 13

Sponsored
Project Reference Database

Project Reference Database

LATICRETE International, Inc.

LATICRETE Project Reference Database
Sponsored
Orpington - Self Build - Timber and Masonry

Orpington - Self Build - Timber and Masonry

Intelligent Membranes Canada

Renovation stripping out the building completely and rebuilding the walls, Passive Purple® was applied in between the connections of the internal side of the external walls which were a combination of masonry, timber, and steel frame. The ground floor ceiling was removed exposing the warped old timber joists with cracks in the surrounding brickwork and mortar. This was given attention to detail using Passive Purple® Brush to seal above an airtight foam to guarantee the airtightness of this major air leak zone before the final spray coat of Passive Purple® airtight membrane was applied. Passive Purple® was also used to seal window and door linings, ready for the new triple glazed windows to go in. Passive Purple® was sprayed on all the walls and ceiling. This is an ongoing project that still is awaiting an air test, the client is looking to hit 2.5 ach and installing MVHR.
Sponsored
Fire Resistive Glass Opens New Doors for Adaptive Reuse Project

Fire Resistive Glass Opens New Doors for Adaptive Reuse Project

SAFTI FIRST

Adaptive reuse, or the process of taking an old building or structure and repurposing it for something other than what it was originally designed for, has gained a lot traction with developers and architects alike – and for many good reasons. For one thing, it is more economical and sustainable to work with an existing structure than to demolish an old building, clean up the site, and rebuild with entirely new materials. It also helps preserve historical structures that add character to the community, as well as reduce urban sprawl. For the multifamily sector, we’ve seen adaptive reuse applied to old schools, government buildings, warehouses, etc. because these structures are usually centrally located in many downtown areas.
Sponsored
Cincinnati Art Museum Renovation Features Transparent Stairwell

Cincinnati Art Museum Renovation Features Transparent Stairwell

SAFTI FIRST

When the Cincinnati Art Museum embarked on an $11 million renovation, the architects wanted the entrance and main stair to be as inviting as possible. Transparent, fire rated glazing from SAFTI FIRST® was a key component of the design solution. To maximize the vision area in door itself, SuperLite® II-XL 60 in GPX® Builders Series Temperature Rise full-lite doors. In some of the stairwell doors in less prominent locations, SAFTI FIRST® provided SuperLite® X-90 for the vision panels under 100 sq. inches.
Sponsored
CSSBI SSF 18-10:
Sheet Steel Products and Pressure Treated Wood

CSSBI SSF 18-10: Sheet Steel Products and Pressure Treated Wood

Trimet Building Products

IntroductionSheet Steel Roong and SidingLightweight Steel FramingIsolate the Steel and Wood ComponentsAvoid Use of Pressure Treated WoodFastenersMany buildings will include wood members in applicationssuch as sill plates, splash boards, strapping, purlins, door orwindow bucks, and posts. In some of these end-uses it is arequirement that the wood be chemically treated (pressuretreated) to extend the service life.Designers and builders need to be aware that changes in theavailable wood perservatives may impact the durability ofany connected steel components or fasteners.Eective January 1, 2004 the Environmental ProtectionAgency (EPA) banned the use of Chromated CopperArsenate (CCA) as a preservative in treated lumber forresidential construction. This was done in an eort to reducethe use of chromate and arsenic thereby mitigating thepotential health and environmental problems. The woodpreservative industry has been switching to alternativewaterborne compounds including Sodium Borate (SBX),Alkaline Copper Quat (ACQ), Copper Azole (CBA-A and CA-B),and Ammoniacal Copper Zinc Arsenate (ACZA).Unfortunately, research has indicated that ACQ, CBA-A, CA-Band ACZA, the new generation copper-based products, aremore corrosive to galvanized steel than the former CCA.Since ACQ is becoming the predominant preservative in use,the discussions in this paper will refer to it exclusively.The purpose of this Fact Sheet is to convey the recommendations of the sheet steel industry for the application of steelproducts with ACQ pressure treated wood.
Sponsored
San Diego Highrise Uses Fire Rated Glass on South Facade

San Diego Highrise Uses Fire Rated Glass on South Facade

SAFTI FIRST

Because the Sapphire Towers' south facing elevation was in close proximity to the adjacent property, code regulations required the south façade to either be solid, which was contrary to the design, or to have openings with a minimum fire protection of 45 minutes. SAFTI FIRST® engineered a system that met the uniform design demands and performance requirements for the windows and balconies in all 32 floors in the south-facing elevation.
Sponsored
A Nine-Story Lesson in Branding Excellence

A Nine-Story Lesson in Branding Excellence

SAFTI FIRST

SuperLite® II-XLM 120 clear butt-glazed walls with 9 ft. GPX® Builders Series 90 minute Temperature Rise doors creates a light-filled, transparent 2-hour stairwell that is on-brand with Waste Management’s new Houston Headquarters.
Sponsored
The Miracle of 520 West 20th Street

The Miracle of 520 West 20th Street

SAFTI FIRST

The architects at Morris Adjmi wanted large, 11-ft. tall glass walls to highlight the breathtaking views for the reimagined Warehouse in New York City’s growing architectural wonderland of Chelsea. However, the building was on a lot line, mandating 2 hour fire walls. SAFTI FIRST® made this dream a reality by supplying the largest tested and listed 2 hour fire resistive glazing available today. The inclusion of low-iron glass in the fire-resistive glazing units ensured superior clarity and aesthetic continuity with the adjacent non-rated windows. The fire resistive units incorporated high performance glazing and were filled with argon for energy efficiency and occupant comfort.
Sponsored
Utah Business School Features Dramatic Fire Rated Glass Wall

Utah Business School Features Dramatic Fire Rated Glass Wall

SAFTI FIRST

The David Eccles School of Business on the University of Utah campus features a 28- x 18-ft 2 hour interior glass wall with a 90 minute full-vision door in an exit enclosure/stairwell. The architects selected fire rated glass to meet fire rating requirements while providing maximum visibility and natural daylighting in the space. The project’s specifications also required the fire rated glass to have the same optical clarity as the adjacent non-rated glass systems.
Sponsored
Tall Order at the Exploratorium

Tall Order at the Exploratorium

SAFTI FIRST

The newly opened Exploratorium has brought energy and excitement to the city's bustling waterfront. EHDD transformed the historic Pier 15, built in 1915, to a 330,000 square foot indoor and outdoor campus, being touted as the largest net-zero building in the city and potentially the largest net-zero museum in the world. SAFTI FIRST® supplied a total of 19 pairs of 45-minute steel doors 11 pairs on north side and 8 pairs on the south side using SuperLite® II-XL 45 IGU in GPX® Builders Series Fire Protective.
Sponsored
Fire Rated Glass Helps SFPUC Building Achieve LEED Platinum

Fire Rated Glass Helps SFPUC Building Achieve LEED Platinum

SAFTI FIRST

The new San Francisco Public Utilities Commission Headquarters combines maximum daylighting and fire safety with a multi-story, fire rated glass stairwell from SAFTI FIRST. Dubbed as the "greenest building in North America," this Class A LEED Platinum office building features a transparent, 2-hour fire rated stairwell, situated prominently near the main entrance. SAFTI FIRST supplied SuperLite II-XL 120 in GPX Architectural Series Wall Framing and SuperLite II-XL 90 in GPX Builders Series Temperature Rise Door starting from the lobby all the way to the topmost floor.
Sponsored
A Clear Solution for Harvard’s Klarman Hall

A Clear Solution for Harvard’s Klarman Hall

SAFTI FIRST

This new 120,000 square foot, state-of-the-art convening center features a 1,000-seat auditorium that is large enough to host the entire MBA class. The glass atrium floods the multi-purpose lobby with natural light, as well as provides a visual connection between the interior of the building and the outdoor environment. To maximize transparency, SAFTI FIRST® met with the architects during the design phase to create a large, 2-hour, glass wall that separates the lobby from the auditorium while providing a visual connection between them. Since this 2-hour glass wall also serves as the entrance to the auditorium, deciding on a 90-minute door system was of upmost important. SAFTI FIRST®’s in-house engineering department provided design assistance, system details, engineering calculations and support from the planning phase all the way to the submittal process.
Sponsored
THE BENEFITS OF STEEL VS. WOOD FOR MID-RISE BUILDING CONSTRUCTION

THE BENEFITS OF STEEL VS. WOOD FOR MID-RISE BUILDING CONSTRUCTION

Trimet Building Products

Sustainability, durability, fire resistance, structural performance and cost-effectiveness are some of the strongest reasons for using structural steel or cold-formed steel framing in mid-rise building construction. As a dependable, noncombustible material, steel-framed structures provide a wise investment for builders and the occupants who live and work in them. Steel structures provide long-term, consistent performance. • Steel framing will not rot, warp, split, crack or creep. • Steel framing is not vulnerable to termites. • Steel framing does not expand or contract with moisture content. • Steel framing is produced in strict accordance with national standards, with no regional variations. Steel is a noncombustible material and will not contribute to the spread of a fire. • Because steel is noncombustible, it reduces the fire risk to occupants, firefighters and property/business owners. Steel framing improves design efficiency, saves time, and reduces costs. • Steel framing provides a significantly greater strength-to-weight ratio than wood. • Steel framing allows for larger bays and wider frame spacing than wood construction. • Increased flexibility in bay spacing and framing layout maximizes usable floor space for owners and tenants. • Steel is typically fabricated off-site, reducing on-site labor, cycle time and construction waste. • Shorter construction time results in earlier occupancies and lower financing costs. Steel structures perform well during earthquakes and other extreme events. • Steel is a resilient material, with reserve strength and ductility that result in significant advantages in natural disasters such as hurricanes and earth- quakes, and in other extreme events like fire and blast. • Steel construction is engineered to provide a reliable, consistent load path. • Steel construction employs quality control and quality assurance procedures to ensure that the project requirements are met. Steel framing provides environmental benefits and complies with sustainable building standards. • Steel framing results in less scrap and job site waste than lumber. • Structural steel is continually recycled with a current recycling rate of 98 percent, meaning that these steels will still be in use hundreds of years from now, lessening impacts on future generations. • Steel, when recycled, loses none of its inherent properties and can be recycled into different products such as cars, bridges, cans, etc. • Steel can be used to comply with the requirements of sustainable design standards such as the International Green Construction Code (IgCC), ASHRAE Standard 189.1 (Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings), and the National Green Building Standard (ICC-700). Steel can also provide credit points for green building rating systems like the USGBC’s LEED (Leadership in Energy and Environmental Design) and the Green Building Initiative’s ANSI/GBI-01 (Green Building Assessment Protocol for Commercial Buildings).  

Showing 1-13 of 13

Feedback