NBS Source
I'm a manufacturer

"flue linings and terminals"

71 results found

Sort by:

Showing 1-5 of 5

Sponsored
vivaNext mass-transit terminal construction - Toronto, ON.

vivaNext mass-transit terminal construction - Toronto, ON.

Mapei Inc.

Faced with a tight schedule and challenging weather conditions, Belluz Group Ltd. turned to MAPEI for the range of high-end products and support that was needed to complete a new-build terminal project in the heart of Canada’s biggest city.
Sponsored
Boston Building Protects Property Line with Fire Resistive Curtain Wall

Boston Building Protects Property Line with Fire Resistive Curtain Wall

SAFTI FIRST

The west-facing elevation of The Kensington in Boston, MA, was in close proximity to the property line, prompting the building official to require part of the curtain wall had to meet ASTM E-119/NFPA 251/UL263 for 60 minutes. SAFTI FIRST® supplied SuperLite® II-XL 60 insulated with Solarban 70XL in GPX® Curtain Wall Framing in a continuous span from the seventh to the tenth floors.
Sponsored
Fire Rated Glazing Gets Visitors ‘In the Spirit’ of Historic Bourbon Distillery

Fire Rated Glazing Gets Visitors ‘In the Spirit’ of Historic Bourbon Distillery

SAFTI FIRST

As America celebrated National Bourbon Day on June 14, downtown Louisville also celebrated the highly anticipated grand opening of the Old Forester Distillery. This event is also touted as a triumphant return of America’s first bottled bourbon in continuous production by the same family before, during, and after Prohibition to Whiskey Row. See how SAFTI FIRST®’s fire rated glass walls helped create an immersive visitor center with a fully operational distillery, cooperage and bottling line.
Sponsored
The Miracle of 520 West 20th Street

The Miracle of 520 West 20th Street

SAFTI FIRST

The architects at Morris Adjmi wanted large, 11-ft. tall glass walls to highlight the breathtaking views for the reimagined Warehouse in New York City’s growing architectural wonderland of Chelsea. However, the building was on a lot line, mandating 2 hour fire walls. SAFTI FIRST® made this dream a reality by supplying the largest tested and listed 2 hour fire resistive glazing available today. The inclusion of low-iron glass in the fire-resistive glazing units ensured superior clarity and aesthetic continuity with the adjacent non-rated windows. The fire resistive units incorporated high performance glazing and were filled with argon for energy efficiency and occupant comfort.
Sponsored
Orpington - Self Build - Timber and Masonry

Orpington - Self Build - Timber and Masonry

Intelligent Membranes Canada

Renovation stripping out the building completely and rebuilding the walls, Passive Purple® was applied in between the connections of the internal side of the external walls which were a combination of masonry, timber, and steel frame. The ground floor ceiling was removed exposing the warped old timber joists with cracks in the surrounding brickwork and mortar. This was given attention to detail using Passive Purple® Brush to seal above an airtight foam to guarantee the airtightness of this major air leak zone before the final spray coat of Passive Purple® airtight membrane was applied. Passive Purple® was also used to seal window and door linings, ready for the new triple glazed windows to go in. Passive Purple® was sprayed on all the walls and ceiling. This is an ongoing project that still is awaiting an air test, the client is looking to hit 2.5 ach and installing MVHR.

Showing 1-5 of 5

Feedback