NBS Source
I'm a manufacturer

"concrete framed systems"

347 results found

Sort by:

Showing 1-29 of 29

Sponsored
Real Steel Cost Advantages – Consider. Choose. Challenge.

Real Steel Cost Advantages – Consider. Choose. Challenge.

Trimet Building Products

Start at the foundation where the loads imposed by a steel frame are up to 50% less than those of a concrete alternative. There is evidence in the field and through third-party case studies and comparative cost studies that steel building systems offer significant cost benefits over competitive building materials when the total cost of construction is considered.
Sponsored
GPX® Framing with Sunshade Connectors at Doolittle BART Station

GPX® Framing with Sunshade Connectors at Doolittle BART Station

SAFTI FIRST

For BART's Doolittle Maintenance Facility at the new Oakland Airport connector, SAFTI FIRST® provided 60 minute, fire resistive wall openings in the exterior using SuperLite® II-XL 60 insulated with low-e glazing in GPX® Framing with a clear anodized finish. SAFTI FIRST® engineered a connection that allows the structural elements of the GPX® Architectural Series Framing System to support an integral sunshade system, instead of being hung in front of it. The Doolittle Bart Station is one of the first installations of the GPX® Architectural Series System with sunshade connections, which also include SLCC New Instruction and Administrative Building in Salt Lake City, UT.
Sponsored
CSSBI SSF 19-05:
Explosion Venting for Steel Frame Buildings

CSSBI SSF 19-05: Explosion Venting for Steel Frame Buildings

Trimet Building Products

Executive Summary The aim of this fact sheet is to advocate an alternative solution for the Steel Industry in regards to restrictive code provisions for explosion venting that are now mandated by the Ontario Fire Code (OFC). Due to a September 2000 amendment of code provisions dealing with explosion venting in the OFC, explosion vent designs were required to be in conformance with NFPA 68, the National Fire Protection Association’s (NFPA) Guide for Venting of Deflagrations. NFPA 68 gives a prescriptive solution that has upper bound limits on size and mass of an explosion vent panel, which the Steel Industry finds are too small to be practical. The Canadian Steel Construction Council (CSCC) investigated this problem and identified an alternate design guideline from the Factory Mutual Insurance Company’s (FM) Property Loss Prevention Data Sheets, numbered 1-44 and entitled “Damage Limiting Construction”. FM’s 1-44 Data Sheets can be used to develop an alternate solution for explosion venting that exceed the size and mass limits of the NFPA 68 prescriptive solution, and can be submitted for approval under the Compliance Equivalency provisions in the OFC. With the introduction of an objective based National Building Code Canada (NBCC) in 2005 followed by Provincial code adoptions in 2006 it would be worthwhile to establish a precedent through the Compliance Equivalency provision in the OFC. Once a precedent setting case occurs, the “acceptable solution” or “compliance alternative” would go on record and aid in resolving subsequent proposals for Compliance Equivalency, and also support a future technical change in the OFC. The CSCC by way of this fact sheet would advocate this alternative solution for the Steel Industry when designing explosion vent panels in steel framed buildings.
Sponsored
THE BENEFITS OF STEEL VS. WOOD FOR MID-RISE BUILDING CONSTRUCTION

THE BENEFITS OF STEEL VS. WOOD FOR MID-RISE BUILDING CONSTRUCTION

Trimet Building Products

Sustainability, durability, fire resistance, structural performance and cost-effectiveness are some of the strongest reasons for using structural steel or cold-formed steel framing in mid-rise building construction. As a dependable, noncombustible material, steel-framed structures provide a wise investment for builders and the occupants who live and work in them. Steel structures provide long-term, consistent performance. • Steel framing will not rot, warp, split, crack or creep. • Steel framing is not vulnerable to termites. • Steel framing does not expand or contract with moisture content. • Steel framing is produced in strict accordance with national standards, with no regional variations. Steel is a noncombustible material and will not contribute to the spread of a fire. • Because steel is noncombustible, it reduces the fire risk to occupants, firefighters and property/business owners. Steel framing improves design efficiency, saves time, and reduces costs. • Steel framing provides a significantly greater strength-to-weight ratio than wood. • Steel framing allows for larger bays and wider frame spacing than wood construction. • Increased flexibility in bay spacing and framing layout maximizes usable floor space for owners and tenants. • Steel is typically fabricated off-site, reducing on-site labor, cycle time and construction waste. • Shorter construction time results in earlier occupancies and lower financing costs. Steel structures perform well during earthquakes and other extreme events. • Steel is a resilient material, with reserve strength and ductility that result in significant advantages in natural disasters such as hurricanes and earth- quakes, and in other extreme events like fire and blast. • Steel construction is engineered to provide a reliable, consistent load path. • Steel construction employs quality control and quality assurance procedures to ensure that the project requirements are met. Steel framing provides environmental benefits and complies with sustainable building standards. • Steel framing results in less scrap and job site waste than lumber. • Structural steel is continually recycled with a current recycling rate of 98 percent, meaning that these steels will still be in use hundreds of years from now, lessening impacts on future generations. • Steel, when recycled, loses none of its inherent properties and can be recycled into different products such as cars, bridges, cans, etc. • Steel can be used to comply with the requirements of sustainable design standards such as the International Green Construction Code (IgCC), ASHRAE Standard 189.1 (Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings), and the National Green Building Standard (ICC-700). Steel can also provide credit points for green building rating systems like the USGBC’s LEED (Leadership in Energy and Environmental Design) and the Green Building Initiative’s ANSI/GBI-01 (Green Building Assessment Protocol for Commercial Buildings).  
Sponsored
Passivhaus CPD Training Facility

Passivhaus CPD Training Facility

Intelligent Membranes Canada

We built the world first Passivhaus CPD training facility / pub, this is the worlds most airtight pub at 0.07ach at 50 pa. This is a twin wall timber frame, it’s 450mm wide insulation Huntsman which is made of thousands of recycled plastic bottles. Huntsman also recycled 1 billion plastic bottles from the sea last year. We have a 7.2 KW system solar panels system that powers the building, it’s got MVHR Nilan. On the external façade we applied Passive Purple External which is airtight up to 0.03ach.
Sponsored
Fire Rated Glazing Adds Visual Appeal to Parking Garages

Fire Rated Glazing Adds Visual Appeal to Parking Garages

SAFTI FIRST

Codes required fire wall separations between parking garages and businesses, markets, homes and other uses. Architects can replace entire walls with glass to open up buildings like never before. For example, SuperLite® II-XL in GPX® Architectural Series Framing by SAFTI FIRST® is a USA-made fire resistive transparent wall system that blocks radiant heat and meets the same stringent ASTM E-119/ UL 263/ NFPA 251 code requirements that any opaque fire rated wall must meet.
Sponsored
Fire Rated Glass Provides Privacy, Daylight at Ridgewood High

Fire Rated Glass Provides Privacy, Daylight at Ridgewood High

SAFTI FIRST

For a recent renovation of a stairwell and exit corridors at Ridgewood High School in Illinois, the design team specified SuperLite® II-XL 60 in GPX® Architectural Series Framing for its optical clarity, storefront-like appearance, and high STC ratings. In order to meet the code requirements and maximize the daylight penetrating into the building, the architects decided to use fire rated glass in the one-hour exit corridor. Because the glazing exceeds 25% of the wall area, fire resistive glass and framing assemblies rated equal to the wall had to be used.
Sponsored
Fire Rated Glass Transforms Retail Parking Garage with Natural Light and Vision

Fire Rated Glass Transforms Retail Parking Garage with Natural Light and Vision

SAFTI FIRST

Traditional parking garage designs used to have opaque fire rated building materials like concrete, masonry and drywall which made these spaces dark, cold and uninviting. That all changed, thanks to the emergence of new technology, clear, fire resistive glazing tested to ULC/CAN S101 up to 2 hours that are available in large sizes and low-iron glass make-ups with high visible light transmission for superior clarity and color neutrality.
Sponsored
Fire Rated Glass Adds Safety to Nanobioelectronics Clean Room

Fire Rated Glass Adds Safety to Nanobioelectronics Clean Room

SAFTI FIRST

The Joint School of Nanoscience & Nanoengineering within the Gateway University Research Park in Greensboro, North Carolina is a new 105,000 sf interdisciplinary research facility dedicated to academic and industrial research. To create an open, transparent lab design, SAFTI FIRST® provided SuperLite® II-XL 60 in GPX® Architectural Series Frames for the 60 minute walls.
Sponsored
Technical College Renovation Features Fire Rated Glass Walls

Technical College Renovation Features Fire Rated Glass Walls

SAFTI FIRST

Central to the building's design are several simulation labs, practice labs, and mock operating rooms where students can observe instructors and each other as they perform their tasks. Because these labs are in areas where a 1-hour fire rating has to be maintained, the architects chose to combine vision, transparency, and fire safety with SuperLite® II-XL 60 in GPX® Architectural Series framing.
Sponsored
Clear, Fire Resistive Butt-Glazed Walls Create Transparent, Connected and Code-compliant Stairwell

Clear, Fire Resistive Butt-Glazed Walls Create Transparent, Connected and Code-compliant Stairwell

SAFTI FIRST

The University of Wisconsin School of Business Grainger Hall’s east and west wings are now linked by a state-of-the-art Learning Commons that encourages collaboration through technology and design. To achieve maximum transparency while meeting code requirements, the architects specified 9 ft. tall, clear, fire resistive butt-glazed walls using SuperLite® II-XLM in GPX® Architectural Series perimeter framing.
Sponsored
Boston Building Protects Property Line with Fire Resistive Curtain Wall

Boston Building Protects Property Line with Fire Resistive Curtain Wall

SAFTI FIRST

The west-facing elevation of The Kensington in Boston, MA, was in close proximity to the property line, prompting the building official to require part of the curtain wall had to meet ASTM E-119/NFPA 251/UL263 for 60 minutes. SAFTI FIRST® supplied SuperLite® II-XL 60 insulated with Solarban 70XL in GPX® Curtain Wall Framing in a continuous span from the seventh to the tenth floors.
Sponsored
Glazing Offers a Fire and Hurricane Rated Solution for US Veterans

Glazing Offers a Fire and Hurricane Rated Solution for US Veterans

SAFTI FIRST

The new Orlando VA Medical Center needed glazing that would not only provide light and transparency, but fire and hurricane protection and improved energy performance. SuperLite® II-XL in GPX® Hurricane Framing from SAFTI FIRST® was installed in exterior fire-rated locations that were exposed to the elements. These assemblies were rigorously tested and certified for fire and radiant heat protection for up to two hours, large missile impact, air and water infiltration, and cyclic wind loading.
Sponsored
Glass Curtain Wall Lets Light In and Keeps Fire Out

Glass Curtain Wall Lets Light In and Keeps Fire Out

SAFTI FIRST

Prairie Hills Junior High School's south-facing elevation features a glazed aluminum curtain wall that incorporates PPG Solarblue and PPG Solarban 60 glazing. Parts of the curtain wall had to meet a two-hour rating because it was adjacent to a two-hour block wall through the building's interior. SAFTI FIRST® supplied SuperLite® II-XL 120 IGU in GPX® Curtain Wall Framing in order to meet ASTM E-119/NFPA 251/UL263 requirements.
Sponsored
Fire Rated Glass Helps SFPUC Building Achieve LEED Platinum

Fire Rated Glass Helps SFPUC Building Achieve LEED Platinum

SAFTI FIRST

The new San Francisco Public Utilities Commission Headquarters combines maximum daylighting and fire safety with a multi-story, fire rated glass stairwell from SAFTI FIRST. Dubbed as the "greenest building in North America," this Class A LEED Platinum office building features a transparent, 2-hour fire rated stairwell, situated prominently near the main entrance. SAFTI FIRST supplied SuperLite II-XL 120 in GPX Architectural Series Wall Framing and SuperLite II-XL 90 in GPX Builders Series Temperature Rise Door starting from the lobby all the way to the topmost floor.
Sponsored
Medical Center Maximizes Natural Daylight with Fire Rated Glass

Medical Center Maximizes Natural Daylight with Fire Rated Glass

SAFTI FIRST

Central to the new UC Davis Medical Center Surgery and Emergency Services Pavilion's design was a large skylight that allows natural light to vertically flow into the atrium area and other light wells throughout the building. However, they also wanted to let light flow horizontally into the adjacent hallways, rooms, etc. Because the walls in the atrium and light wells have to meet a 2-hour rating, Stantec Architects approached SAFTI FIRST® for a solution. Large portions of the 2 hour atrium and light well walls were made “transparent” with the use of SuperLite® II-XL 120 in GPX® Framing.
Sponsored
Fire Resistive Curtain Wall at Aspen Art Museum

Fire Resistive Curtain Wall at Aspen Art Museum

SAFTI FIRST

Designed by Pritzker prize winning architect Shigeru Ban, the brand new 33,000 sf Aspen Art Museum boasts large exterior glass walls designed to keep the visitors engaged with views of the beautiful Aspen landscape. SAFTI FIRST®’s engineering team provided design assistance and supplied a 2 hour fire resistive curtain wall with SuperLite® II-XL 120 with Starphire Ultra-Clear Glass insulated with Viracon VE13-85 in GPX® Curtain Wall Framing. A woven screen encloses the glass curtain wall to provide shading from direct sunlight.
Sponsored
Steel: unparalleled fire safety

Steel: unparalleled fire safety

Trimet Building Products

Steel: unparalleled fire safety Life safety, and specifically fire protection, has been a primary concern of the building codes. Steel is a non-combustible material and consequently does not burn, provide an ignition source or add fuel load that would enable a fire to spread or grow into a catastrophic event. Steel does not melt at temperatures typically encountered in a building fire. Its non-combustibility and assembly fire ratings do not degrade over the lifecycle of a building. This provides a reduced fire risk, to workers and occupants, minimizes the impact on municipal fire services, decreases the reliance on sprinklers, and results in less property damage and collateral damage to adjacent buildings if a fire should ever occur. • Steel has a melting point of approximately 1,500ºC (2,700ºF). In a typical fire, such as in an office, residential or retail occupancy, the maximum temperature of a fully developed fire will not likely exceed a range of 800ºC to 900ºC (1,500ºF to 1,650ºF), though it could reach a peak of 1,100ºC (2,000ºF) for a short duration. • Building codes recognize the fact that buildings, designed with non-combustible materials like steel, pose less of a fire risk to the public than combustible systems, which are limited to six storeys in height in Canada and 25.9m (85 ft.) in the US. STEEL IS A NON-COMBUSTIBLE MATERIAL AND CONSEQUENTLY DOES NOT BURN, nor does it provide an ignition source or add fuel load that would enable a fire to spread or grow into a catastrophic event. “Changes in the building codes that allow combustible framing in taller and larger buildings have gone too far and it’s created a perfect storm that can quickly overwhelm the ability of the fire service to respond.” CHIEF STEVE LOHR, HAGERSTOWN (MD) FIRE DEPARTMENT
Sponsored
Orpington - Self Build - Timber and Masonry

Orpington - Self Build - Timber and Masonry

Intelligent Membranes Canada

Renovation stripping out the building completely and rebuilding the walls, Passive Purple® was applied in between the connections of the internal side of the external walls which were a combination of masonry, timber, and steel frame. The ground floor ceiling was removed exposing the warped old timber joists with cracks in the surrounding brickwork and mortar. This was given attention to detail using Passive Purple® Brush to seal above an airtight foam to guarantee the airtightness of this major air leak zone before the final spray coat of Passive Purple® airtight membrane was applied. Passive Purple® was also used to seal window and door linings, ready for the new triple glazed windows to go in. Passive Purple® was sprayed on all the walls and ceiling. This is an ongoing project that still is awaiting an air test, the client is looking to hit 2.5 ach and installing MVHR.
Sponsored
CSSBI SSF 42-15:
Fastening Prepainted Sheet Steel Roofing and Siding

CSSBI SSF 42-15: Fastening Prepainted Sheet Steel Roofing and Siding

Trimet Building Products

Introduction Sheet steel roofing and siding (cladding) is available in a wide variety of profiles, colours and paint systems. The modern prepainted systems used on Canadian-made products will provide decades of beautiful performance before there are any visible signs of deterioration of the paint surface. However, an important component of the cladding system is the fastener used to attach it to the structure. This fastener is not simply a screw; it is part of the roof or wall assembly and should be expected to provide the same long-term performance. This performance is not simply the capacity to safely hold the cladding in place, but also to match the colour and durability of the paint system. The selection of the correct screw for the job is the first step in the creation of a cladding system that will provide long-term performance. The next step is the installation. Installing screws in sheet steel cladding is commonplace and can be done very efficiently. The tool manufacturers have developed a wide range of options for installing fasteners into any type of substrate. Selecting the most appropriate tool will help the installation process.
Sponsored
Care and Maintenance of Prefinished Sheet Steel
Building Products

Care and Maintenance of Prefinished Sheet Steel Building Products

Trimet Building Products

Introduction Prefinished sheet steel building products, such as wall and roof cladding, liner sheet, flashing, and associated items, have experienced an enviable growth record during the past twenty years or so. Coil coated prefinished sheet steel in a variety of colours and paint systems has greatly enhanced the appearance of thousands of industrial, commercial, institutional, recreational, residential and farm buildings, providing an economical, durable and attractive alternative to traditional materials. As with all materials, a little care and maintenance pays off handsomely in terms of longevity and repair costs. The recommendations which follow have been learned at first hand and represent the collective industry experience with thin-film paint systems applied to metallic coated sheet steel by the coil coating process. In this publication the term “thin-film paint system” refers to a modified silicone polyester or a fluorocarbon type having a coating thickness about 25µm. When the guidelines listed below have been observed, thin-film paint systems have been used successfully for all types of environments other than severe industrial atmospheres which require special consideration. The guidelines are not intended for barrier coatings, laminates, and new formulations which have different characteristics than the thin-film paint systems on which these guidelines are predicated. 
Sponsored
Cost Considerations for
Prepainted Sheet Steel Cladding

Cost Considerations for Prepainted Sheet Steel Cladding

Trimet Building Products

This Fact Sheet has been written to describe some of the factors that affect the cost of prepainted sheet steel cladding products. The most significant factors are: colour, paint system, order quantity, Fabricator's inventory and profile selection. Recognition of the impact of these factors can help you select a prepainted sheet steel cladding system to fit the aesthetic and durability requirements of your project, and still stay within a budget. 
Sponsored
Fire Resistive Curtain Wall at NYC Midtown Community Court

Fire Resistive Curtain Wall at NYC Midtown Community Court

SAFTI FIRST

The 1890s-era Midtown Community Court in New York City—a New York Historic Landmark—is currently undergoing a five year, $18 million renovation that includes a 9,650-square-foot addition for a new elevator, lobby and stairwell featuring fire resistive glass and curtain wall. The system consists of SAFTI FIRST®’s SuperLite® II-XL 120 IGU in GPX® Curtain Wall System.
Sponsored
CSSBI SSF 18-10:
Sheet Steel Products and Pressure Treated Wood

CSSBI SSF 18-10: Sheet Steel Products and Pressure Treated Wood

Trimet Building Products

IntroductionSheet Steel Roong and SidingLightweight Steel FramingIsolate the Steel and Wood ComponentsAvoid Use of Pressure Treated WoodFastenersMany buildings will include wood members in applicationssuch as sill plates, splash boards, strapping, purlins, door orwindow bucks, and posts. In some of these end-uses it is arequirement that the wood be chemically treated (pressuretreated) to extend the service life.Designers and builders need to be aware that changes in theavailable wood perservatives may impact the durability ofany connected steel components or fasteners.Eective January 1, 2004 the Environmental ProtectionAgency (EPA) banned the use of Chromated CopperArsenate (CCA) as a preservative in treated lumber forresidential construction. This was done in an eort to reducethe use of chromate and arsenic thereby mitigating thepotential health and environmental problems. The woodpreservative industry has been switching to alternativewaterborne compounds including Sodium Borate (SBX),Alkaline Copper Quat (ACQ), Copper Azole (CBA-A and CA-B),and Ammoniacal Copper Zinc Arsenate (ACZA).Unfortunately, research has indicated that ACQ, CBA-A, CA-Band ACZA, the new generation copper-based products, aremore corrosive to galvanized steel than the former CCA.Since ACQ is becoming the predominant preservative in use,the discussions in this paper will refer to it exclusively.The purpose of this Fact Sheet is to convey the recommendations of the sheet steel industry for the application of steelproducts with ACQ pressure treated wood.
Sponsored
Rockwool and Passive Purple

Rockwool and Passive Purple

Intelligent Membranes Canada

Case study of Rockwool and Passive Purple together in a system and how together they are the perfect match for airtight buildings.
Sponsored
Skyline Lodge - Highlands, NC, USA.

Skyline Lodge - Highlands, NC, USA.

Mapei Inc.

MAPEI’s Mapeheat™ radiant floor-heating system adds an extra touch of luxury to a five-star lodge.
Sponsored
Repainting Factory
Prefinished Metal Panels

Repainting Factory Prefinished Metal Panels

Trimet Building Products

Introduction Prefinished sheet steel is used on many building products from wall cladding, to architectural roofing to interior panels. Prefinished sheet steel has been used in Canada for over 30 years and there may be sites were the paint surface is in need of repainting. This bulletin is intended to give some guidance on repainting prefinished panels. Due to the diversity of factory applied prefinished systems, and the diversity of potential field applied repaint systems, it is impossible to offer one comprehensive repaint procedure for all possible situations. However, it is possible to offer a set of guidelines to be considered in every potential situation.
Sponsored
CSSBI SSF 21-06:
Low Sloped Steel Roofing - The Winners in Life Cycle Cost Analysis

CSSBI SSF 21-06: Low Sloped Steel Roofing - The Winners in Life Cycle Cost Analysis

Trimet Building Products

An independent assessment of the life cycle cost for various low slope roof systems revealed that steel roofing had the longest life span, no leaks due to material failures, and the lowest overall maintenance cost.
Sponsored
CSSBI SSF 20-14:
Recycled Content of Steel Building Products

CSSBI SSF 20-14: Recycled Content of Steel Building Products

Trimet Building Products

The construction industry is a vital part of the growth and success of a country. It is responsible for building the physical infrastructure that provides transportation and facilities for citizens, businesses, industries and institutions. Construction has a major influence on the economic wealth, societal well¬being and sustainability of the built environment. The Canadian construction industry employs more than 1.2 million people. In 2010 it accounted for 6% of Canada’s gross domestic product (GDP), with a total value of 73.8 billion dollars. From 2000 to 2010, the GDP from construction increased 42.7% whereas GDP for all industries increased 20.2%.(1) Construction also has a profound impact on our natural environment. In North America, the built environment accounts for approximately one third of all the greenhouse gas (GHG) emissions, as well as energy, water and materials consumption. Given the increased awareness of “green” construction, there is growing interest in using steel because of the major recycled content and recyclability attributes it provides to architects, engineers and specifiers in the construction industry. The steel industry, through the Canadian Sheet Steel Building Institute is committed to providing steel solutions that promote the use of sustainable materials in construction applications. This fact sheet provides an overview of the two main methods used to produce steel, and describes the recycled content of the steels used to manufacture building products such as roofing, cladding, decking, structural and non-structural framing and the many other construction products used in the industry. Once iron ore is extracted and refined into steel, its life never ends. This makes steel an ideal material to deploy in sustainable strategies for the construction industry. Today’s steel is produced using two technologies both of which require “old” (recycled scrap) steel to make “new” steel. The combination of these technologies enables Canadian steel mills the flexibility to produce a variety of steel grades for a wide range of product applications

Showing 1-29 of 29

Feedback