NBS Source
I'm a manufacturer

"access panels"

181 results found

Sort by:

Showing 1-13 of 13

Sponsored
Staples

Staples

Hush Acoustics (Canada)

Since 2020, Hush Acoustics has been collaborating with Staples on a nationwide project to enhance the acoustic environment across their North American stores. The goal was to replace conventional materials with those offering superior acoustic properties, all while preserving Staples’ iconic brand look and feel. This ambitious project spans across the nation, aiming to transform the auditory experience in Staples stores without compromising on aesthetics.
Sponsored
Environmental Product Declaration 
Roll Formed Steel Panels

Environmental Product Declaration Roll Formed Steel Panels

Trimet Building Products

Environmental Product Declaration Roll Formed Steel Panels
Sponsored
Repainting Factory
Prefinished Metal Panels

Repainting Factory Prefinished Metal Panels

Trimet Building Products

Introduction Prefinished sheet steel is used on many building products from wall cladding, to architectural roofing to interior panels. Prefinished sheet steel has been used in Canada for over 30 years and there may be sites were the paint surface is in need of repainting. This bulletin is intended to give some guidance on repainting prefinished panels. Due to the diversity of factory applied prefinished systems, and the diversity of potential field applied repaint systems, it is impossible to offer one comprehensive repaint procedure for all possible situations. However, it is possible to offer a set of guidelines to be considered in every potential situation.
Sponsored
Position Paper on Oil-Canning: Specifying Wide Flat
Panels in Metal Cladding

Position Paper on Oil-Canning: Specifying Wide Flat Panels in Metal Cladding

Trimet Building Products

What is Oil-Canning? Oil-canning is associated with all thin sheet metal products and occurs in the wide flat portions of the cladding profile. It is seen as a series of standing waves, or regular bumps and hollows alternating along the flat length of the panel. This waviness, when viewed under certain conditions, can be undesirable aesthetically and may not meet with the owner’s expectations. The CSSBI wants to help avoid this situation. The cladding manufacturers are aware of the potential for oil-canning in the cladding profiles and can help minimize the effect. It is important for the proper steps to be taken during manufacturing and installation to produce a quality finished product; therefore, specifiers should insist on product from a reliable, experienced cladding manufacturer, like a CSSBI member company. Quality control, however, cannot end on the shop floor. The building project needs the cooperation and knowledge of everyone involved to enhance the quality of the finished job. Oil-canning is a phenomenon that can be managed if the following factors are considered at the beginning of a project.
Sponsored
Caspian Waterfront

Caspian Waterfront

FutureGlass

Scope of WorkProcess, deliver and install façade cone glazing for the dome.Build Up12mm FT HST Sunguard Neutral 50 + 16mm Black Warm Edge spacer + 88.4 Clear HSProject DetailsCaspian Waterfront is the reimagined building of the original government congress centre. In 2016, local developer Pasha Construction started transforming the building into a 120,000 sq. m. retail entertainment and leisure complex. Located on the shore of the Caspian Sea, the structure opens onto the waterfront on three sides.The retail centre’s unique structure posed a challenge. The building complex has geometric shapes similar to the Sydney Opera House, with shell roofs that reflect the surrounding water. The central flame tower has an eight-angled glass façade inspired by the country’s emblem, the eight-pointed star. Since the building would resemble a place of pride, we had to ensure that our panels surpassed every quality level. Due to the unique triangular shape of the glass panels extra care had to be taken during production, delivery and installation to prevent injury, breakage and damage.At Future Glass, we always prioritise quality. Our state-of-the-art processing facility enabled us to deliver the panels on time with minimal on-site rejections. Today, Caspian Waterfront has become a national symbol of Azerbaijan.
Sponsored
Residential Steel Roofing The Long Term Choice

Residential Steel Roofing The Long Term Choice

Trimet Building Products

Steel has been used in North American construction projects for more than 150 years and still remains one of the strongest, most durable and economical building materials available today. Although steel has been traditionally associated with high-rise buildings, bridge structures and commercial and industrial projects, it is rapidly emerging as the logical material of choice for residential construction. Cold formed sheet steel panels are lightweight, economical, easy to handle and represent a high quality alternative to traditional roofing materials. Environmental and economic considerations have prompted many residential homeowners to investigate alternative building materials and methods, and steel roofing panels have proven technical benefits as well as excellent recycling capabilities which make them an increasingly popular choice. This follows the long-time use of steel roofing in commercial construction where steel has built undisputable quality and performance records. 
Sponsored
Cincinnati Art Museum Renovation Features Transparent Stairwell

Cincinnati Art Museum Renovation Features Transparent Stairwell

SAFTI FIRST

When the Cincinnati Art Museum embarked on an $11 million renovation, the architects wanted the entrance and main stair to be as inviting as possible. Transparent, fire rated glazing from SAFTI FIRST® was a key component of the design solution. To maximize the vision area in door itself, SuperLite® II-XL 60 in GPX® Builders Series Temperature Rise full-lite doors. In some of the stairwell doors in less prominent locations, SAFTI FIRST® provided SuperLite® X-90 for the vision panels under 100 sq. inches.
Sponsored
Chicago Starbucks Reserve Turns Stair-Climbing Into Unforgettable Experience Using Fire Rated Glass

Chicago Starbucks Reserve Turns Stair-Climbing Into Unforgettable Experience Using Fire Rated Glass

SAFTI FIRST

The Starbucks Reserve Roastery in Chicago features an incredible, 4-story mural by local artist Eulojio Ortega. The mural, brilliant for conveying the story as visitors go from floor to floor, is interestingly located in an exit stairwell. Traditionally, stairwells are enclosed in opaque walls, leaving them dark, isolated, and rarely utilized unless in an emergency. To allow the mural to be visible through multiple floors, encourage stair usage and meet fire rated code requirements, the architects redesigned the 2- hour stairwell using transparent, floor-to-ceiling butt-glazed glass walls with the largest tested and listed fire resistive glass panels available.
Sponsored
CSSBI SSF 19-05:
Explosion Venting for Steel Frame Buildings

CSSBI SSF 19-05: Explosion Venting for Steel Frame Buildings

Trimet Building Products

Executive Summary The aim of this fact sheet is to advocate an alternative solution for the Steel Industry in regards to restrictive code provisions for explosion venting that are now mandated by the Ontario Fire Code (OFC). Due to a September 2000 amendment of code provisions dealing with explosion venting in the OFC, explosion vent designs were required to be in conformance with NFPA 68, the National Fire Protection Association’s (NFPA) Guide for Venting of Deflagrations. NFPA 68 gives a prescriptive solution that has upper bound limits on size and mass of an explosion vent panel, which the Steel Industry finds are too small to be practical. The Canadian Steel Construction Council (CSCC) investigated this problem and identified an alternate design guideline from the Factory Mutual Insurance Company’s (FM) Property Loss Prevention Data Sheets, numbered 1-44 and entitled “Damage Limiting Construction”. FM’s 1-44 Data Sheets can be used to develop an alternate solution for explosion venting that exceed the size and mass limits of the NFPA 68 prescriptive solution, and can be submitted for approval under the Compliance Equivalency provisions in the OFC. With the introduction of an objective based National Building Code Canada (NBCC) in 2005 followed by Provincial code adoptions in 2006 it would be worthwhile to establish a precedent through the Compliance Equivalency provision in the OFC. Once a precedent setting case occurs, the “acceptable solution” or “compliance alternative” would go on record and aid in resolving subsequent proposals for Compliance Equivalency, and also support a future technical change in the OFC. The CSCC by way of this fact sheet would advocate this alternative solution for the Steel Industry when designing explosion vent panels in steel framed buildings.
Sponsored
CSSBI SSF 24-07:
Natural Finish Metallic Coatings - Attractive but not Architectural

CSSBI SSF 24-07: Natural Finish Metallic Coatings - Attractive but not Architectural

Trimet Building Products

Architects and Specification Writers are increasingly selecting unpainted metallic coated steels for architectural roofing and cladding applications on building exteriors where they want a “Silver” metallic finish. This is occurring more frequently, and even on “prestige” type projects. The Canadian Sheet Steel Building Institute whose fabricator members manufacture a wide variety of building panel profiles for roofing and cladding applications, are being asked to supply unpainted (natural finish) galvanized or resin coated 55% Aluminum-Zinc coated steel for these architecturally exposed end uses. Oftentimes, these materials are specified because the designer finds the natural finish of these products very appealing and sometimes because of material cost savings opportunities. This Fact Sheet has been developed to provide guidance in material selection and provide information on the Architectural Metallic Finishes that are available for highly visible steep slope roofing and cladding applications. 
Sponsored
Revolutionary Electro Polarization Performance in Campus Germany, Dubai Expo 2020

Revolutionary Electro Polarization Performance in Campus Germany, Dubai Expo 2020

FutureGlass

1.  About the ProjectOne of the most prestigious national pavilions at Expo 2020 Dubai, The German Pavilion, represented the Federal Republic of Germany's commitment to innovation and sustainability. Designed by renowned Berlin-based LAVA Architects, this 4,600 m² architectural showcase demonstrated Germany's leadership in environmental technology and intelligent building solutions through its unique "forest of steel poles" design.Project Specifications:Location: World Expo 2020 Dubai, UAEBuilding Owner: German Federal Ministry for Economic Affairs and EnergyArchitect: LAVA Architects, BerlinFacade Contractor: Future Glazing LLC, UAEMain Contractor: ARGE Deutscher Pavilion EXPO 2020 Dubai GbRInstallation Date: June 2021Exhibition Period: 6 months with over 3 million international visitorsTotal Pavilion Area: 4,600 m²FutureX Eclipse™ Intelligent Glazing Area: 113 m²2. The ChallengeFuture Glass was tasked with creating intelligent facade elements that would perform flawlessly in Dubai's extreme desert climate while maintaining perfect environmental control for millions of international visitors. The architects required a building envelope that could respond instantly to rapidly changing conditions including sandstorms, intense solar radiation, and temperatures exceeding 45°C.The project demanded breakthrough glazing technology that could eliminate mechanical shading systems while providing instant environmental adaptation. The design called for individual glass panels to operate independently whilst maintaining overall design coherence across the pavilion's complex geometry. Additionally, the system needed to be maintenance-free, withstand sandstorm conditions, and deliver consistent performance throughout the six-month exhibition period without any mechanical intervention.Given the prestigious nature of this international exhibition space, any failure or performance degradation would have significant reputational impact, making reliability and consistent operation absolutely critical.3. The OutcomeThe FutureX Eclipse™ installation delivered exceptional environmental control, enabling Campus Germany to maintain perfect occupant comfort for international visitors while showcasing German innovation in intelligent building technology. The electropolarization system responded instantly to Dubai's challenging environmental conditions, providing seamless transitions between maximum transparency and sophisticated solar protection in one second or less.The installation demonstrated zero mechanical shading requirements across the entire facade system, with individual 1.5-meter wide rotatable glass elements operating flawlessly throughout the exhibition period. The success of this project established new benchmarks for intelligent glazing performance in extreme climatic conditions and proved that breakthrough electropolarization technology could transform architectural vision into responsive, high-performance building envelopes.The pavilion's environmental control system impressed over 3 million visitors and received international recognition for its innovative integration of intelligent building technology with sophisticated architectural design.4. Products UsedFutureX Eclipse™ Electropolarization Switchable Glass System:Surface Area: 113 m² of intelligent glazing elementsQuantity: 61 individual switching unitsGeometry: Rectangular configurations with rotational capabilityConfiguration: 28 fixed glass panels, 4 standard doors, and 29 intelligent folding door elementsSwitching Speed: ≤1 second response timePerformance: Neutral colour throughout all switching statesTechnology: Eclipse® electropolarization switching layer with controlled electrical field modulationControl System: Individual panel control with building automation integrationEnvironmental Rating: Designed for extreme desert climate operation including sandstorm resistance
Sponsored
White City Phase 2

White City Phase 2

FutureGlass

Nestled in the heart of a revitalized West London neighborhood, White City Living offers a unique residential experience. Built on a formerly isolated industrial site, the property boasts stunning views of a serene stream winding through elegant lawns and low-hanging trees. The second phase, launched in 2020, introduces 427 affordable homes with 1-, 2-, and 3-bedroom multi-tenured apartments, featuring expansive open spaces and world-class amenities designed for modern living.About the ClientSt. James, a proud member of the Berkeley Group, is renowned for pioneering urban regeneration across the UK. Known for transforming industrial areas along London's riverside into thriving residential and commercial spaces, St. James leads this project with their visionary approach. Collaborating with SKONTO PLAN and BOYER, they are reimagining this neighborhood into a vibrant hub of activity and tranquility.Our Innovative SolutionTo align with the client’s vision, initial designs considered stick-on stainless steel elements. However, these panels posed challenges, such as frequent maintenance needs and complex installation processes. Our team developed an alternative solution, ensuring durability, ease of maintenance, and seamless integration into the project’s design.
Sponsored
Ontario Court of Justice - Toronto

Ontario Court of Justice - Toronto

Master Builders Solutions

OverviewSet in the heart of downtown Toronto, the Ontario Court of Justice is the largest courthouse in Ontario and a benchmark for contemporary institutional construction. Completed in 2024, the project brings together 63 courtrooms and 10 conference settlement rooms in a LEED® Gold certified facility that reflects modern civic values—transparency, accessibility, and sustainability.Master Builders Solutions Canada Inc. played a key role in ensuring the structural concrete met the performance demands of this high-profile project.The ChallengeDelivering nearly 48,000 m³ of ready-mixed concrete in a downtown location posed numerous technical challenges. The structural design demanded high compressive strength, consistent workability, and durability to support complex load paths, security zones, and a tall atrium enclosed by a 20-metre glass façade.The project team required concrete solutions that would:Maintain workability over long pumping distances and vertical placements,Ensure strength development for critical structural zones (such as core walls and transfer slabs),Limit thermal cracking during curing in massive pours,Integrate seamlessly with staged slipform and rebar installation schedules.These demands were intensified by the need to meet LEED® Gold sustainability targets, tight construction timelines, and high public visibility.The ResultsMaster Builders Solutions Canada Inc. partnered closely with St Marys CBM to optimize concrete performance across all phases of construction. A suite of high-performance admixtures—including water reducers, retarders, and strength-enhancing additives—was deployed to address the project’s structural and logistical complexities.Key contributions included:Enhanced workability retention for long-distance pumping and complex placements, reducing placement time and labour.Improved early- and long-term strength development, enabling faster formwork cycling and reliable performance in high-load areas.Mitigated thermal buildup in mass pours to control cracking and ensure durability over the structure’s lifecycle.Admixture compatibility with supplementary cementitious materials (SCMs), aligning with the project’s environmental goals.By tailoring admixture solutions to the precise performance needs of each mix design, Master Builders Solutions supported consistent quality and efficiency throughout the build.The Ontario Court of Justice now stands not only as a civic institution but also as a demonstration of what is possible when modern structural design and advanced concrete technology are brought together. The project exemplifies how Master Builders Solutions helps construction teams deliver on performance, sustainability, and long-term value.

Showing 1-13 of 13

Feedback