NBS Source
I'm a manufacturer

"access floor systems"

693 results found

Sort by:

Showing 1-35 of 35

Sponsored
Beautiful 2-Hour Glass Floor Brings Light and Protection to San Francisco’s Union Square Station

Beautiful 2-Hour Glass Floor Brings Light and Protection to San Francisco’s Union Square Station

SAFTI FIRST

SAFTI FIRST® provided a unique, artistic 2-hour fire resistive glass floor to the new Union Square Station in San Francisco. This glass floor acts as a lightwell and designed to improve wayfinding by welcoming commuters into the concourse level while meeting all the fire rated code requirements. Because SAFTI FIRST®’s products are proudly USA-made, it met the Buy America requirements of the project as well.
Sponsored
Fire Resistive Glass Floors Make a Dramatic Statement in Nashville’s Historic Neighborhood

Fire Resistive Glass Floors Make a Dramatic Statement in Nashville’s Historic Neighborhood

SAFTI FIRST

SAFTI FIRST® became aware of the new 21c Museum Hotel project when the design team called looking for an economical option for a unique fire rated application for a boutique hotel in Nashville’s historical Printers Alley neighborhood. The design featured a glass floor on the 2nd level that would also act as a light well. In order to comply with fire rated code requirements, the transparent floor needed to meet a 1-hour fire resistive rating.
Sponsored
Lofts du Village Mapeheat Installation – Chelsea, QC, Canada

Lofts du Village Mapeheat Installation – Chelsea, QC, Canada

Mapei Inc.

When the people of Canada’s capital region seek relief from city life, they often retreat to the serene, natural beauty found in Quebec’s Gatineau hills. Here, where temperatures can drop to -38°F (-39°C) and snow falls seven months out of the year, heated flooring is a practical luxury. To help recreate a Scandinavian-style getaway for the Groupe Nordik Lofts du Village project, specifiers chose one of MAPEI’s Mapeheat floor-heating systems.
Sponsored
Fire Rated Glazing Helps Achieve Unobstructed, Floor-to-Ceiling Views in 2-Hour Atrium Wall

Fire Rated Glazing Helps Achieve Unobstructed, Floor-to-Ceiling Views in 2-Hour Atrium Wall

SAFTI FIRST

There is a growing trend in office space design that favors increased opportunities for connectivity and collaboration among its occupants. In buildings with multiple floors, this can be a challenge as the vertical separation between floors makes face-to-face encounters less likely to happen. One way to get around this is by incorporating an atrium. See how fire rated glass helped the designers meet the fire rated requirements for this atrium while providing clear, unobstructed views.
Sponsored
Molson Brewery

Molson Brewery

ACO Canada

Located at the foot of the Cascade mountain range in Chilliwack, the brand-new Molson – Coors was inaugurated in 2019. It has the capacity to produce 300 million litres of beer a year. The brewery is equipped with advanced technologies for operational efficiency, and it is considered Molson’s most modern facility.The plant was designed with optimised equipment layouts that help reduce beer loss and wastage. Hygienic industrial drainage is a major component of the design and ACO drainage was selected for its proven performance.Benefits of ACO StainlessEasy to clean hygienic designStainless steel is highly resistant to corrosionHigh hydraulic efficiency for fast removal of surface waterACO’s experience in drainage for food processing environments
Sponsored
Skyline Lodge - Highlands, NC, USA.

Skyline Lodge - Highlands, NC, USA.

Mapei Inc.

MAPEI’s Mapeheat™ radiant floor-heating system adds an extra touch of luxury to a five-star lodge.
Sponsored
San Diego Highrise Uses Fire Rated Glass on South Facade

San Diego Highrise Uses Fire Rated Glass on South Facade

SAFTI FIRST

Because the Sapphire Towers' south facing elevation was in close proximity to the adjacent property, code regulations required the south façade to either be solid, which was contrary to the design, or to have openings with a minimum fire protection of 45 minutes. SAFTI FIRST® engineered a system that met the uniform design demands and performance requirements for the windows and balconies in all 32 floors in the south-facing elevation.
Sponsored
Chicago Starbucks Reserve Turns Stair-Climbing Into Unforgettable Experience Using Fire Rated Glass

Chicago Starbucks Reserve Turns Stair-Climbing Into Unforgettable Experience Using Fire Rated Glass

SAFTI FIRST

The Starbucks Reserve Roastery in Chicago features an incredible, 4-story mural by local artist Eulojio Ortega. The mural, brilliant for conveying the story as visitors go from floor to floor, is interestingly located in an exit stairwell. Traditionally, stairwells are enclosed in opaque walls, leaving them dark, isolated, and rarely utilized unless in an emergency. To allow the mural to be visible through multiple floors, encourage stair usage and meet fire rated code requirements, the architects redesigned the 2- hour stairwell using transparent, floor-to-ceiling butt-glazed glass walls with the largest tested and listed fire resistive glass panels available.
Sponsored
Caspian Waterfront

Caspian Waterfront

FutureGlass

Scope of WorkProcess, deliver and install façade cone glazing for the dome.Build Up12mm FT HST Sunguard Neutral 50 + 16mm Black Warm Edge spacer + 88.4 Clear HSProject DetailsCaspian Waterfront is the reimagined building of the original government congress centre. In 2016, local developer Pasha Construction started transforming the building into a 120,000 sq. m. retail entertainment and leisure complex. Located on the shore of the Caspian Sea, the structure opens onto the waterfront on three sides.The retail centre’s unique structure posed a challenge. The building complex has geometric shapes similar to the Sydney Opera House, with shell roofs that reflect the surrounding water. The central flame tower has an eight-angled glass façade inspired by the country’s emblem, the eight-pointed star. Since the building would resemble a place of pride, we had to ensure that our panels surpassed every quality level. Due to the unique triangular shape of the glass panels extra care had to be taken during production, delivery and installation to prevent injury, breakage and damage.At Future Glass, we always prioritise quality. Our state-of-the-art processing facility enabled us to deliver the panels on time with minimal on-site rejections. Today, Caspian Waterfront has become a national symbol of Azerbaijan.
Sponsored
Fire Rated Glass Brings Whimsical and Reliable Protection at Children’s Hospital

Fire Rated Glass Brings Whimsical and Reliable Protection at Children’s Hospital

SAFTI FIRST

One of the highlights of the SUNY University Hospital’s vertical expansion is the addition of the Golisano Children’s Hospital on the top two floors of the six-story addition. Since the project added new floors, stairwell enclosures were also added. Traditionally, stairwells are relegated to the back of the building, and are usually closed-off, dimly lit and seldom used. Today, stairwells are becoming a prominent design feature and their use is encouraged more and more for the health benefits that stair climbing provides.
Sponsored
Shangri-La Hotel & Condos - Toronto, Ontario

Shangri-La Hotel & Condos - Toronto, Ontario

Mapei Inc.

MAPEI’s self-leveling underlayment, Novoplan 2, was used to prepare the floors of the Shangri-La Hotel condos to receive stunning oak planks from Italy. The wood was installed using Ultrabond ECO 995 adhesive with built-in sound reduction and moisture barrier characteristics.
Sponsored
One World Trade Center

One World Trade Center

Master Builders Solutions

Soaring to a height of 1,776 feet (540-meters), the 2.6-million-squarefoot (242,000-square-meter) skyscraper known as One World Trade Center in the lower Manhattan district of New York City is a marvel of design and engineering. Construction of the building, previously called the Freedom Tower, began in April 2006 and at the time was the tallest building in the United States.The Challenge Sustainable design was a central theme to One World Trade Center’s development, with the Port Authority of New York/ New Jersey imposing a strict requirement for the replacement of Portland cement with recycled materials. In addition, extremely high performance concrete was necessary to meet the compressive strength requirements of the steel and concrete structural columns, which ranged from 14,000 psi (97 MPa) to 12,000 psi (83 MPa) for the lower 40 floors and 10,000 psi (69 MPa) to 8,600 psi (59 MPa) for the upper floors. The 12,000 psi (83 MPa) concrete phase of the project was the most challenging, with the engineers, owners and contractors all having their own requirements and specifications.The ResultsThrough Master Builders Solutions‘ Green Sense Concrete mixture optimization service, Eastern Concrete Materials was able to proportion an EF Technology® concrete mixture with 71% cement replacement. The mixture replaced Portland cement with the recycled materials, non-cementitious fillers and specialized admixtures to exceed all the performance targets specified by the One World Trade Center project stakeholders. This EF Technology mixture was used for the 38,000 yd3 (29,000 m3) of concrete needed for the columns through the first 40 floors. To quantify the environmental impact of sustainable concrete for the structure, an Eco-Efficiency Analysis was conducted, using a methodology validated by NSF International, to compare the specialized EF Technology mixture to a reference mixture. Some practical equivalents for these savings are: Water savings equal to 1,177,329 half-liter bottles of waterReduced carbon footprint equal to 1,835,494 gallons of gasolineFossil fuel savings equal to 29,872 barrels of oil
Sponsored
Boston Building Protects Property Line with Fire Resistive Curtain Wall

Boston Building Protects Property Line with Fire Resistive Curtain Wall

SAFTI FIRST

The west-facing elevation of The Kensington in Boston, MA, was in close proximity to the property line, prompting the building official to require part of the curtain wall had to meet ASTM E-119/NFPA 251/UL263 for 60 minutes. SAFTI FIRST® supplied SuperLite® II-XL 60 insulated with Solarban 70XL in GPX® Curtain Wall Framing in a continuous span from the seventh to the tenth floors.
Sponsored
CSSBI SSF 42-15:
Fastening Prepainted Sheet Steel Roofing and Siding

CSSBI SSF 42-15: Fastening Prepainted Sheet Steel Roofing and Siding

Trimet Building Products

Introduction Sheet steel roofing and siding (cladding) is available in a wide variety of profiles, colours and paint systems. The modern prepainted systems used on Canadian-made products will provide decades of beautiful performance before there are any visible signs of deterioration of the paint surface. However, an important component of the cladding system is the fastener used to attach it to the structure. This fastener is not simply a screw; it is part of the roof or wall assembly and should be expected to provide the same long-term performance. This performance is not simply the capacity to safely hold the cladding in place, but also to match the colour and durability of the paint system. The selection of the correct screw for the job is the first step in the creation of a cladding system that will provide long-term performance. The next step is the installation. Installing screws in sheet steel cladding is commonplace and can be done very efficiently. The tool manufacturers have developed a wide range of options for installing fasteners into any type of substrate. Selecting the most appropriate tool will help the installation process.
Sponsored
Care and Maintenance of Prefinished Sheet Steel
Building Products

Care and Maintenance of Prefinished Sheet Steel Building Products

Trimet Building Products

Introduction Prefinished sheet steel building products, such as wall and roof cladding, liner sheet, flashing, and associated items, have experienced an enviable growth record during the past twenty years or so. Coil coated prefinished sheet steel in a variety of colours and paint systems has greatly enhanced the appearance of thousands of industrial, commercial, institutional, recreational, residential and farm buildings, providing an economical, durable and attractive alternative to traditional materials. As with all materials, a little care and maintenance pays off handsomely in terms of longevity and repair costs. The recommendations which follow have been learned at first hand and represent the collective industry experience with thin-film paint systems applied to metallic coated sheet steel by the coil coating process. In this publication the term “thin-film paint system” refers to a modified silicone polyester or a fluorocarbon type having a coating thickness about 25µm. When the guidelines listed below have been observed, thin-film paint systems have been used successfully for all types of environments other than severe industrial atmospheres which require special consideration. The guidelines are not intended for barrier coatings, laminates, and new formulations which have different characteristics than the thin-film paint systems on which these guidelines are predicated. 
Sponsored
GPX® Framing with Sunshade Connectors at Doolittle BART Station

GPX® Framing with Sunshade Connectors at Doolittle BART Station

SAFTI FIRST

For BART's Doolittle Maintenance Facility at the new Oakland Airport connector, SAFTI FIRST® provided 60 minute, fire resistive wall openings in the exterior using SuperLite® II-XL 60 insulated with low-e glazing in GPX® Framing with a clear anodized finish. SAFTI FIRST® engineered a connection that allows the structural elements of the GPX® Architectural Series Framing System to support an integral sunshade system, instead of being hung in front of it. The Doolittle Bart Station is one of the first installations of the GPX® Architectural Series System with sunshade connections, which also include SLCC New Instruction and Administrative Building in Salt Lake City, UT.
Sponsored
Cost Considerations for
Prepainted Sheet Steel Cladding

Cost Considerations for Prepainted Sheet Steel Cladding

Trimet Building Products

This Fact Sheet has been written to describe some of the factors that affect the cost of prepainted sheet steel cladding products. The most significant factors are: colour, paint system, order quantity, Fabricator's inventory and profile selection. Recognition of the impact of these factors can help you select a prepainted sheet steel cladding system to fit the aesthetic and durability requirements of your project, and still stay within a budget. 
Sponsored
Fire Resistive Curtain Wall at NYC Midtown Community Court

Fire Resistive Curtain Wall at NYC Midtown Community Court

SAFTI FIRST

The 1890s-era Midtown Community Court in New York City—a New York Historic Landmark—is currently undergoing a five year, $18 million renovation that includes a 9,650-square-foot addition for a new elevator, lobby and stairwell featuring fire resistive glass and curtain wall. The system consists of SAFTI FIRST®’s SuperLite® II-XL 120 IGU in GPX® Curtain Wall System.
Sponsored
Fire Rated Glass Helps SFPUC Building Achieve LEED Platinum

Fire Rated Glass Helps SFPUC Building Achieve LEED Platinum

SAFTI FIRST

The new San Francisco Public Utilities Commission Headquarters combines maximum daylighting and fire safety with a multi-story, fire rated glass stairwell from SAFTI FIRST. Dubbed as the "greenest building in North America," this Class A LEED Platinum office building features a transparent, 2-hour fire rated stairwell, situated prominently near the main entrance. SAFTI FIRST supplied SuperLite II-XL 120 in GPX Architectural Series Wall Framing and SuperLite II-XL 90 in GPX Builders Series Temperature Rise Door starting from the lobby all the way to the topmost floor.
Sponsored
Repainting Factory
Prefinished Metal Panels

Repainting Factory Prefinished Metal Panels

Trimet Building Products

Introduction Prefinished sheet steel is used on many building products from wall cladding, to architectural roofing to interior panels. Prefinished sheet steel has been used in Canada for over 30 years and there may be sites were the paint surface is in need of repainting. This bulletin is intended to give some guidance on repainting prefinished panels. Due to the diversity of factory applied prefinished systems, and the diversity of potential field applied repaint systems, it is impossible to offer one comprehensive repaint procedure for all possible situations. However, it is possible to offer a set of guidelines to be considered in every potential situation.
Sponsored
CSSBI SSF 21-06:
Low Sloped Steel Roofing - The Winners in Life Cycle Cost Analysis

CSSBI SSF 21-06: Low Sloped Steel Roofing - The Winners in Life Cycle Cost Analysis

Trimet Building Products

An independent assessment of the life cycle cost for various low slope roof systems revealed that steel roofing had the longest life span, no leaks due to material failures, and the lowest overall maintenance cost.
Sponsored
CSSBI S8-2018:
Quality and Performance Specification for Prefinished Sheet Steel Used for Building Products

CSSBI S8-2018: Quality and Performance Specification for Prefinished Sheet Steel Used for Building Products

Trimet Building Products

1. SCOPE 1.1 The following specifications shall apply to hot-dipped metallic-coated sheet steel prefinished with colours of proven durability and suitable for exterior exposure as delivered from the coil coater. Proven paint systems for building products have been designed for vertical applications whose surfaces are no more than 30° to the vertical and non-vertical applications whose surfaces ranging from 5° up to 60° to the horizontal. It is not recommended for aggressive atmospheric exposure. 1.2 The prefinish system shall consist of a primer and topcoat continuously applied and cured within the paint manufacturer’s specifications on cleaned, pretreated, metallic-coated substrate. The pretreatment specified shall be zinc phosphate for galvanized steel and metal oxide pretreatment for aluminum-zinc alloy-coated steel, applied in accordance with the pretreatment manufacturer’s specifications.
Sponsored
Revolutionary Electro Polarization Performance in Campus Germany, Dubai Expo 2020

Revolutionary Electro Polarization Performance in Campus Germany, Dubai Expo 2020

FutureGlass

1.  About the ProjectOne of the most prestigious national pavilions at Expo 2020 Dubai, The German Pavilion, represented the Federal Republic of Germany's commitment to innovation and sustainability. Designed by renowned Berlin-based LAVA Architects, this 4,600 m² architectural showcase demonstrated Germany's leadership in environmental technology and intelligent building solutions through its unique "forest of steel poles" design.Project Specifications:Location: World Expo 2020 Dubai, UAEBuilding Owner: German Federal Ministry for Economic Affairs and EnergyArchitect: LAVA Architects, BerlinFacade Contractor: Future Glazing LLC, UAEMain Contractor: ARGE Deutscher Pavilion EXPO 2020 Dubai GbRInstallation Date: June 2021Exhibition Period: 6 months with over 3 million international visitorsTotal Pavilion Area: 4,600 m²FutureX Eclipse™ Intelligent Glazing Area: 113 m²2. The ChallengeFuture Glass was tasked with creating intelligent facade elements that would perform flawlessly in Dubai's extreme desert climate while maintaining perfect environmental control for millions of international visitors. The architects required a building envelope that could respond instantly to rapidly changing conditions including sandstorms, intense solar radiation, and temperatures exceeding 45°C.The project demanded breakthrough glazing technology that could eliminate mechanical shading systems while providing instant environmental adaptation. The design called for individual glass panels to operate independently whilst maintaining overall design coherence across the pavilion's complex geometry. Additionally, the system needed to be maintenance-free, withstand sandstorm conditions, and deliver consistent performance throughout the six-month exhibition period without any mechanical intervention.Given the prestigious nature of this international exhibition space, any failure or performance degradation would have significant reputational impact, making reliability and consistent operation absolutely critical.3. The OutcomeThe FutureX Eclipse™ installation delivered exceptional environmental control, enabling Campus Germany to maintain perfect occupant comfort for international visitors while showcasing German innovation in intelligent building technology. The electropolarization system responded instantly to Dubai's challenging environmental conditions, providing seamless transitions between maximum transparency and sophisticated solar protection in one second or less.The installation demonstrated zero mechanical shading requirements across the entire facade system, with individual 1.5-meter wide rotatable glass elements operating flawlessly throughout the exhibition period. The success of this project established new benchmarks for intelligent glazing performance in extreme climatic conditions and proved that breakthrough electropolarization technology could transform architectural vision into responsive, high-performance building envelopes.The pavilion's environmental control system impressed over 3 million visitors and received international recognition for its innovative integration of intelligent building technology with sophisticated architectural design.4. Products UsedFutureX Eclipse™ Electropolarization Switchable Glass System:Surface Area: 113 m² of intelligent glazing elementsQuantity: 61 individual switching unitsGeometry: Rectangular configurations with rotational capabilityConfiguration: 28 fixed glass panels, 4 standard doors, and 29 intelligent folding door elementsSwitching Speed: ≤1 second response timePerformance: Neutral colour throughout all switching statesTechnology: Eclipse® electropolarization switching layer with controlled electrical field modulationControl System: Individual panel control with building automation integrationEnvironmental Rating: Designed for extreme desert climate operation including sandstorm resistance
Sponsored
A Clear Solution for Harvard’s Klarman Hall

A Clear Solution for Harvard’s Klarman Hall

SAFTI FIRST

This new 120,000 square foot, state-of-the-art convening center features a 1,000-seat auditorium that is large enough to host the entire MBA class. The glass atrium floods the multi-purpose lobby with natural light, as well as provides a visual connection between the interior of the building and the outdoor environment. To maximize transparency, SAFTI FIRST® met with the architects during the design phase to create a large, 2-hour, glass wall that separates the lobby from the auditorium while providing a visual connection between them. Since this 2-hour glass wall also serves as the entrance to the auditorium, deciding on a 90-minute door system was of upmost important. SAFTI FIRST®’s in-house engineering department provided design assistance, system details, engineering calculations and support from the planning phase all the way to the submittal process.
Sponsored
Position Paper on Oil-Canning: Specifying Wide Flat
Panels in Metal Cladding

Position Paper on Oil-Canning: Specifying Wide Flat Panels in Metal Cladding

Trimet Building Products

What is Oil-Canning? Oil-canning is associated with all thin sheet metal products and occurs in the wide flat portions of the cladding profile. It is seen as a series of standing waves, or regular bumps and hollows alternating along the flat length of the panel. This waviness, when viewed under certain conditions, can be undesirable aesthetically and may not meet with the owner’s expectations. The CSSBI wants to help avoid this situation. The cladding manufacturers are aware of the potential for oil-canning in the cladding profiles and can help minimize the effect. It is important for the proper steps to be taken during manufacturing and installation to produce a quality finished product; therefore, specifiers should insist on product from a reliable, experienced cladding manufacturer, like a CSSBI member company. Quality control, however, cannot end on the shop floor. The building project needs the cooperation and knowledge of everyone involved to enhance the quality of the finished job. Oil-canning is a phenomenon that can be managed if the following factors are considered at the beginning of a project.
Sponsored
Real Steel Cost Advantages – Consider. Choose. Challenge.

Real Steel Cost Advantages – Consider. Choose. Challenge.

Trimet Building Products

Start at the foundation where the loads imposed by a steel frame are up to 50% less than those of a concrete alternative. There is evidence in the field and through third-party case studies and comparative cost studies that steel building systems offer significant cost benefits over competitive building materials when the total cost of construction is considered.
Sponsored
THE BENEFITS OF STEEL VS. WOOD FOR MID-RISE BUILDING CONSTRUCTION

THE BENEFITS OF STEEL VS. WOOD FOR MID-RISE BUILDING CONSTRUCTION

Trimet Building Products

Sustainability, durability, fire resistance, structural performance and cost-effectiveness are some of the strongest reasons for using structural steel or cold-formed steel framing in mid-rise building construction. As a dependable, noncombustible material, steel-framed structures provide a wise investment for builders and the occupants who live and work in them. Steel structures provide long-term, consistent performance. • Steel framing will not rot, warp, split, crack or creep. • Steel framing is not vulnerable to termites. • Steel framing does not expand or contract with moisture content. • Steel framing is produced in strict accordance with national standards, with no regional variations. Steel is a noncombustible material and will not contribute to the spread of a fire. • Because steel is noncombustible, it reduces the fire risk to occupants, firefighters and property/business owners. Steel framing improves design efficiency, saves time, and reduces costs. • Steel framing provides a significantly greater strength-to-weight ratio than wood. • Steel framing allows for larger bays and wider frame spacing than wood construction. • Increased flexibility in bay spacing and framing layout maximizes usable floor space for owners and tenants. • Steel is typically fabricated off-site, reducing on-site labor, cycle time and construction waste. • Shorter construction time results in earlier occupancies and lower financing costs. Steel structures perform well during earthquakes and other extreme events. • Steel is a resilient material, with reserve strength and ductility that result in significant advantages in natural disasters such as hurricanes and earth- quakes, and in other extreme events like fire and blast. • Steel construction is engineered to provide a reliable, consistent load path. • Steel construction employs quality control and quality assurance procedures to ensure that the project requirements are met. Steel framing provides environmental benefits and complies with sustainable building standards. • Steel framing results in less scrap and job site waste than lumber. • Structural steel is continually recycled with a current recycling rate of 98 percent, meaning that these steels will still be in use hundreds of years from now, lessening impacts on future generations. • Steel, when recycled, loses none of its inherent properties and can be recycled into different products such as cars, bridges, cans, etc. • Steel can be used to comply with the requirements of sustainable design standards such as the International Green Construction Code (IgCC), ASHRAE Standard 189.1 (Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings), and the National Green Building Standard (ICC-700). Steel can also provide credit points for green building rating systems like the USGBC’s LEED (Leadership in Energy and Environmental Design) and the Green Building Initiative’s ANSI/GBI-01 (Green Building Assessment Protocol for Commercial Buildings).  
Sponsored
Utah Business School Features Dramatic Fire Rated Glass Wall

Utah Business School Features Dramatic Fire Rated Glass Wall

SAFTI FIRST

The David Eccles School of Business on the University of Utah campus features a 28- x 18-ft 2 hour interior glass wall with a 90 minute full-vision door in an exit enclosure/stairwell. The architects selected fire rated glass to meet fire rating requirements while providing maximum visibility and natural daylighting in the space. The project’s specifications also required the fire rated glass to have the same optical clarity as the adjacent non-rated glass systems.
Sponsored
Fire Rated Glazing Adds Visual Appeal to Parking Garages

Fire Rated Glazing Adds Visual Appeal to Parking Garages

SAFTI FIRST

Codes required fire wall separations between parking garages and businesses, markets, homes and other uses. Architects can replace entire walls with glass to open up buildings like never before. For example, SuperLite® II-XL in GPX® Architectural Series Framing by SAFTI FIRST® is a USA-made fire resistive transparent wall system that blocks radiant heat and meets the same stringent ASTM E-119/ UL 263/ NFPA 251 code requirements that any opaque fire rated wall must meet.
Sponsored
Fire Rated Glass Contributes to Salt Lake City Public Safety Building’s Sustainable and Resilient Design Goals

Fire Rated Glass Contributes to Salt Lake City Public Safety Building’s Sustainable and Resilient Design Goals

SAFTI FIRST

The Salt Lake City Public Safety Building in Utah is the first U.S. Public Safety Building to achieve both a net-zero rating and LEED Platinum status and designed to survive a 7.5 magnitude earthquake and remain fully functional afterwards. This ensures that the city’s emergency operations center can survive and help the city recover in the event of an earthquake or a similar disaster. Fire rated glass contributes to achieving sustainable design goals by maximizing daylight penetration deep within a building and shared artificial lighting between spaces. It also ensures that occupants can exit the building safely in the event of an earthquake, which can damage sprinkler systems and render them ineffective.
Sponsored
LEEDv4 and STEEL

LEEDv4 and STEEL

Trimet Building Products

Designers and builders have long recognized steel for its strength, durability and functionality. An important aspect of steel’s story is its high recycled content and end-of-life recovery rate. Both attributes are recognized by the U.S. Green Building Council’s (USGBC) green building rating system, Leadership in Energy and Environmental Design (LEED), but steel construction products can contribute to many other LEED credits as well, either directly or indirectly. USGBC’s latest version, LEEDv4, includes a completely revised and expanded Materials and Resources section, with new credits in the areas of life-cycle assessment (LCA), environmental product declarations (EPDs), and overall product transparency
Sponsored
Prepainted Sheet Steel: Taking on Canada’s Climate
for Decades

Prepainted Sheet Steel: Taking on Canada’s Climate for Decades

Trimet Building Products

Four Key Components Constitute Prefinished Sheet Steel Prefinished sheet steel for construction consists of four major components: the sheet steel itself, a metallic (zinc or aluminum-zinc alloy) coating, chemical pre-treatment and primer, and a top coat. Each performs an important role in providing designers with a high quality, aesthetic, cost competitive and corrosion-resistant material. The backbone of the system is sheet steel, an ideal material for covering large surface areas because of its economy and high strength-toweight ratio. Protection against the demanding Canadian environment is provided by the metallic coating, one of the most effective methods of protecting bare steel from corrosion. Both zinc and aluminum-zinc alloy provide a tough, non-porous coating
Sponsored
Ontario Court of Justice - Toronto

Ontario Court of Justice - Toronto

Master Builders Solutions

OverviewSet in the heart of downtown Toronto, the Ontario Court of Justice is the largest courthouse in Ontario and a benchmark for contemporary institutional construction. Completed in 2024, the project brings together 63 courtrooms and 10 conference settlement rooms in a LEED® Gold certified facility that reflects modern civic values—transparency, accessibility, and sustainability.Master Builders Solutions Canada Inc. played a key role in ensuring the structural concrete met the performance demands of this high-profile project.The ChallengeDelivering nearly 48,000 m³ of ready-mixed concrete in a downtown location posed numerous technical challenges. The structural design demanded high compressive strength, consistent workability, and durability to support complex load paths, security zones, and a tall atrium enclosed by a 20-metre glass façade.The project team required concrete solutions that would:Maintain workability over long pumping distances and vertical placements,Ensure strength development for critical structural zones (such as core walls and transfer slabs),Limit thermal cracking during curing in massive pours,Integrate seamlessly with staged slipform and rebar installation schedules.These demands were intensified by the need to meet LEED® Gold sustainability targets, tight construction timelines, and high public visibility.The ResultsMaster Builders Solutions Canada Inc. partnered closely with St Marys CBM to optimize concrete performance across all phases of construction. A suite of high-performance admixtures—including water reducers, retarders, and strength-enhancing additives—was deployed to address the project’s structural and logistical complexities.Key contributions included:Enhanced workability retention for long-distance pumping and complex placements, reducing placement time and labour.Improved early- and long-term strength development, enabling faster formwork cycling and reliable performance in high-load areas.Mitigated thermal buildup in mass pours to control cracking and ensure durability over the structure’s lifecycle.Admixture compatibility with supplementary cementitious materials (SCMs), aligning with the project’s environmental goals.By tailoring admixture solutions to the precise performance needs of each mix design, Master Builders Solutions supported consistent quality and efficiency throughout the build.The Ontario Court of Justice now stands not only as a civic institution but also as a demonstration of what is possible when modern structural design and advanced concrete technology are brought together. The project exemplifies how Master Builders Solutions helps construction teams deliver on performance, sustainability, and long-term value.
Sponsored
LEEDing with STEEL 2009

LEEDing with STEEL 2009

Trimet Building Products

Buildings have a profound impact on our natural environment, economy, health and productivity. In North America, the built environment accounts for approximately one-third of all greenhouse gas emissions, energy, water and material consumption and generates similiar proportions of pollution. Indoor air quality is regarded as one of the top environmental health risks today, affecting the well-being, productivity and performance of many people. As concerns increase about sustainability in building design and operation, there is a need to develop a framework for assessing and quantifying buildings so that questions such as, “What is sustainable design?” and “How green is this project?” can be addressed. In response to this, the Leadership in Energy and Environmental Design (LEED) green building rating system was developed to provide such a framework for North America. This document explores how the use of steel structures and components can contribute to achieving a LEED certificate for a building.
Sponsored
COOL METAL ROOFS ARE ENERGY-EFFICIENT AND COST-EFFECTIVE

COOL METAL ROOFS ARE ENERGY-EFFICIENT AND COST-EFFECTIVE

Trimet Building Products

Buildings consume one-third of all energy and two-thirds of all electricity generated. Cool metal roofs can help reduce energy consumption by lowering cooling loads with their wide array of finishes, designs and colors.Cool metal roofs are energy-efficient. • The roof can have the greatest impact on the energy use of a building. On a typical summer afternoon, a light-colored, more reflective roof that reflects 80 percent of sunlight will stay about 310C (550F) cooler than a darker roof that reflects only 20 percent of sunlight, as reported by the Heat Island Group of the Lawrence Berkeley National Laboratory. • Cool metal roofs are an excellent option for commercial retrofit applications because they can be efficiently installed with above-sheathing ventilation, allowing heat to dissipate through the ridge vent in hot weather while acting as an insulating layer when it is cold. Metal roofs can result in as much as a 30 percent reduction in heat gain through the vented roof. • Metal roofs provide the optimal foundation for photovoltaic installations since the roof can be expected to last longer than the PV system it supports. • Wall and roof solar heat recovery systems can be integrated with steel cladding and used to provide air, water or process heating needs. • Cool metal roofing is available unpainted, with thermosetting coil-applied paint finishes, or with granular-coated surfaces. This family of roofing can achieve solar reflectance of over 70 percent, meeting the EPA Energy Star Roof Products Program performance criteria. • Emittance as high as 90 percent can be achieved for painted and granular-coated metal roofing. • Painted metal roofs retain 95 percent of their initial reflectance and emittance over time. They resist the growth of organic matter and shed dirt more readily than other materials. • Cool metal roofing can help to mitigate the Urban Heat Island Effect because of its high reflectance, which can reduce ambient air temperatures. Cool metal roofs are cost-effective. • Metal roofing has low life-cycle costs, making it the choice of many school, government, commercial, industrial and institutional building owners. • Due to its light weight per unit area, structural savings can be realized in a building when compared with heavier non-metal roofing alternatives. • For re-roofing projects, metal roofing can often be applied over the original roof, saving removal and disposal costs. • Metal roofing is fully recyclable when ultimately removed as part of building renovation or demolition, allowing it to credibly claim both recycled content and 100 percent recyclability by recognized definitions. The product’s recyclability also provides significant savings on construction removal and disposal costs.

Showing 1-35 of 35

Feedback