NBS Source
I'm a manufacturer

"egger building"

579 results found

Sort by:

Showing 73-81 of 81

Sponsored
Fire Rated Glazing Adds Visual Appeal to Parking Garages

Fire Rated Glazing Adds Visual Appeal to Parking Garages

SAFTI FIRST

Codes required fire wall separations between parking garages and businesses, markets, homes and other uses. Architects can replace entire walls with glass to open up buildings like never before. For example, SuperLite® II-XL in GPX® Architectural Series Framing by SAFTI FIRST® is a USA-made fire resistive transparent wall system that blocks radiant heat and meets the same stringent ASTM E-119/ UL 263/ NFPA 251 code requirements that any opaque fire rated wall must meet.
Sponsored
Fire Rated Glass Provides Privacy, Daylight at Ridgewood High

Fire Rated Glass Provides Privacy, Daylight at Ridgewood High

SAFTI FIRST

For a recent renovation of a stairwell and exit corridors at Ridgewood High School in Illinois, the design team specified SuperLite® II-XL 60 in GPX® Architectural Series Framing for its optical clarity, storefront-like appearance, and high STC ratings. In order to meet the code requirements and maximize the daylight penetrating into the building, the architects decided to use fire rated glass in the one-hour exit corridor. Because the glazing exceeds 25% of the wall area, fire resistive glass and framing assemblies rated equal to the wall had to be used.
Sponsored
Passivhaus CPD Training Facility

Passivhaus CPD Training Facility

Intelligent Membranes Canada

We built the world first Passivhaus CPD training facility / pub, this is the worlds most airtight pub at 0.07ach at 50 pa. This is a twin wall timber frame, it’s 450mm wide insulation Huntsman which is made of thousands of recycled plastic bottles. Huntsman also recycled 1 billion plastic bottles from the sea last year. We have a 7.2 KW system solar panels system that powers the building, it’s got MVHR Nilan. On the external façade we applied Passive Purple External which is airtight up to 0.03ach.
Sponsored
Tall Order at the Exploratorium

Tall Order at the Exploratorium

SAFTI FIRST

The newly opened Exploratorium has brought energy and excitement to the city's bustling waterfront. EHDD transformed the historic Pier 15, built in 1915, to a 330,000 square foot indoor and outdoor campus, being touted as the largest net-zero building in the city and potentially the largest net-zero museum in the world. SAFTI FIRST® supplied a total of 19 pairs of 45-minute steel doors 11 pairs on north side and 8 pairs on the south side using SuperLite® II-XL 45 IGU in GPX® Builders Series Fire Protective.
Sponsored
Medical Center Maximizes Natural Daylight with Fire Rated Glass

Medical Center Maximizes Natural Daylight with Fire Rated Glass

SAFTI FIRST

Central to the new UC Davis Medical Center Surgery and Emergency Services Pavilion's design was a large skylight that allows natural light to vertically flow into the atrium area and other light wells throughout the building. However, they also wanted to let light flow horizontally into the adjacent hallways, rooms, etc. Because the walls in the atrium and light wells have to meet a 2-hour rating, Stantec Architects approached SAFTI FIRST® for a solution. Large portions of the 2 hour atrium and light well walls were made “transparent” with the use of SuperLite® II-XL 120 in GPX® Framing.
Sponsored
The Miracle of 520 West 20th Street

The Miracle of 520 West 20th Street

SAFTI FIRST

The architects at Morris Adjmi wanted large, 11-ft. tall glass walls to highlight the breathtaking views for the reimagined Warehouse in New York City’s growing architectural wonderland of Chelsea. However, the building was on a lot line, mandating 2 hour fire walls. SAFTI FIRST® made this dream a reality by supplying the largest tested and listed 2 hour fire resistive glazing available today. The inclusion of low-iron glass in the fire-resistive glazing units ensured superior clarity and aesthetic continuity with the adjacent non-rated windows. The fire resistive units incorporated high performance glazing and were filled with argon for energy efficiency and occupant comfort.
Sponsored
Casa Loma, Toronto

Casa Loma, Toronto

ACO Canada

Casa Loma is a Gothic Revival castle-style mansion and garden in midtown Toronto, Ontario, Canada, that is now a historic house museum and landmark. It was constructed from 1911 to 1914 as a residence for financier Sir Henry Pellatt.Part of the renovations carried out was improving the water management on the exterior terrace located at the back of the building. The requirement was for the stormwater to be collected and disposed of efficiently without creating an unsightly 3D grading of the terrace surface. Linear drainage was the natural selection.ACO KlassikDrain KS100 was chosen for its robustness and ability to withstand Canadian weather conditions. The perforated stainless steel grate will resist corrosion and it is AODA and heelproof compliant, important requirements for this public venue.
Sponsored
GPX® Framing with Sunshade Connectors at Doolittle BART Station

GPX® Framing with Sunshade Connectors at Doolittle BART Station

SAFTI FIRST

For BART's Doolittle Maintenance Facility at the new Oakland Airport connector, SAFTI FIRST® provided 60 minute, fire resistive wall openings in the exterior using SuperLite® II-XL 60 insulated with low-e glazing in GPX® Framing with a clear anodized finish. SAFTI FIRST® engineered a connection that allows the structural elements of the GPX® Architectural Series Framing System to support an integral sunshade system, instead of being hung in front of it. The Doolittle Bart Station is one of the first installations of the GPX® Architectural Series System with sunshade connections, which also include SLCC New Instruction and Administrative Building in Salt Lake City, UT.
Sponsored
A Clear Solution for Harvard’s Klarman Hall

A Clear Solution for Harvard’s Klarman Hall

SAFTI FIRST

This new 120,000 square foot, state-of-the-art convening center features a 1,000-seat auditorium that is large enough to host the entire MBA class. The glass atrium floods the multi-purpose lobby with natural light, as well as provides a visual connection between the interior of the building and the outdoor environment. To maximize transparency, SAFTI FIRST® met with the architects during the design phase to create a large, 2-hour, glass wall that separates the lobby from the auditorium while providing a visual connection between them. Since this 2-hour glass wall also serves as the entrance to the auditorium, deciding on a 90-minute door system was of upmost important. SAFTI FIRST®’s in-house engineering department provided design assistance, system details, engineering calculations and support from the planning phase all the way to the submittal process.

Showing 73-81 of 81

Feedback