NBS Source
I'm a manufacturer

"egger building"

279 results found

Sort by:

Showing 73-74 of 74

Sponsored
GPX® Framing with Sunshade Connectors at Doolittle BART Station

GPX® Framing with Sunshade Connectors at Doolittle BART Station

SAFTI FIRST

For BART's Doolittle Maintenance Facility at the new Oakland Airport connector, SAFTI FIRST® provided 60 minute, fire resistive wall openings in the exterior using SuperLite® II-XL 60 insulated with low-e glazing in GPX® Framing with a clear anodized finish. SAFTI FIRST® engineered a connection that allows the structural elements of the GPX® Architectural Series Framing System to support an integral sunshade system, instead of being hung in front of it. The Doolittle Bart Station is one of the first installations of the GPX® Architectural Series System with sunshade connections, which also include SLCC New Instruction and Administrative Building in Salt Lake City, UT.
Sponsored
A Clear Solution for Harvard’s Klarman Hall

A Clear Solution for Harvard’s Klarman Hall

SAFTI FIRST

This new 120,000 square foot, state-of-the-art convening center features a 1,000-seat auditorium that is large enough to host the entire MBA class. The glass atrium floods the multi-purpose lobby with natural light, as well as provides a visual connection between the interior of the building and the outdoor environment. To maximize transparency, SAFTI FIRST® met with the architects during the design phase to create a large, 2-hour, glass wall that separates the lobby from the auditorium while providing a visual connection between them. Since this 2-hour glass wall also serves as the entrance to the auditorium, deciding on a 90-minute door system was of upmost important. SAFTI FIRST®’s in-house engineering department provided design assistance, system details, engineering calculations and support from the planning phase all the way to the submittal process.

Showing 73-74 of 74

Feedback