NBS Source
I'm a manufacturer

"green wall"

408 results found

Sort by:

Showing 37-42 of 42

Sponsored
CSSBI SSF 20-14:
Recycled Content of Steel Building Products

CSSBI SSF 20-14: Recycled Content of Steel Building Products

Trimet Building Products

The construction industry is a vital part of the growth and success of a country. It is responsible for building the physical infrastructure that provides transportation and facilities for citizens, businesses, industries and institutions. Construction has a major influence on the economic wealth, societal well¬being and sustainability of the built environment. The Canadian construction industry employs more than 1.2 million people. In 2010 it accounted for 6% of Canada’s gross domestic product (GDP), with a total value of 73.8 billion dollars. From 2000 to 2010, the GDP from construction increased 42.7% whereas GDP for all industries increased 20.2%.(1) Construction also has a profound impact on our natural environment. In North America, the built environment accounts for approximately one third of all the greenhouse gas (GHG) emissions, as well as energy, water and materials consumption. Given the increased awareness of “green” construction, there is growing interest in using steel because of the major recycled content and recyclability attributes it provides to architects, engineers and specifiers in the construction industry. The steel industry, through the Canadian Sheet Steel Building Institute is committed to providing steel solutions that promote the use of sustainable materials in construction applications. This fact sheet provides an overview of the two main methods used to produce steel, and describes the recycled content of the steels used to manufacture building products such as roofing, cladding, decking, structural and non-structural framing and the many other construction products used in the industry. Once iron ore is extracted and refined into steel, its life never ends. This makes steel an ideal material to deploy in sustainable strategies for the construction industry. Today’s steel is produced using two technologies both of which require “old” (recycled scrap) steel to make “new” steel. The combination of these technologies enables Canadian steel mills the flexibility to produce a variety of steel grades for a wide range of product applications
Sponsored
GPX® Framing with Sunshade Connectors at Doolittle BART Station

GPX® Framing with Sunshade Connectors at Doolittle BART Station

SAFTI FIRST

For BART's Doolittle Maintenance Facility at the new Oakland Airport connector, SAFTI FIRST® provided 60 minute, fire resistive wall openings in the exterior using SuperLite® II-XL 60 insulated with low-e glazing in GPX® Framing with a clear anodized finish. SAFTI FIRST® engineered a connection that allows the structural elements of the GPX® Architectural Series Framing System to support an integral sunshade system, instead of being hung in front of it. The Doolittle Bart Station is one of the first installations of the GPX® Architectural Series System with sunshade connections, which also include SLCC New Instruction and Administrative Building in Salt Lake City, UT.
Sponsored
One World Trade Center

One World Trade Center

Master Builders Solutions

Soaring to a height of 1,776 feet (540-meters), the 2.6-million-squarefoot (242,000-square-meter) skyscraper known as One World Trade Center in the lower Manhattan district of New York City is a marvel of design and engineering. Construction of the building, previously called the Freedom Tower, began in April 2006 and at the time was the tallest building in the United States.The Challenge Sustainable design was a central theme to One World Trade Center’s development, with the Port Authority of New York/ New Jersey imposing a strict requirement for the replacement of Portland cement with recycled materials. In addition, extremely high performance concrete was necessary to meet the compressive strength requirements of the steel and concrete structural columns, which ranged from 14,000 psi (97 MPa) to 12,000 psi (83 MPa) for the lower 40 floors and 10,000 psi (69 MPa) to 8,600 psi (59 MPa) for the upper floors. The 12,000 psi (83 MPa) concrete phase of the project was the most challenging, with the engineers, owners and contractors all having their own requirements and specifications.The ResultsThrough Master Builders Solutions‘ Green Sense Concrete mixture optimization service, Eastern Concrete Materials was able to proportion an EF Technology® concrete mixture with 71% cement replacement. The mixture replaced Portland cement with the recycled materials, non-cementitious fillers and specialized admixtures to exceed all the performance targets specified by the One World Trade Center project stakeholders. This EF Technology mixture was used for the 38,000 yd3 (29,000 m3) of concrete needed for the columns through the first 40 floors. To quantify the environmental impact of sustainable concrete for the structure, an Eco-Efficiency Analysis was conducted, using a methodology validated by NSF International, to compare the specialized EF Technology mixture to a reference mixture. Some practical equivalents for these savings are: Water savings equal to 1,177,329 half-liter bottles of waterReduced carbon footprint equal to 1,835,494 gallons of gasolineFossil fuel savings equal to 29,872 barrels of oil
Sponsored
CSSBI SSF 42-15:
Fastening Prepainted Sheet Steel Roofing and Siding

CSSBI SSF 42-15: Fastening Prepainted Sheet Steel Roofing and Siding

Trimet Building Products

Introduction Sheet steel roofing and siding (cladding) is available in a wide variety of profiles, colours and paint systems. The modern prepainted systems used on Canadian-made products will provide decades of beautiful performance before there are any visible signs of deterioration of the paint surface. However, an important component of the cladding system is the fastener used to attach it to the structure. This fastener is not simply a screw; it is part of the roof or wall assembly and should be expected to provide the same long-term performance. This performance is not simply the capacity to safely hold the cladding in place, but also to match the colour and durability of the paint system. The selection of the correct screw for the job is the first step in the creation of a cladding system that will provide long-term performance. The next step is the installation. Installing screws in sheet steel cladding is commonplace and can be done very efficiently. The tool manufacturers have developed a wide range of options for installing fasteners into any type of substrate. Selecting the most appropriate tool will help the installation process.
Sponsored
Care and Maintenance of Prefinished Sheet Steel
Building Products

Care and Maintenance of Prefinished Sheet Steel Building Products

Trimet Building Products

Introduction Prefinished sheet steel building products, such as wall and roof cladding, liner sheet, flashing, and associated items, have experienced an enviable growth record during the past twenty years or so. Coil coated prefinished sheet steel in a variety of colours and paint systems has greatly enhanced the appearance of thousands of industrial, commercial, institutional, recreational, residential and farm buildings, providing an economical, durable and attractive alternative to traditional materials. As with all materials, a little care and maintenance pays off handsomely in terms of longevity and repair costs. The recommendations which follow have been learned at first hand and represent the collective industry experience with thin-film paint systems applied to metallic coated sheet steel by the coil coating process. In this publication the term “thin-film paint system” refers to a modified silicone polyester or a fluorocarbon type having a coating thickness about 25µm. When the guidelines listed below have been observed, thin-film paint systems have been used successfully for all types of environments other than severe industrial atmospheres which require special consideration. The guidelines are not intended for barrier coatings, laminates, and new formulations which have different characteristics than the thin-film paint systems on which these guidelines are predicated. 
Sponsored
Ontario Court of Justice - Toronto

Ontario Court of Justice - Toronto

Master Builders Solutions

OverviewSet in the heart of downtown Toronto, the Ontario Court of Justice is the largest courthouse in Ontario and a benchmark for contemporary institutional construction. Completed in 2024, the project brings together 63 courtrooms and 10 conference settlement rooms in a LEED® Gold certified facility that reflects modern civic values—transparency, accessibility, and sustainability.Master Builders Solutions Canada Inc. played a key role in ensuring the structural concrete met the performance demands of this high-profile project.The ChallengeDelivering nearly 48,000 m³ of ready-mixed concrete in a downtown location posed numerous technical challenges. The structural design demanded high compressive strength, consistent workability, and durability to support complex load paths, security zones, and a tall atrium enclosed by a 20-metre glass façade.The project team required concrete solutions that would:Maintain workability over long pumping distances and vertical placements,Ensure strength development for critical structural zones (such as core walls and transfer slabs),Limit thermal cracking during curing in massive pours,Integrate seamlessly with staged slipform and rebar installation schedules.These demands were intensified by the need to meet LEED® Gold sustainability targets, tight construction timelines, and high public visibility.The ResultsMaster Builders Solutions Canada Inc. partnered closely with St Marys CBM to optimize concrete performance across all phases of construction. A suite of high-performance admixtures—including water reducers, retarders, and strength-enhancing additives—was deployed to address the project’s structural and logistical complexities.Key contributions included:Enhanced workability retention for long-distance pumping and complex placements, reducing placement time and labour.Improved early- and long-term strength development, enabling faster formwork cycling and reliable performance in high-load areas.Mitigated thermal buildup in mass pours to control cracking and ensure durability over the structure’s lifecycle.Admixture compatibility with supplementary cementitious materials (SCMs), aligning with the project’s environmental goals.By tailoring admixture solutions to the precise performance needs of each mix design, Master Builders Solutions supported consistent quality and efficiency throughout the build.The Ontario Court of Justice now stands not only as a civic institution but also as a demonstration of what is possible when modern structural design and advanced concrete technology are brought together. The project exemplifies how Master Builders Solutions helps construction teams deliver on performance, sustainability, and long-term value.

Showing 37-42 of 42

Feedback