NBS Source
I'm a manufacturer

"water supply"

351 results found

Sort by:

Showing 37-56 of 56

Sponsored
Doha International Airport, Qatar

Doha International Airport, Qatar

Rondo Building Services Pty Ltd

Rondo have supplied the suspended ceiling support frame for a metal panel ceiling which will be used in the construction of the Doha International Airport project.
Sponsored
Resthaven Nursing Home, SA

Resthaven Nursing Home, SA

Rondo Building Services Pty Ltd

Rondo has worked alongside MG Plasterers – who is a key customer in SA – since the initial planning stages. Rondo supplied this project with Steel Stud and KEY-LOCK Concealed Suspended Ceilings.
Sponsored
Ferrari World, Abu Dhabi

Ferrari World, Abu Dhabi

Rondo Building Services Pty Ltd

Rondo supplied the Drywall Framing System in the construction of Ferrari World in Abu Dhabi, which is the world’s largest indoor theme park ­– including wall heights that ranged from 9 meters and above.
Sponsored
Bank of China

Bank of China

Construction Specialties

Construction Specialties recently supplied the A6370 Acoustic Louvre to the Bank of China Sydney branch, to combat noise pollution for the adjacent Oaks hotel whilst providing essential airflow to the plant machinery behind it.
Sponsored
Millars Landing Steamrail Playground

Millars Landing Steamrail Playground

Adventure+

The Steamrail Adventure Playground at Millars Landing is part of a large residential development in North Baldivis, WA. Created with growing families in mind, the development includes numerous playgrounds, parks and family areas all based around the theme of steam trains, water towers and timber milling. The outdoor play equipment boasts two flying foxes, a 12-metre slide, swing sets, a climb-on steam train structure, picnic facilities, kickabout turf areas, robust timber furniture and railway sleepers. adventure+ took the idea of the landscape architect, which was a simple sketch, and turned it into a practical result. Her idea provided the foundation of the playground design, and the adventure+ team were able to reflect this idea in a way that was economical, standards compliant and required minimal design and installation time. The client’s greatest challenge was finding a company that could accurately make the structure, something adventure+ was able to do.
Sponsored
City Square, WA

City Square, WA

Rondo Building Services Pty Ltd

Rondo supplied Steel Stud and Track, KEY-LOCK Furring Channel and Top Cross Rail, and EXANGLE P50 Shadowline Stopping Angle to complete the base fit out and wall linings on 45 levels of the building.
Sponsored
Salalah International Airport, Oman

Salalah International Airport, Oman

Rondo Building Services Pty Ltd

Rondo has supplied our Drywall Framing System in the new expansion package of the Muscat International Airport. The Muscat International Airport, which is the largest airport in the Sultanate, is being expanded simultaneously to meet the growing passenger traffic.
Sponsored
Christchurch Justice and Emergency Services Precinct, NZ

Christchurch Justice and Emergency Services Precinct, NZ

Rondo Building Services Pty Ltd

Rondo was called upon to supply our market leading Seismic Wall and Ceiling System including Steel Stud & Track Drywall Framing, KEY-LOCK Concealed Suspended Ceilings, and DUO Exposed Grid Ceiling Systems.
Sponsored
Crown Metropol, VIC

Crown Metropol, VIC

Rondo Building Services Pty Ltd

Working with the site contractor, Expoconti, Rondo supplied products for the project, provided design work, and conducted weekly site inspections. Rondo’s technical assistance allowed for the designs to be simplified, which in turn provided a more cost effective approach.
Sponsored
Kuala Lumpur International Airport, Malaysia

Kuala Lumpur International Airport, Malaysia

Rondo Building Services Pty Ltd

Rondo has supplied our Key-Lock Suspended Concealed Ceiling System to the new KLIA2 terminal. The KLIA2 is built to be Malaysia's Next Generation Hub - an airport hub that will allow seamless connectivity between low-cost and full-service carriers.
Sponsored
Queensland Cotton Dalby Gin Storage Sheds, QLD

Queensland Cotton Dalby Gin Storage Sheds, QLD

Metroll

Built by FKG Group, Queensland Cotton's Dalby Project involved the construction of two large steel framed sheds with a total floor area of almost 20,000m2. Metroll is proud to have been involved in the supply of materials to this significant expansion of storage facilities.
Sponsored
Bunnings Warehouse Keperra, QLD

Bunnings Warehouse Keperra, QLD

Metroll

Designed by Group 4 Architects and built by De Luca Corporation the project includes: the Bunnings Warehouse building (17,719sqm), and three other separate buildings .Metroll is proud to have been involved in the supply of many Bunnings Warehouse projects including the Keperra store.
Sponsored
Commonwealth Law Courts, NT

Commonwealth Law Courts, NT

Rondo Building Services Pty Ltd

Rondo assisted Brett Watson Contracting in providing the featured elliptic curved detail that made the eye catching internal ceiling layout possible. Rondo supplied our KEY-LOCK Concealed Ceiling System to create the coffered ceiling treatments in the main atrium.
Sponsored
Tribecca East, WA

Tribecca East, WA

Rondo Building Services Pty Ltd

The project was developed thanks to the assistance of builders BGC Construction, ceilings and walls M2 Contracting and distributors Perth Plasterboard Centre. Local supply chain efforts have proven this project to be a success with on-time delivery, reliability, excellent customer service and the ease of installation.
Sponsored
ADNOC Head Quarters, Abu Dhabi

ADNOC Head Quarters, Abu Dhabi

Rondo Building Services Pty Ltd

Rondo is proud to be a supplier to ADNOC's new headquarters complex, which will be both a landmark building for the company as well as for the United Arab Emirates. Rondo have supplied the drywall framing as well as a wall cladding system using Rondo Furring Channel and fixing clips.
Sponsored
Quest Apartments, WA

Quest Apartments, WA

Rondo Building Services Pty Ltd

The project was subject to wind loading up to 2.8kPa ultimate and 1.9kPa serviceability. Our technical designs specified wall and ceiling systems, as well as complementary accessories to be supplied to the project. Being able to provide tailored designs within a tight deadline was crucial to the project.
Sponsored
Manly Beach Below Grade Project

Manly Beach Below Grade Project

Tremco

About the ProjectThis Child Health and Learning facility in Manly, deliversspecialist child healthcare for up to 15,000 families a yearfrom rural, regional and remote New South Wales andbeyond.The new facility will integrate a state-of-the-art child schooland health service that will accommodate regional childrenand families nationwide.This six storey building includes school classrooms,consultant and observation rooms, a paediatric oral healthunit with a dental and orthodontics room, ophthalmology,occupational therapy, sensory rooms and a telecare centre.ChallengeOver 80% of construction litigation and defect claims are a result of water ingress, of that 80%, almost 30% of those are below grade issues. (City Futures Research Centre UNSW).The two biggest waterproofing challenges for this build were:1) Below Grade - Non structural Blinding Slab, 4 metres below sea level and less then 50 metres from Manly Beach. This build had decanters pumping over 1.3 million litres of water per day awayfrom the site during the construction phase.2) The creation of a waterproofing solution which would not fail if the membrane was penetrated, be it in the pre or post construction phase.Due to the proximity to the beach and the build having a raft slab in the basement, a standard cookie cutter below-grade waterproofing solution was not an option for this build.Tremco SolutionTremco were asked to provide a solution for this complex build. The biggest and most demanding waterproofing areas within the build that needed attention were:1) Below Grade - 50 metres from the ocean and 4 metres below sea level, we needed a reliable waterproofing solution, that would also be robust enough to withstand any punishment tradesdelivered post installation, we recommended and used Paraseal SW (Saltwater). Paraseal SW is a multi-layer sheet membrane waterproofing system consisting of a self-sealing, expandable layer of bentonite laminated to an impermeable, high density polyethylene (HDPE).2) iAuditor reporting- iAuditor is an onsite quality assurance program Tremco conduct for the builder and applicator to ensure our products are being installed correctly and to specification. This gives the builder the confidence that there will be no waterproofing defects within the build.Overall, both the builder and developer were happy with the end result, which provided the warranty and quality required of such a development.
Sponsored
Taranaki Base Hospital, NZ

Taranaki Base Hospital, NZ

Rondo Building Services Pty Ltd

Rondo’s 92mm Steel Stud and Track system was selected for all internal works as it best meets all the requirements implemented by Warren and Mahoney, lead architects for this project. Factors such as spans, acoustics, loads, future proofing and supply were all considered during the initial design period.
Sponsored
Jaguar Land Rover Southport, QLD - Vitracore G2

Jaguar Land Rover Southport, QLD - Vitracore G2

Fairview Architectural

Fairview supplied builder Stokes Wheeler with Vitracore G2 for the Jaguar Land Rover 3-storey showroom at Southport, QLD. The high-end development required a premium finish in Jaguar Land Rover’s corporate colours and Vitracore G2 was selected as the preferred façade solution due to fire compliance.
Sponsored
Elm & Stone, VIC

Elm & Stone, VIC

Rondo Building Services Pty Ltd

Rondo were approached by Expoconti to supply the necessary wall and ceiling component of the build. The tower features multiple “loft” style apartments, which allows it to nestle one and two-bedroom apartments in an overlapping formation, giving both high-ceiling living areas and lofty mezzanine interior spaces.

Showing 37-56 of 56

Feedback