NBS Source
I'm a manufacturer

"screen based systems"

1,078 results found

Sort by:

Showing 37-72 of 138

Sponsored
Canberra Hospital

Canberra Hospital

RBA Group

The Canberra Hospital features the following RBA products:RBA8851-137 in their recently completed Bariatric Ward rooms.Canberra Hospital is the major public medical establishment based in Australia’s Capital Territory, with 672 beds to cater for the territory’s population of 550,000. The Hospital provides services including acute inpatient and day services, outpatient services, women’s and children’s services, paediatrics and pathology. Canberra Hospital is also a hub for education and research, remaining as the main teaching hospital for the Australian National University Medical School and the University of Canberra’s Nursing School. Canberra Hospital additionally accommodates for Clinical Pastoral Care institutions based in Sydney. RBA was thrilled to participate on a project that could better the experiences of both a myriad of patients and students.Canberra Hospital reached out to RBA to provide for a number of brand new Bariatric Rooms and one “Super Bariatric Room” during a refurbishment of the hospital’s orthopaedics services. These amenities are essential to providing comfortable care for individuals struggling with the growing obesity crisis, the Super Bariatric Room catering to people weighing up to half a tonne. As a result, RBA had to supply high quality, heavy duty bariatric facilities, whilst keeping a homely character to make patients comfortable in the clinical environment. Read the news article from the Canberra Times RBA’s supplication of our Bariatric Toilet, or the RBA8851-137, pictured below was vital for the project. Made of Stainless Steel, the toilet can withstand loads of up to 910 kg with no measurable deflection and 2200 kg with no permanent damage, maintaining strong and secure for its intended usage. Furthermore, the 304-type, or “Food Grade” Stainless Steel is constructed with corrosion resistance and allows for optimal hygiene. The unit supplied to Canberra Hospital has an optional P or S Trap, coming in an Enviro-Glaze® White Finish, best suited for the setting. However, this unit is also offered Enviro-Glaze® White external finish and a Stainless Steel internal finish, or a Stainless Steel total finish. Moreover, the unit is water-saving, holding a 3 Star (6.0L FF/3.0L HF/3.6L AF) WELS rating. The unit can additionally be accompanied by RBA’s Big John Bariatric Toilet Seat, or the RBA8186-853.
Sponsored
Health & Innovation Building, SA

Health & Innovation Building, SA

Rondo Building Services Pty Ltd

he developments $247.3m price tag makes it marginally more expensive than the $246m Adelaide University building next door. HIB will house the Centre for Cancer Biology and UniSA’s pharmacy school, with 450 researchers between them. Rondo’s involvement included providing ceiling and wall systems using our Shaftwall One-Way Erected System, KEY-LOCK Concealed Ceiling System and PANTHER Access Panels to create the desired effect.
Sponsored
Christchurch Justice and Emergency Services Precinct, NZ

Christchurch Justice and Emergency Services Precinct, NZ

Rondo Building Services Pty Ltd

Rondo was called upon to supply our market leading Seismic Wall and Ceiling System including Steel Stud & Track Drywall Framing, KEY-LOCK Concealed Suspended Ceilings, and DUO Exposed Grid Ceiling Systems.
Sponsored
Victoria Gardens Shopping Centre, VIC

Victoria Gardens Shopping Centre, VIC

Sculptform

The refurbishment of the Victoria Gardens shopping centre designed by Colab Design Studio uses Sculpform's Aluminium Click-on Batten system to create a stunning curved Oculus, along with feature walls and ceilings throughout the centre. Sculptform’s Click-on batten system provided a unique solution that could be customised to address the incredibly complex geometry of the existing architecture. Being able to use the same system for the mall cladding, mall ceiling installations and the oculus cladding ensured absolute consistency across the entire centre.
Sponsored
Adelaide Convention Centre, SA

Adelaide Convention Centre, SA

Rondo Building Services Pty Ltd

The project has called on our Technical Services Team for wall and ceiling designs, with significant quantities of Rondo systems used in the project including Rondo Stud and Track, KEY-LOCK Concealed Suspended Ceiling Systems and PANTHER Access Panels.
Sponsored
Lambton Square, NZ

Lambton Square, NZ

Rondo Building Services Pty Ltd

The $11.3 million dollar renovation of Lambton Square required Rondo product throughout including our Key-Lock Concealed Ceiling System, Steel Stud Wall framing system and various other Rondo components for the fixing of plasterboard and feature panels.
Sponsored
The Podiums, QLD

The Podiums, QLD

Rondo Building Services Pty Ltd

For instance, Superior faced the challenge of creating curved detailed bulkheads and feature ceilings. However, with Rondo’s help using a hybrid of the Rondo KEY-LOCK Concealed Ceiling System and Stud & Track Wall Framing System, they managed to create a great outcome.
Sponsored
The Icon - St Kilda

The Icon - St Kilda

Interpon Powder Coatings

A bold and significant new development has emerged in St Kilda as a ‘liveable Lego tower’, rising in tiered rainbow cubes that appear to balance like building blocks. Aptly named The Icon, the distinctive new building is wrapped in expanded aluminium mesh that changes colour as sunlight moves.The inspiration of artist Matthew Johnson, who worked with Jackson Clements Burrows Architects to conceptualise the distinctive complex, was achieved with Interpon Powder Coating on board as a collaborative partner.“My vision for the project was for people look up and see something interesting, to see something that is in a sense iconographic – as a marker or reference point,” explains Matthew.Interpon were involved with the project “right from the start”, explains Gareth Connell, Regional Specification, Interpon. Their association began after they were introduced to Pace Developments to discuss colour and product selection for the external façade.“We work closely with Interpon, and Pace asked us to quote with the product already powder coated,” says Ian Dunstan, southern regional sales manager at Locker Group, who manufacture perforated and expanded metal. Interpon were able to step in and develop the colour range separately, to meet the design brief and provide an ultra-durable coating system that meet the expectations of all parties.“The team at Interpon were very accommodating, engaged and professional in taking the concept on board,” says Matthew. “We were able to manifest unique colours based on the ratios I created with their chemist, inventing a whole new series of colours. This was crucial, as each level is depicted in different colour hue variations from earth to sky, which cross reference the nature of the geographical and environmental stratums. This flux of seasonal change is portrayed through subtle tonal gradation. Working with Interpon was a very fluid operation.”Interpon has collaborated on several high profile property developments and high rises over the years – although perhaps none quite as unique or with as many distinct characteristics as The Icon. “The nature of expanded aluminium mesh is such that it is formed by shearing and expanding aluminium sheet to create the ‘3D form’ effect. A visually appealing system for a façade, the shearing of the metal can present issues with very sharp edges, particularly in aggressive coastal environments,” Gareth explains.“Part of understanding this project was to comprehend as many elements as possible. Given the location was in St Kilda, with the bay just over 1.5km away, environmental considerations such as UV degradation, exposure to corrosive sea salts and prevailing winds needed to be considered.”After reviewing available data, such as Bureau of Meteorology weather patterns and local geography and topography maps, a specific duplex or two-layer powder finishing system was specified.“This consisted of a controlled preparation process for the expanded aluminium sheets. An epoxy barrier primer (was specified) to provide enhanced protection and to build the sharp edges in order to minimise issues associated with filiform corrosion. And the ultra-durability polyester powder top coat was developed in 34 distinct colours,” Gareth says.After the colour range was developed, it was applied by powder coating specialists Mansutti Bros. Lead by managing director Claude Mansutti, the team refinished hundreds of mesh panels over a period of nine months.“It was a major benefit to be using powder coating because, unlike liquid paints, powder is cured once it comes out of the oven and it’s ready to go once it’s cooled down. If they were painted, the drying phase could delay the process from refinish to installation by up to two weeks. It meant we were able to keep to a very strict schedule,” Claude says.“The project involved a lot of large spreadsheet work. There were 17 floors and over 30 colours, with panels in 15 sizes; it was quite a matrix to work with. But the end result is so different and so unique. It’s an interesting design and I’m sure it’s going to be a talking point for the area for many years.”
Sponsored
University of Utrecht

University of Utrecht

Boon Edam Australia Pty Ltd

With its glass walls, transparent façade and LED lighting, the Victor J. Koningsberger building, in the suburb of Uithof in Utrecht, cannot help but capture the eyes of all passers-by. The Viktor J. Koningsbergergebouw is dedicated to the faculties of Geosciences, Science and Medicine was designed by the renowned Rotterdam-based Ector Hoogstad Architects. This latest building addition to the University of Utrecht opted for a revolving door at their main entrance. The 3-winged Tourniket revolving door was custom-made and has been constructed almost entirely of glass. Director and project architect Joost Ector said, "The entrance had to be functional and recognisable, but also belong to the story of the building." The three central themes in the design of this iconic building are lightness, openness and transparency. All of these properties can be clearly seen in the building’s façade and play an important role at the main entrance. This bespoke revolving door towers at an impressive nine meters height. However, at this height issues such as rotating parts stand in the way, so a different solution needed to be chosen. Watch the video below to see which route architect Joost Ector selected and why.
Sponsored
Moonee Ponds, VIC

Moonee Ponds, VIC

Rondo Building Services Pty Ltd

Rondo Technical Representative Tino Cucinotta, worked closely with the 2DG team – and assisted with the supply of QUIET STUD Acoustic Wall System, Stud & Track and Finishing Sections, whilst Rondo’s newly released XPRESS Drywall Grid Ceiling System was due to arrive, ensuring the project could continue efficiently.
Sponsored
Al Zeina - Al Raha Beach, Abu Dhabi

Al Zeina - Al Raha Beach, Abu Dhabi

Rondo Building Services Pty Ltd

Rondo has supplied the external framing system for EIFS façade system in the Al Zeina development. Al Zeina is the strategic gateway to the new Al Raha Beach Development where the natural beauty of Abu Dhabi is captured by the creation of a collection of formal Arabic gardens, courts and plazas in the tradition of gardens of the world.
Sponsored
Peppers Pier Resort, QLD

Peppers Pier Resort, QLD

Rondo Building Services Pty Ltd

The Rondo Technical Services Department worked closely with CSR Gyprock to come up with a suitable External Wall system. The project consists of over 30,000 lineal metres of 92 1.15bmt lipped studs used for the external wall system and over 45,000 lineal metres of 64mm 0.50bmt lipped studs for the internal walls.
Sponsored
Kilmore Street Medical Centre, NZ

Kilmore Street Medical Centre, NZ

Rondo Building Services Pty Ltd

Rondo worked with Forman Commercial Interiors and Alpha Holdings on the three storey, $40 million project by providing all of the Steel Stud and Track requirements along with the KEY-LOCK Concealed Suspended Ceiling System. Due to the various wall systems designed, Rondo supplied diagrammatic specifications for the junction details to assist in completing the project, which finished in August this year.
Sponsored
Matisse Beach Club, WA

Matisse Beach Club, WA

Rondo Building Services Pty Ltd

Rondo worked closely with contractor Future Carpentry and Ceilings providing 92mm Stud & Track Systems, Key-Lock Ceiling Systems and heavy gauge Rondo products externally, throughout the project. A special feature in the design involved an intricate ‘wave’ ceiling feature requiring both convex and concave curved Rondo TCR sections to achieve the desired effect.
Sponsored
Matisse Beach Club, WA

Matisse Beach Club, WA

Rondo Building Services Pty Ltd

Rondo worked closely with contractor Future Carpentry and Ceilings providing Rondo 92mm Stud & Track Systems, KEY-LOCK Ceiling Systems and heavy gauge Rondo products externally, throughout the project. A special feature in the design involved an intricate ‘wave’ ceiling feature requiring both convex and concave curved Rondo TCR sections to achieve the desired effect.
Sponsored
Silkstone State School Parking Bays

Silkstone State School Parking Bays

Atlantis

APPLICATION: 52mm Drainage Cell.PROJECT LOCATION: Silkstone Qld.PROJECT DETAILS: Parking Bays at the Silkstone Primary School.PROJECT COMPLETION: Sep 2013.Atlantis system saves big old tree.At Silkstone State school Qld. a contentious issue arose. The school required car parking and a sealed one at that. But, in the proposed car park was a huge old tree. The tree could be cut down and the roots dug out or the tree couldbe left, with open soil above the root system to allow for infiltration to keep the tree healthy; but this would lose atleast six car spaces. What was to be done?The answer turned out to be simple – keep the tree, but surround the tree with Atlantis® Gravel Cell™ 52mm cells.Hence while the rest of the car park was sealed, the areaaround the tree was prepared and the 52mm cells werelaid and clipped together there and filled with 10mmgravel. This area was of sufficient size to provide 3 carplaces on each side of the tree and a driveway in frontof the tree, while at the same time allowing rainfall toinfiltrate through the gravel into the root system.Thus we had a win-win situation. Not only was the treesaved, and money saved on not having to remove it, butthe root system of the tree was protected by the GravelCell™ system, and six extra car spaces were created.
Sponsored
Wynn Place, Macau

Wynn Place, Macau

Rondo Building Services Pty Ltd

The hotel and casino will include a luxury hotel, gaming areas, dining, and retail and convention facilities along with numerous special attractions. Rondo provided this project with all the Drywall Steel Stud Partition Systems for the podium, gaming areas and the hotel tower. Included in the plan were also specially designed and supplied maintenance WALK–ABOUT Trafficable Ceiling Systems as per the project requirements.
Sponsored
Adelaide Medical Nursing School (AMNS), SA

Adelaide Medical Nursing School (AMNS), SA

Rondo Building Services Pty Ltd

Rondo’s Seismic products within each system included DUO Perimeter Trim Sliding Clip (Rondo 850), KEY-LOCK TCR Seismic Joiner (Rondo 865) and Seismic plenum braces. With the KEY-LOCK Seismic Concealed Ceiling System, two-side fixed, free wall perimeter connections and Rondo 141 Wall Track (1.15BMT to suit 129 Furring Channel) was used.
Sponsored
Park Hyatt, NZ

Park Hyatt, NZ

Rondo Building Services Pty Ltd

Due to tight plenum space and extremely congested plenum areas, Rondo’s new Xpress Drywall Grid System was the ideal ceiling system to use. This maximised the ceiling heights in all guest rooms while offering compliant plenum vertical clearances. Contractors implemented Rondo’s intricate feature ceilings and bulkheads throughout the entire building, such areas included the lobby, restaurants and conference areas.
Sponsored
Gold Coast University Light Rail Station, QLD

Gold Coast University Light Rail Station, QLD

Rondo Building Services Pty Ltd

Contractors Precision Interior Walls and Ceilings (PIWC) primary responsibility was the installation of the specialist linings on curved feature ceilings. PIWC Construction Manager, Ashley O’Connor mentions working closely with Rondo, and using CAD drawings to create a ceiling system before the panels were even made. “We designed and ensured the ceiling systems project’s specific design criteria were met”, said Ashley.
Sponsored
Ovo Green Square - Bike Parking for an Iconic Building

Ovo Green Square - Bike Parking for an Iconic Building

Cora Bike Rack

When deciding on bicycle parking solutions for the Ovo project, Cora Bike Rack presented its range of innovative product designs that could tailored for this special project. In order to provide maximum capacity and accessibility, Cora’s E3DT-GT double tier system, E3VR vertical wall mount system and CBR bike parking rails were combined to offer the ultimate AS2890.3 compliant EOT facility.
Sponsored
Santiago Airport, Spain

Santiago Airport, Spain

SAS International Australia

A Tricell system was designed by SAS International to fit the "Y" shaped departure lounge at Santiago Airport. SAS International has designed, manufactured and installed metal ceiling solutions for both interior and exterior areas of the new 74,000m² terminal of the Aeropuerto de Santiago, Spain. SAS810 tricell has been installed to create a triangular aesthetic in the departure lounges. This open cell system provides a geometric form that can easily be repeated for a striking finish. The flexible approach in SAS International’s design process enabled this unique solution to fit within the ‘Y’ shaped designed departure lounge. Installed in the main terminal and baggage hall, as well as exterior ceiling areas, is the linear profile system SAS710. The linear slat ceiling, designed so that each slat lines up neatly with the next, forms a perfect row resulting in clean and simple architectural lines. SAS710 was also chosen for the exterior of the building to provide continuity of design. Using specially designed slat retaining angles, the system has been adapted for strength and durability to prevent slats from being dislodged in high wind.
Sponsored
Fiona Stanley Hospital, WA

Fiona Stanley Hospital, WA

Rondo Building Services Pty Ltd

Rondo has supplied 80,000l/m of DUO Exposed Grid Ceiling System and 148,000 L/M of Steel Stud Drywall Framing System to three of the main buildings. As the design required a variety of special length products, Rondo has been producing large quantities of these items in advance and storing them at the Rondo warehouse in WA to enable quick supply and install for contractors on site, which ensures the project can progress at a rapid rate.
Sponsored
The Wharf Phase 2

The Wharf Phase 2

CarbonCure

Project Overview The Wharf Phase 2 will deliver the final more than 1million square feet (92,903 square metres) of mixed-use development to the vibrant waterfront neighborhood, The Wharf. Phase 2 will include a marina, office, residential and retail in addition to a 1.5 acre (0.6 hectare) park and abundant outdoor public space. Delivered in 2017, Phase 1 includes more than 2 million square feet (185,800 square metres) of development. The project architects and designers comprise one of the most impressive lineups in the nation, including SHoP Architects, WDG, ODA, Rafael Viñoly, Morris Adjmi Architects, Hollwich Kushner (HWKN), S9 Architecture, Michael Van Valkenburgh Associates, DCWDG Architecture, Parker Rodriguez, Rhodeside & Harwell, Thomas JuulHansen and Wolf Josey. Sustainable Waterfront CarbonCure-based concrete mixes were selected for the construction of The Wharf to support the sustainability goals. Vulcan Materials Company placed 18,891 cubic yards (14,443 cubic metres) of concrete made with CarbonCure through their partners at Concrete Mixes Inc. These mixes prevented the emissions of an estimated 134 tonnes of CO2. That’s equivalent to 175 acres (71 hectares) of forest absorbing CO2 for a year
Sponsored
Blue Cross Age Care, VIC

Blue Cross Age Care, VIC

Rondo Building Services Pty Ltd

MP Group were charged with managing the installation and finishing of all internal and external walls and this is also where Rondo offered our support. With the external structural steel framing having been installed 150mm out of position, Rondo’s Technical Services Team came to the rescue and designed an external stud wall system using our MAXIframe External Wall Framing System to ‘fill the gap,’ including design of special header bracing details to support the wall.
Sponsored
No.1 Collins Wharf, VIC

No.1 Collins Wharf, VIC

Rondo Building Services Pty Ltd

No 1. Collins Wharf is the latest part of the $1.2 billion development of the Victoria Harbour precinct. The 29-level apartment complex, built by Lend Lease and designed by Architectural firm, Bates Smart was completed in September this year and boasts 321 water-lined apartments and townhouses. Expoconti were awarded the wall and ceiling contract for the $106M development and soon after contacted Rondo to supply systems for the external walls, external cladding and internal suspended ceiling system.
Sponsored
Star of the Sea College, Brighton, VIC

Star of the Sea College, Brighton, VIC

Alspec

Looking back at one of the first buildings to use Alspec’s ecoWALL 225 structural framing system.
Sponsored
Sir Edward Weary Dunlop Retirement Village, VIC

Sir Edward Weary Dunlop Retirement Village, VIC

Rondo Building Services Pty Ltd

The Sir Edward Weary Dunlop Retirement Village has been completed with the help of architect, builder and contractor Ryman Healthcare. The 134-unit age care facility will house serviced care units and independent living units for the elderly with resort-style facilities. Rondo assisted in the development of this project, supplying a number of products including Stud and Track (64mm and 92mm x 0.55BMT), KEY-LOCK Suspended Ceiling Systems and MAXIjamb Systems for the large window and door openings leading onto balconies.
Sponsored
Multi-level Apartments with Enclosed Balcony, NSW

Multi-level Apartments with Enclosed Balcony, NSW

Breezway Australia Pty Ltd

Designed by Tony Owen Partners, Breezway Altair Louvre Windows were recommended to the Developer by the Architects at Tony Owen Partners due to their visually appealing aesthetics, the products full certification and compliance with Australian Standards, and Breezway’s strong reputation in the window industry. Altair Louvres with the Stronghold System have been strategically placed on the corner of the building as a key visual feature. Being a high quality window system, Altair Louvres will provide protection from the elements and are restricted to comply with Fall Prevention requirements.
Sponsored
Bailey Hotel and Resort

Bailey Hotel and Resort

Mapei Australia Pty Ltd

Installation of floor and wall coverings, Sealants application, Surface preparation, Tile & stone installation systems, Waterproofing
Sponsored
Burj Khalifa

Burj Khalifa

Boon Edam Australia Pty Ltd

The Burj Khalifa – formerly the Burj Dubai – is a legendary building that can only be described in superlatives. At 828 metres high, it is the tallest building in the world. The Burj Khalifa has 160 floors, more than any building in the world. The building also has the highest floor, the highest façade made of aluminium and glass, the highest nightclub and the highest restaurant, the highest service lift and the lift with the longest travel distance. Finally, the building has the highest positioned revolving doors ever installed in a façade worldwide. In less than 30 years, Dubai has become the leading city in the Middle East and is known for its architectural and technical excellence. The Burj Khalifa has become the symbol of this progress. The Burj Khalifa also takes the title of the highest structure in the world back to the Middle East; the Great Pyramid of Giza used to hold the title 4 millennia ago. International Collaboration The tower was designed by architectural firm Skidmore, Owings & Merril, known for their designs for the Willis Tower (formerly the Sears Tower) and the new One World Trade Center in New York. The three-pronged design is based on the spider lily desert flower and consists of three elements around a central core, with the elements spiralling upwards. It can rightly be called an international project: the construction team consisted of Samsung Engineering & Construction employees from South Korea in collaboration with Besix from Belgium and Arabtec from the United Arab Emirates. The UK consultancy Hyder Consulting was responsible for overseeing construction of the building. In total, companies from more than 30 different countries contributed to the construction of the Burj Khalifa. A Windy Challenge The wind is quite a challenge when building a skyscraper of this size. Without additional measures, the top of the building would move so much from side to side due to the wind that people would become seasick. Dubai is also regularly tested by the shamals: sandstorms that can last for days. As the outer façade of the Burj Khalifa contains an enormous amount of glass, these weather conditions presented a considerable challenge. The three-part design proved to be the solution because the spiral floors break the wind currents around the building, resulting in a stable structure. The World's Highest Revolving Doors Skidmore, Owings & Merril's design includes an observation platform on the 124th floor of the building. Two glass revolving doors provide access to this room. At 442 metres above the ground, these are the highest positioned revolving doors ever installed in the façade of a building. The revolving doors must also be able to withstand an extremely high wind load of at least 3000 Pascal, which corresponds to an F3 class tornado. The Burj Khalifa required two automatic revolving doors with a diameter of 3,000 mm and a total height of 2,700 mm; the cover could only be 300 mm high with the motor installed. Generally speaking, a revolving door with these specifications would only be able to withstand wind loads of up to 689 Pascal. It was clear, then, that not every revolving door manufacturer could supply an entrance that met these requirements. Challenge Accepted Koninklijke Boon Edam was one of only two companies invited to devise a system for this challenge. There were two main problems that had to be solved: the round sides of the revolving door had to be strong enough to resist the wind, and the door set had to be properly fixed so the door wings could not be blown off during a storm. Boon Edam worked closely with Mace, the Hyder Consulting Group, Samsung Engineering and Construction and Turner Construction, the subcontractor, to develop a system that met all these requirements. During the first phase of the process, the second company invited to tender had to give up because their design did not meet the challenging conditions on the 124th floor. Boon Edam persisted in its efforts, and after conducting various wind load and glass tests, it became possible to adapt the construction of the Tourniket to the requirements of the Burj Dubai. A Tornado-Proof Revolving Door at the Burj Khalifa Our proposal for the Burj Khalifa consisted of a Tourniket with specially reinforced door frames twice the width and thickness of a normal revolving door. These were securely anchored with special bolts under the floor to guarantee the structure's rigidity. Although most revolving doors are installed on the top of the subfloor, this door was installed under the top finish layer of the concrete floor. To guarantee the stability of the door set, an extra-thick steel frame was added to the structure. This allows the door wings to easily withstand the wind pressure. Expansion on the 148th Floor in 2014 Boon Edam installed the same specially designed Tourniket revolving door on the 148th floor as on the 124th floor. However, the new project brought an extra challenge: transporting all of the materials from the basement of the building to the 148th floor. First, the materials had to be transported in one lift to the 111th floor. They were then transferred to a second lift, from where everything had to be moved manually from the 149th floor to the 148th floor, to the door's location. Special Projects Based on Standard Solutions The revolving doors we created for the Burj Khalifa were an extreme challenge. The experience and expertise of our technicians combined with the tried and tested technology of the Tourniket enabled us to develop a successful solution. Both revolving doors are now used daily and give visitors a spectacular view of Dubai. The glass design beautifully complements the modern façade of the observation platform and puts Dubai's beautiful skyline in the spotlight.
Sponsored
Macquarie University Car Park Turf Cell

Macquarie University Car Park Turf Cell

Atlantis

APPLICATION: 52mm Turf CellPROJECT LOCATION: North Ryde NSWPROJECT DETAILS: Macquarie University Permeable Overflow Car ParkPROJECT COMPLETION: March 2017Established in 1964, Macquarie University began as a bold experiment in higher education. Built to break from traditions: to be distinctive, progressive, and to be transformational. Today its pioneering history continues to be a source of inspiration as they celebrate their place among the best and brightest minds.When Macquarie University’s existing cark park became too small for the amount of cars now using it, it was decided to construct an overflow car park. However, not just any car park, but in keeping with their innovative thinking, an environmentally friendly permeable car park. Of course the Atlantis® Turf CellTM system was chosen, so that turf covered parking spaces could be provided.The project required 9,843sq. m of Atlantis® Turf CellTM system, which is constructed from 480mm x 260mm x 52mm panels and has a rigid interlocking clipping system and is made from high quality recycled polypropylene. The project was undertaken by J & G Excavations and Asphalting (NSW) Pty Ltd.The Turf CellTM cells were laid on a bed of permeable soil, and filled with sandy soil and turf was then placed on top of the linked Atlantis® Turf CellTM cells and rolled with a heavy roller to press the roots into the soil in the cells, where they were protected from compaction and could grow freely both horizontally and vertically.The Turf CellTM system is another Atlantis invention, and is specifically suited for car parks, access roads, aircraft taxiways and helicopter landing pads as it has the following features:a high load bearing of approximately 4000t/sq. M;protects the root system of grass from compaction, while allow for vigorous horizontal and vertical root growth;permits surface water absorption and infiltration;has a long use life; andaesthetically, the system allows the grass to fill in completely, creating a lush lawn with an invisible reinforcement structure.
Sponsored
Dubai International Airport - Concourse 4, Dubai

Dubai International Airport - Concourse 4, Dubai

Rondo Building Services Pty Ltd

Rondo Steel Stud Drywall Framing System will be used in the construction of the Dubai International Airport - Concourse 4 project.
Sponsored
Liberty Global

Liberty Global

Boon Edam Australia Pty Ltd

Hospitality and security are often at odds with each other. The challenge is to find the best compromise between Fort Knox and a warm welcome. Telecom company Liberty Global recently carried out a major renovation of their head office in Schiphol-Rijk – the Netherlands. As part of the project, the access security was considerably tightened, without affecting their brand’s desired welcoming appearance. Liberty Global is an international telecommunication and television company. It is also one of the largest internet service providers outside the USA. Liberty Global operates in 14 countries and has 35,000 employees. The head office is based in London and additionally there are central offices in Amsterdam and Denver. Consumer brands that belong to Liberty Global include VodafoneZiggo (50% Joint Venture with Vodafone), Virgin Media, UPC, Unitymedia and Telenet. In the high-quality business park - Schiphol-Rijk, Liberty Global have seven office buildings, which, collectively, employ a total of around 1600 people of 55 nationalities. "We did have manned security at the main entrance, but that solution did not always prevent people from entering our central hall unnoticed," says Simon Kuitert, who holds the position of Corporate Security Manager at Liberty Global. "That is why we introduced a single point of entry for the recent renovation."
Sponsored
Farr Institute, Edinburgh

Farr Institute, Edinburgh

SAS International Australia

The Farr Institute in Edinburgh is a collaboration between six Scottish Universities and the NHS National Services Scotland. They aim to place the country as a global leader in health informatics research whilst improving the health of the Scottish population. 30,000 sq. ft. has been fitted out to accommodate Bio Incubator laboratories and offices together with meeting, conference and dining facilities. The remainder of the building will accommodate laboratories and offices for life science research. SAS International’s acoustic baffles were specified to meet acoustic demand and make the most of the high ceilings and breathable space. The colours, baffle layout and service integration were carefully co-ordinated to the brief. SAS130 and SAS330 were specified and installed in the central core. Both systems offer quick and easy access to otherwise hidden mechanical and electrical systems. With SAS130, tiles can be lifted out to gain access to the ceiling void. SAS330’s hinge notch allows tiles to be hung vertically from C-Profiles, providing unobstructed access to the ceiling void. Ray Kwiecinski at Michael Laird Architects gave the below quote on working with SAS International; “MLA has specified a variety of SAS International’s lay-in grid ceiling systems over the years and we have always been extremely satisfied with the finished product. At the Farr Institute however, we decided to create a feature of the structural soffits and the M&E services and, by careful coordination of these services, the steel beams… [With] the SAS Baffle System and SAS Raft System 600, we were able to create an open, collaborative and exciting office environment whilst maintaining a high degree of sound absorbency. Our Client is delighted with the results as are we.” The Institute’s independent research will support innovation in the public sector, leading to advances in preventative medicine, improvements in NHS care and better development of commercial drugs and diagnostics.
Sponsored
iFly Indoor Skydiving Centre, WA

iFly Indoor Skydiving Centre, WA

Rondo Building Services Pty Ltd

Working directly with sub-contractors Donnybrook Interiors and Architectural Ceiling Systems, Rondo delivered the walls and ceilings for this unique $15million build.

Showing 37-72 of 138

Feedback