NBS Source
I'm a manufacturer

"rubber panels slabs"

610 results found

Sort by:

Showing 1-36 of 54

Sponsored
Wall Panels for Seeping Walls

Wall Panels for Seeping Walls

Atlantis

APPLICATION: 30mm Wall PanelsPROJECT LOCATION: Redland Bay QldPROJECT DETAILS: Seeping WallsPROJECT COMPLETION: Jun 2011Atlantis fixing old water seepage problemsA property in Redland Bay Qld was having water seeping through the walls of the lower part of the property, which was below ground level.A trench was excavated to expose the walls which were below ground level, and the walls were allowed to dry out.A waterproof membrane was affixed to the wall and Atlantis® Flo- pipe® geotextile wrapped perforated pipes were clicked together and laid on top of the lower fold of the water proof membrane.A run of Atlantis® Flo-cell® drainage cells was sat on the perforated pipes and taped to the waterproof membrane, to extend along the length of the trench. The run of drainage cells was covered in hydrophilic geotextile and the trench filled in with compacted gravel.The water proof membrane formed a barrier to prevent water from contacting the walls of the property, while the 30mm drainage cell formed an air gap to relieve any hydrostatic pressure on the water proof membrane. Any water entering the drainage cell falls into the perforated pipe where it is taken away. This arrangement has been used, literally, thousands of time to overcome or prevent this seepage problem.
Sponsored
Hadspen Bull Run Reserve

Hadspen Bull Run Reserve

Adventure+

The Hadspen Bull Run Reserve playground is an excellent example of a community playground that suits everyone! Located within the Meander Valley Council in Tasmania, the park is a central hangout for the community in Hadspen. The vast range of equipment within the park is what makes this playground so special. There is something for all ages and interests, with a play unit, flying fox, multi-user rocker, wheelchair carousel, swings, single rocker, interactive panels, and a fitness station. While there is plenty for children, the fitness station also provides for the older demographic that may be minding the children on the playground, or doing their morning workout. Having the playground accessible was an important feature in the brief provided to adventure+. To reflect this, our design team included rubber paths for access through the playground, with access to low-level interactive panels and a wheelchair carousel. With our serious approach to play, we always aim to make our playground designs engaging and enjoyable. But, making the playground attractive is also essential. Selecting a modern colour scheme, as well as a play panel with an engraved bull image, makes the playground enticing, and ties the design to the name of the park.
Sponsored
Silk Contract Logistics Warehouse

Silk Contract Logistics Warehouse

Markham Global PTY LTD

AQURON 1000 penetrating hydrogel treatment was applied to the warehouse floor slabs for curing, sealing and deep hardening for durability.The slabs were poured in very high temperatures. The hydrogel treatment helped preserve the curing quality.This project was Green Star rated. AQURON 1000 is licenced to use the Environmental Choice New Zealand ecolabel, which is recognised by the Green Building Councils of Australia and New Zealand.
Sponsored
Rosewood Aged Care

Rosewood Aged Care

Markham Global PTY LTD

There were two sets of challenges involved in the Rosewood Aged Care.Firstly, waterproofing the basement. The basement was excavated around a heritage-listed building, which had to stay undamaged for the duration of the works. Piles and shotcrete were implemented for the construction, but there was no scope to install a membrane due to space and other limitations. The Markham BASE-TECT system was ideal for this situation.Second were the requirements for moisture control and permanent hygiene protection for the interior floor slabs of the residential parts of the building. This is a more routine challenge, faced by aged care facilities with concrete floor slabs. AQURON 2000 MEDI+ was selected for concrete curing enhancement and permanent hygiene sealing.
Sponsored
Mother Teresa Catholic College, WA

Mother Teresa Catholic College, WA

Termimesh

Mother Teresa Catholic College, WALocation – Baldivis, Perth, Western Australia      Installation Duration - 3 monthsInstallation Year – 2019                             Project Value - $15-20 millionSpecifying Architects – Parry and Rosenthal Architects TECHNICAL DETAILInstallation Type                                             NumberService penetrations                                     150Cluster penetrations                                      11Control joints                                                   700 LMConcrete slab pours                                       Grid pattern - numerousPerimeter                                                           500 LM  BACKGROUNDMother Teresa Catholic College is a progressive co- educational facility in the fast-growing suburb of Baldivis, 60 kilometres south of Perth in the City of Rockingham.The school opened in 2013 and in 2018/19 a Stage 3 Capital Development Program called for the construction of junior-secondary class-rooms and associated facilities, playing fields, courts, grounds, and extended parking. REQUIREMENTThe College’s ongoing plans for facility enhancements represents a significant investment and is worth protecting with the most effective pre-construction termite management system.The College caters for students from pre-kindergarten to Year 12. Chemical termite controls were not an option because of toxicity issues, making a clean and environmentally safe physical termite barrier the correct solution.APPROACHA typical WA site, the college’s location is predominantly flat, with sandy soils and substrates. In general, this type of environment poses a high risk for termite attack common to this region of Western Australia. SOLUTIONThe main challenge with the installation came from the rammed earth exterior walls. Their natural composition can chip easily, so nailing or sealing the termite barrier onto the wall was not practical.Our solution was to install Termimesh cold joint /paver trays to the perimeter of the concrete slab edge. These protected the concealed entry point between the slab and wall. They also engaged into the external pavement instead of against the rammed earth wall itself.BENEFITSThe Termimesh System which comprises of our 725 grade stainless steel mesh, Termiparge bonding cement and high grade stainless steel clamps not only met their strict requirement of no chemicals it will also continue to provide them with reassurance and peace of mind the comes with our market leading Pledge Guarantee. The Pledge Guarantee provides the client with a 10 year guarantee that requires no annual inspections during that initial period. The client then has the option to extend this on an ongoing basis by having an approved annual inspection.
Sponsored
West Side Place - Stage 1, Towers 1 & 2

West Side Place - Stage 1, Towers 1 & 2

Bostik Australia Pty Ltd

At Bostik, innovation comes in many forms.Ultraset® 3 in 1 is Bostik Australia's premium timber floor adhesive incorporating Thickness Control™ Spacer Technology, a proprietary feature consisting of recycled, ground-up car tyres mixed throughout the adhesive.When applied, the Thickness Control™ Spacers act like tiny rubber pillars, suspending the timber and maintaining optimal adhesive thickness to ensure superior performance as a moisture and impact sound reduction membrane.For West Side Place, Ultraset® 3 in 1 presented significant time and cost savings vs conventional multi-layer acoustic systems by eliminating the need to install a separate moisture barrier, acoustic underlay and additional layers of adhesive. Efficiencies that flowed directly onto the construction team, supporting trades and ultimately the developer, delivering a high performance solution within budget, ahead of schedule all the while guaranteeing a compliant and comfortable environment.
Sponsored
Colour by Design - Botanic

Colour by Design - Botanic

ECOTONE

CollaborationArchitect and Developer: Joe Adsett ArchitectsBuilder: Tomkins CommercialPrecaster: Advanced PrecastMaterial & ApplicationOur ECOTONE team provided expert colour application of ECOTONE Minsil to grey insitu concrete and the grey concrete precast elements. This included feature curved precast channel, raked precast concrete balustrade elements, insitu form grey concrete floor slabs and entry vestibule.OutcomeBotanic was designed by award winning architect Joe Adsett and positioned directly across from the iconic New Farm Park. Our ECOTONE finishes provided an excellent blend of surface colours to match in with a natural off-white concrete fairfaced appearance.
Sponsored
Coogee Oval Refurbishment, NSW

Coogee Oval Refurbishment, NSW

BRITEX Metal Products

Britex are proud to be involved in Randwick City Council’s refurbishment of Coogee Oval in NSW. Featuring a comprehensive upgrade of the current landscape, the installation of brand new facilities including male, female and accessible bathrooms feature Britex’ Signature high quality public amenities products such as vandal resistant toilets, hand basins and slab urinal and urinal pods. The Britex products installed as part of this project include: Britex Vandal Resistant Wall Mounted Round Basins (Product Code HBWMR)Britex Vandal Resistant Accessible Hand Basin (Product Code HBDA) Britex Centurion Accessible Pans with Vandal Resistant Toilet Seats (Product Code PCD) Britex Centurion Ambulant Pans with Vandal Resistant Toilet Seats (Product Code PCAM) Britex Centurion Standard Pan with Vandal Resistant Toilet Seats (Product Code: PC-SVRC-B) Britex Vandal Resistant Sanistep Urinal with Smart Sensor Flush Britex Vandal Resistant Sensor Activated Urinal Pods (Product Code: URAM)
Sponsored
Manly Beach Below Grade Project

Manly Beach Below Grade Project

Tremco

About the ProjectThis Child Health and Learning facility in Manly, deliversspecialist child healthcare for up to 15,000 families a yearfrom rural, regional and remote New South Wales andbeyond.The new facility will integrate a state-of-the-art child schooland health service that will accommodate regional childrenand families nationwide.This six storey building includes school classrooms,consultant and observation rooms, a paediatric oral healthunit with a dental and orthodontics room, ophthalmology,occupational therapy, sensory rooms and a telecare centre.ChallengeOver 80% of construction litigation and defect claims are a result of water ingress, of that 80%, almost 30% of those are below grade issues. (City Futures Research Centre UNSW).The two biggest waterproofing challenges for this build were:1) Below Grade - Non structural Blinding Slab, 4 metres below sea level and less then 50 metres from Manly Beach. This build had decanters pumping over 1.3 million litres of water per day awayfrom the site during the construction phase.2) The creation of a waterproofing solution which would not fail if the membrane was penetrated, be it in the pre or post construction phase.Due to the proximity to the beach and the build having a raft slab in the basement, a standard cookie cutter below-grade waterproofing solution was not an option for this build.Tremco SolutionTremco were asked to provide a solution for this complex build. The biggest and most demanding waterproofing areas within the build that needed attention were:1) Below Grade - 50 metres from the ocean and 4 metres below sea level, we needed a reliable waterproofing solution, that would also be robust enough to withstand any punishment tradesdelivered post installation, we recommended and used Paraseal SW (Saltwater). Paraseal SW is a multi-layer sheet membrane waterproofing system consisting of a self-sealing, expandable layer of bentonite laminated to an impermeable, high density polyethylene (HDPE).2) iAuditor reporting- iAuditor is an onsite quality assurance program Tremco conduct for the builder and applicator to ensure our products are being installed correctly and to specification. This gives the builder the confidence that there will be no waterproofing defects within the build.Overall, both the builder and developer were happy with the end result, which provided the warranty and quality required of such a development.
Sponsored
Colour Matching - Docklands Primary School

Colour Matching - Docklands Primary School

ECOTONE

CollaborationArchitect: Cox ArchitectureBuilder: Monaco HickeyDeveloper: Victorian School Building AuthorityMaterial & ApplicationThe off-white oxide coloured precast concrete panels of the project presented with unsightly and unacceptable patches. ECOTONE were engaged to colour the concrete surface using ECOTONE Minsil and ECOTONE Matt Plus to blend in the patches seamlessly with surrounds. The scope was then expanded to include the stained red oxide precast panels OutcomeA stunning result for both the off white and red precast concrete panels bring the project aesthetics back to design intent.
Sponsored
Government Building Parramatta

Government Building Parramatta

Tremco

Challenge750m2 roof with a large quantity of vents, air conditioning units and other equipment on the roof. Add to this problem damaged aging torch membrane, combined with Governments regulations regarding solar absorption and reflectivity of the building posed a real challenge for the applicator when determining a solution for the job.A second challenge for this job is the location of the building was located in the built up CBD of Parramatta with neighbours in close proximity, which meant the solution needed to be neighbourhood friendly.SolutionGiven the complexity of solution required for such a job AlphaGuard BIO is the only product which ticks all the boxes. AlphaGuard BIO is an extremely high performing composite waterproofing system, designed with a focus on roofing restoration. Due to AlphaGuard BIO being a liquid, it makes it ideal for jobs where there are machinery on the roof which needs to be worked around.AlphaGuard BIO has the ability to be installed over various existing roofing membranes in order to minimise tenant disruption and extend the life of the roof for an additional 20 years.It cures to form a durable rubber membrane surface that provides a lasting and easy-to clean waterproof coating. AlphaGuard BIO may be used to apply a seamless, monolithic waterproof membrane to concrete, primed metal, or existing roofing membrane surfaces.AlphaGuard BIO’s low VOC will minimise offensive odours to current tenants and applicators. The white top coat provides high solar reflectance, reducing the building’s operation costs and complying with Section J1.3(b) of the 2019 NCC.
Sponsored
Arthur Cox, Dublin

Arthur Cox, Dublin

SAS International Australia

Ireland’s second largest legal firm, Arthur Cox, has moved to its new headquarters, Ten Earlsfort Terrace, Dublin. Located a stone’s throw from St. Stephen’s Green, the LEED Platinum fit-out building is a marker of sustainable design. Architects, Scott Talon Walker, had a specific design requirement in mind so chose SAS International for their longstanding relationship and expertise. To accommodate the number of recurring apertures, Scott Talon Walker collaborated with SAS to create bespoke service panels within the SAS330 hinged mega panel tartan grid. The panel design features five unperforated squares which create a single unit capable of housing fire detectors, movement sensors and other electrical devices. These unique panels satisfy the client’s M&E stipulations, ensuring the building’s sustainable performance well into the future. Additional SAS systems installed include: SAS500 acoustic lighting baffles and SAS150. Both of these systems assure complete design flexibility and service maintenance in equal measure. Nominated for Fit Out Project of the Year – Large Office, SAS International has once again exceeded the mark to deliver premium metal ceiling solutions for its client.
Sponsored
University of Birmingham Library

University of Birmingham Library

SAS International Australia

Part of a vast regeneration programme to improve student amenities, the UoB invested £60m in a state-of-the-art academic library. The project aimed to celebrate the wider campus architectural styles and improve access to new resources like e-journals and wireless charging stations. Associated Architects chose SAS International to provide the high acoustic and finishing touches to the academic interior fit-out. In order to create an effective library environment, acoustic performance must also be carefully considered. With the aim to create a space suited for thousands of scholars, bespoke acoustic metal wall panels were supplied to the library. Depending on the location of each tile, the panels were finished in white and black-grey PPC or anodised in regency gold. Specified with a 23% or 50% open area, the panels act as acoustic absorbers with an oblong perforation. Each panel is fitted with a black, fleece-wrapped acoustic pad for high performance. The architects specified three additional acoustic treatments for open soffit areas over computer clusters and lounge spaces. SAS500 baffles and bespoke ring shaped and circular rafts were created by SAS International to fulfil this requirement. The discs and raft-halos are an SAS150 hybrid designed to fulfil acoustic and service requirements while contributing to the contemporary look. Consisting of multiple panels, the concealed grid system creates a smooth finish enclosed using a steel perimeter trim. Long 3m baffles were also installed in a continuous sequence along walkways and group study areas. These options provide durable acoustic solution, minimising maintenance and improving access to the soffit and services.
Sponsored
Rye Residence, VIC

Rye Residence, VIC

Alspec

The use of large panelled sliding doors deliver spacious indoor-outdoor living in this seaside home on the Mornington Peninsula.
Sponsored
Doha International Airport, Qatar

Doha International Airport, Qatar

Rondo Building Services Pty Ltd

Rondo have supplied the suspended ceiling support frame for a metal panel ceiling which will be used in the construction of the Doha International Airport project.
Sponsored
Ewingsdale Residence, QLD

Ewingsdale Residence, QLD

Alspec

Enclosed by three walls consisting of large panelled sliding doors, this rural property near Byron Bay maximises the opportunities to enjoy the sweeping rural aspect.
Sponsored
Heathrow Airport, Terminal 4

Heathrow Airport, Terminal 4

SAS International Australia

The £70 million project saw SAS International design and manufacture bespoke spun alum­inium profiled discs, acoustic metal wall panelling and System 600 rafts in the new terminal. The architects 3D Reid had to make the building light, airy and modern yet the façade and various materials used within the terminal had to withstand potential of a security breach. All products installed ‘land-side’ were required to meet the requirements of Aviation Security in Airport Development (ASIAD). The result answers aesthetic demands, yet provides the highest level of performance for the requirements of the building. For the design to be realised, square aluminium sheets were cut by the manufacturer into a circle and spun into a dome. Installation in such an environment means safety cables had to be attached to each disc, wall panel, tile and raft to ensure they do not fall and cause injury. Allowance for safety cables to be attached had to be taken into consideration during the design phase. Large vertical wall panels with an ultra-micro perforation were also specified to provide the necessary acoustic properties required for this vast open space. The very fine 0.7mm perforation, with 1% open area, helps to manage acoustics within the large open spaced terminal. The off-site modular manufacture of the architectural metalwork products meant installation was quicker, which causes less disruption to such a busy environment, and in addition there is no waste on site. Aesthetic versatility can be achieved using SAS International Architectural Metalwork throughout projects. It also allows for inte­gration of M&E services into the building design while meeting design demands and durability requirements. The range includes acoustic baffles, acoustic wall panels, air handling units, bespoke ceilings, and column casings.
Sponsored
Margaret Whitlam Grandstand – Waverly Oval

Margaret Whitlam Grandstand – Waverly Oval

Tremco

​About the ProjectThe sporting history of Waverly Oval dates from the 1880s when the Waverley Cricket Club gained approval to construct a pitch. Football codes also began using the park at this time. In 1890, the oval was created, and in 1898 the Waverley District Baseball club was founded at the oval.The first pavilion was built by the Waverley Cricket Club in the 1890s and Council built a second pavilion in 1908 with expanded facilities for the benefit of the cricketers and the public. This Pavilion was replaced in 1939 with an Inter War Functionalist style building. In April 2012 the new Waverley Park Pavilion was named the Margaret Whitlam Recreation Centre, in honour of the long association the late Margaret Whitlam (AO) had with the Waverley area. The pavilion was chosen because of its civic, community and recreational facilities incorporating several important aspects of Margaret Whitlam’s life.ProblemRemediation of the pedestrian areas of Margaret Whitlam Grandstand was completed 5 years ago but unfortunately was not successful due to product failure (not Tremco). Council contacted Tremco to provide an acceptable solution with the requirements that the new system needed to come with a 15 year warranty.The challenge of this project was not the 15 year warranty period, but the need for a low odour solution due to the area being in a Public/Government venue. Not all membranes have Low VOC properties.SolutionTremco recommended Vulkem 350/951NF/951NF for the job, which is not only low odour but also offers a 15 year warranty period as required from the council. Tremco offering onsite support throughout the project gave the council confidence in our product.Vulkem 350/951NF/951NF, is a composite waterproofing system comprised of tough-curing liquid polyurethane. It cures to form a durable rubber membrane surface that provides a lasting and easy-to-clean waterproof and trafficable coating. Textured surfaces for traffic will use an aggregate-laden top membrane to aid in wear and slip resistance.
Sponsored
Icnssc, QLD

Icnssc, QLD

Rondo Building Services Pty Ltd

Rondo worked closely with Wadsworth Contracting providing KEY-LOCK Concealed Ceiling Systems, Panther Access Panels, plastering beads as well as external 92mm framing, soffit framing, internal 76 & 64mm wall framing.
Sponsored
One New Change, London

One New Change, London

SAS International Australia

One New Change features SAS International bespoke metal ceiling panels with an expanded metal mesh, finished in silver, red and black. The ground-breaking, bold and perceptive £300 million One New Change mixed-use development project won the MIPIM AR Future Project Award 2010. Now complete, the building has become known as the ‘Stealth Bomber’ after the radar-proof combat plane that inspired its faceted form and has also won a RIBA 2011 Award for London and LDSA Building Excellence Award. The design incorporates pedestrian arcades converging at the core of the building, reinstating a historic north-south pedestrian route and allowing new panoramas of London’s landmark St Paul’s Cathedral. SAS International supplied the ceiling solution for the retail corridors of the development with a concealed suspension system, working closely with the architects to create a result where no visible fixings can be seen through the ceiling plane. To complement this, bespoke metal ceiling panels were produced with an expanded metal mesh, finished in silver, red and black. A challenging material to work with, to ensure the mesh held a uniform shape and corners for the panels could be formed accurately, SAS International’s solution was to create a ‘picture frame’ behind each panel. This also helped to provide support for the concealed attachment bolts. Design challenges at One New Change included the building grid size and shape (it was termed the most difficult site in Europe), the complex geometry of the structure (including some tight ceiling to structural beam heights), and a shared fire strategy between retail and office storeys. Requirements to achieve an environmentally-friendly building, complying with Part L and BREEAM ratings, were also critical and the design uses a materials palette of limestone, metal, mirror and a new method of fritted glass on the exterior to help shield the interior from glare.
Sponsored
Adelaide Convention Centre, SA

Adelaide Convention Centre, SA

Rondo Building Services Pty Ltd

The project has called on our Technical Services Team for wall and ceiling designs, with significant quantities of Rondo systems used in the project including Rondo Stud and Track, KEY-LOCK Concealed Suspended Ceiling Systems and PANTHER Access Panels.
Sponsored
Lambton Square, NZ

Lambton Square, NZ

Rondo Building Services Pty Ltd

The $11.3 million dollar renovation of Lambton Square required Rondo product throughout including our Key-Lock Concealed Ceiling System, Steel Stud Wall framing system and various other Rondo components for the fixing of plasterboard and feature panels.
Sponsored
Manukau Bus Station, NZ

Manukau Bus Station, NZ

Rondo Building Services Pty Ltd

Timber features were used throughout the project, with Decortech acoustic panels used to clad both internal and external ceilings. Rondo, in collaboration with BVT Engineering was engaged to provide design assistance for all external soffits/ceilings, internal walls and ceiling framing.
Sponsored
Meriton

Meriton

Evergreen Walls

Meriton is a long standing client of Evergreen Walls and we are their trusted provider of any artificial greenery needs that arise. In this particular fitout we installed a green wall as a feature piece in Meriton's Pagewood Green lobby with mirrors and timber panels atop the foliage in an impressive sprawling pattern.
Sponsored
Ropemaker Place, London

Ropemaker Place, London

SAS International Australia

SAS International bespoke metalwork comprising of a striking waveform shaped ceiling was designed by architects Arup Associates to feature in the construction of Ropemaker Place, London EC2 for British Land. Simon Anson, architect at Arup Associates comments; “The purpose of the ceiling was to provide the 10.5m tall entrance foyer with an acoustic performance, and create a lighting source providing both uplight and downlight. The illuminated ceiling provides the entrance foyer with visual impact from views of City Point Plaza, Ropemaker Street and The City.” Simon Anson continues, “The appearance of the ceiling is that of a series of illuminated vaulted waves flowing into the interior, the volume of the space perceptually expanded by the uplit waveform surfaces. The vaulted ceiling with its flowing contours provides a visually stunning focal point as well as a practical solution to the acoustic requirements of the interior of the building.” Specialist bespoke wave ceilings were installed in the atrium, main reception area, lift lobbies and main external canopy. The waveform panel, although elegant in appearance, had to have the required strength to support the light fitting. The extra weight posed a significant design challenge of how to integrate and support the light fitting into the waveform panel. The complex design required all fixings to be concealed, as a large proportion of the face and rear of the waveform tiles are visible. In the design development and installation of the system, Arup Associates worked closely with SAS International and the specified lighting manufacturer, Zumtobel, to ensure the panels integrated seamlessly with the luminaires to produce the optimum installation.
Sponsored
Westfield Centrepoint, NSW

Westfield Centrepoint, NSW

Rondo Building Services Pty Ltd

Westfield Shopping Centre in Sydney represents the next generation of retail experiences and is quickly becoming one of Westfield’s global flagships. In order to achieve the architectural specifications, Rondo designed a unique suspended ceiling system using boxed Rondo Steel Studs as ceiling joists to accommodate the loading of custom made timber panels.
Sponsored
Ronald McDonald House, SA

Ronald McDonald House, SA

Rondo Building Services Pty Ltd

The project has utilised a various range of Rondo products, including Stud and Track, DUO Concealed Grid System and PANTHER Access Panels to name a few. Rondo generously donated many of these products to this amazing charity, part FOC and part subsidised. With the official opening in May 2011, this house that will lend a hand to thousands of struggling families is sure to make a difference.
Sponsored
QT Hotel Perth, WA

QT Hotel Perth, WA

Rondo Building Services Pty Ltd

For instance, the guest room ensuite walls were mainly comprised of glazed aluminium panels made overseas. Unfortunately, this meant there were minimal tolerances in the set-out. Yet, because the hotel floors were generally the same layout, Rondo created a template system for setting out most of the guest rooms while also ensuring that ceiling heights were set exactly.
Sponsored
Gold Coast University Light Rail Station, QLD

Gold Coast University Light Rail Station, QLD

Rondo Building Services Pty Ltd

Contractors Precision Interior Walls and Ceilings (PIWC) primary responsibility was the installation of the specialist linings on curved feature ceilings. PIWC Construction Manager, Ashley O’Connor mentions working closely with Rondo, and using CAD drawings to create a ceiling system before the panels were even made. “We designed and ensured the ceiling systems project’s specific design criteria were met”, said Ashley.
Sponsored
Trust Towers, Abu Dhabi

Trust Towers, Abu Dhabi

SAS International Australia

This unique offset ellipse design tower had to allow the ceiling to flow around the building. A bespoke SAS330 metal ceiling system was specified incorporating trapezoidal panels. Trust Tower forms one of three new tower blocks; part of the Central Market development. The first tower to be completed is tower three a 59-storey commercial office development. The tower is a unique offset ellipse design, to allow the ceiling to flow around the building a bespoke. SAS330 metal ceiling system was specified incorporating trapezoidal panels. Enabling a monolithic finish to the ceiling plane, black service troughs house recessed lighting and other MEP services; this enables maximum acoustic performance to be achieved from the ceiling tiles. Over 900 different sized ceiling tiles were manufactured and installed throughout the project. Metal ceilings provide durability, accessibility to the ceiling void and low maintenance. The life-span of SAS International’s metal ceilings is in excess of 25 years with only very basic maintenance. The entrance mezzanine area features a four-storey high ceiling finished in midnight blue, providing a dramatic entrance to this iconic building.
Sponsored
Hotel Jakarta, Amsterdam

Hotel Jakarta, Amsterdam

Boon Edam Australia Pty Ltd

Imagine waking up in this 4-star luxury hotel with panoramic view of the IJ and the city of Amsterdam. Hotel Jakarta: a BREEAM Excellent certified energy-neutral hotel in Amsterdam. Designed with sustainability in mind. Unique for the Netherlands is the 30-meter-high timber structure of the hotel. All columns, ceilings and frames are made from natural, FSC or PEFC certified wood. The south and east façades are covered with 700 m2 of building-integrated solar energy panels (BIPV panels). The glass roof that covers the atrium also contains BIPV cells that, in addition to collecting energy, also function as sun blinds for the subtropical inner garden. The atrium is the center of the hotel and works as a temperature controller in both summer and winter. On each side of the building, rooms have their own covered outdoor space that functions as a structural awning. A custom made revolving door provides access to the hotel where there is a dynamic public area with various bars, restaurants, coffee corners and a wellness center. This transparent revolving door is almost 6 meters high and fits perfectly with the appearance of the facade. In addition, this type of entrance solution is in line with the sustainability requirements of the building.
Sponsored
Crown Towers, WA

Crown Towers, WA

Rondo Building Services Pty Ltd

The tower corridors to the hotel rooms followed a slight curve and the Rondo Technical Services Team were engaged to provide many engineered designs for both internal and external wall framings, as well as internal ceilings and external soffit framings. This included Stud & Track, MAXIframe External Wall Framing System, EXANGLE Finishing Sections and PANTHER Access Panels, all needed to meet the detail required throughout the tower and podium levels.
Sponsored
South Australian Health & Medical Research Institute (SAHMRI), SA

South Australian Health & Medical Research Institute (SAHMRI), SA

Rondo Building Services Pty Ltd

With a demand for leading scientific research facilities growing year upon year, the South Australian Government commissioned the development of the South Australian Health & Medical Research Institute (SAHMRI). Since the project commenced in 2010, Rondo has supplied our KEY-LOCK Suspended Ceiling System, Steel Stud and Track, DUO Exposed Grid Ceiling System, PANTHER Access Panels, Shaftwall and Walk-About Trafficable Ceiling System.
Sponsored
Health & Innovation Building, SA

Health & Innovation Building, SA

Rondo Building Services Pty Ltd

he developments $247.3m price tag makes it marginally more expensive than the $246m Adelaide University building next door. HIB will house the Centre for Cancer Biology and UniSA’s pharmacy school, with 450 researchers between them. Rondo’s involvement included providing ceiling and wall systems using our Shaftwall One-Way Erected System, KEY-LOCK Concealed Ceiling System and PANTHER Access Panels to create the desired effect.
Sponsored
New Street Station, Birmingham

New Street Station, Birmingham

SAS International Australia

Birmingham New Street Station was originally re-built in 1967 to accommodate 650 trains carrying 60,000 passengers per day. By 2010 it had become the busiest station outside of London, operating at more than twice its intended capacity. The first half of the refurbishment was completed in 2013. The station’s recently updated configuration should now accommodate a yearly 8.3% rise in passenger numbers. SAS International commenced work on the three-phase project in June 2012. NG Bailey and main contractor Mace installed SAS systems across the platforms, the shopping centre and the concourse. Full scale, physical mock-ups of the bespoke ceiling solutions were built on-site to ensure design intent prior to installation. The integration of fans for smoke extraction and complex wind loads had to be considered to guarantee passenger safety. The wind loads were a concern as trains passing platforms at speed can cause considerable negative loads. Bespoke ceilings comprising fixed angle bulkheads were installed in line with the curving platforms. The typically trapezoidal bulkheads were bolted end to end in order to form a faceted layout to follow these curves. Using shared data from the project’s BIM model, SAS International used a point cloud to measure the platforms and 3D model the panels. The model’s geometry revealed that the platforms were all non-uniform. This posed a significant design challenge. The data required careful analysis in order to achieve a smooth curved line within the platform edge. This was essential to provide train drivers with an unobstructed view coming into and out of the station. The SAS International design team was able to rationalise the number of unique panel types down to four. This overcame the driver visibility issue, ensured uncompromised aesthetics and brought costs within budget. Electronic Total Station setting-out techniques were then used to set out the panels along the curve.
Sponsored
Forensic Pathology & Coroner’s Court, NSW - Vitracore G2

Forensic Pathology & Coroner’s Court, NSW - Vitracore G2

Fairview Architectural

The Forensic Pathology & Coroner's Court is located in Lidcombe NSW. Fairview's deemed-to-satisfy non-combustible Vitracore G2 panels were chosen to achieve the unique exterior as designed by Silver Thomas Hanley and Cox Architecture, The design features vertical fins with pyramid details in five complementary finishes - Fresh Green, Pure White, Cool Grey from Fairview standard range and custom colours. Bechett and Irish Moore. Builder: Watpac NSW, Architect: Silver Thomas Hanley & Cox Architecture.

Showing 1-36 of 54

Feedback