NBS Source
I'm a manufacturer

"non relocatable partitions"

403 results found

Sort by:

Showing 1-27 of 27

Sponsored
Resin Grip - Thomas Borthwick & Sons

Resin Grip - Thomas Borthwick & Sons

Real World Epoxies Pty Ltd

Non-slip epoxy flooring in an abattoir.
Sponsored
Resin Grip - TGI Fridays

Resin Grip - TGI Fridays

Real World Epoxies Pty Ltd

Non-slip epoxy flooring in a commercial kitchen.
Sponsored
Resin Grip - Rio Tinto

Resin Grip - Rio Tinto

Real World Epoxies Pty Ltd

Non-slip epoxy flooring in a mining maintenance workshop.
Sponsored
Resin Grip - Queensland Rail

Resin Grip - Queensland Rail

Real World Epoxies Pty Ltd

Non-slip epoxy flooring in a railway maintenance workshop.
Sponsored
Resin Grip - Boral

Resin Grip - Boral

Real World Epoxies Pty Ltd

Non-slip epoxy flooring in a roof tile factory.
Sponsored
IOI City Mall, Malaysia

IOI City Mall, Malaysia

Rondo Building Services Pty Ltd

IOI City Mall is the biggest shopping mall in Malaysia at 1.35 million square feet, incorporating Rondo Drywall Framing for the internal wall partitions. This mall comes together with 2 tower office blocks and one hotel which will be completed in stages.
Sponsored
ICC Sofitel Sydney, NSW

ICC Sofitel Sydney, NSW

Rondo Building Services Pty Ltd

Rondo’s unrivalled ability to provide Seismic designs and our strong working relationship with Sydney Projects made choosing our products a no-brainer. Importantly, this was the first major hotel project where seismic requirements needed to be addressed, and therefore Rondo supplied designs for internal wall partitions, ceilings, seismic walls and seismic bulkheads.
Sponsored
Wynn Place, Macau

Wynn Place, Macau

Rondo Building Services Pty Ltd

The hotel and casino will include a luxury hotel, gaming areas, dining, and retail and convention facilities along with numerous special attractions. Rondo provided this project with all the Drywall Steel Stud Partition Systems for the podium, gaming areas and the hotel tower. Included in the plan were also specially designed and supplied maintenance WALK–ABOUT Trafficable Ceiling Systems as per the project requirements.
Sponsored
Dr Chau Chak Wing Building, NSW

Dr Chau Chak Wing Building, NSW

Rondo Building Services Pty Ltd

This new building was constructed by Lend Lease with Foxville Projects Group (NSW) being appointed as the lead fit out contractor. Rondo supplied an extensive range of ceiling and partition systems, as well as technical support throughout the project, which included design for all the internal walls, shelf loads, balustrade design utilising stud and track as well as ongoing support throughout the project construction period in regards to Rondo products within the design criteria.
Sponsored
Kubix Apartments, VIC - Vitracore G2

Kubix Apartments, VIC - Vitracore G2

Fairview Architectural

The inspiring Kubix Apartments development features an impressive 16,500 m2 of Vitracore G2 - the leading deemed-to-satisfy non-combustible, aluminum composite cladding - in a myriad of colours over the geometric façade. Builder: Crema Constructions, Architect: CBG Architects.
Sponsored
Hayward Field

Hayward Field

ASI JD MacDonald Pty Ltd

Hayward Field has always held a special place in the history and traditions of the University of Oregon, as well as for generations of athletes and fans in the state of Oregon and around the world. As the host site for the 2021 US Olympic Trials and the 2021 Track and Field World Championships, Hayward Field was primed for a 21st century “reimagining” on an epic scale.Understanding that the project’s aesthetic should extend to all areas of the venue, including the restrooms, the design team challenged ASI Group for a solution that aligned with the arena’s sophisticated design. They wanted the restrooms to offer athletes and fans the facilities necessary to maximize their experience, with an added focus on total privacy.ASI rose to the challenge, delivering 144 Alpaco™ Classic Overhead Braced Partitions, along with 36 urinal screens. A perfect blend of simplicity and function, ASI’s exclusive Ultimate Privacy™ offers zero sightline doors and pilasters that meet in a flush finish, with routed, overlapping closures to guarantee total privacy. ASI partitions are offered in a range of standard and custom colors, with crisp design lines, bold hardware options, and superior functionality that’s perfect for high-profile settings like Hayward Field. The self-closing feature of the Alpaco™ doors delivered a sleek, uniform appearance whether the facilities are in use or not.
Sponsored
Kenworth Sales & Service Complex

Kenworth Sales & Service Complex

PROBOND Architectural

PROMINIUM in Natural White has been utilized on this project for Kenworth Trucks. The spectacular result on the sales and service complex is worthy of this iconic brand. The choice of PROMINIUM 3mm Solid Aluminium ensures the façade is rated non-combustible to AS 1530.1 Standards, safeguarding vehicles, plant and personnel.
Sponsored
Gurner Apartments, QLD

Gurner Apartments, QLD

Rondo Building Services Pty Ltd

Located in Fortitude Valley in the heart of Brisbane. Builder, Multiplex began Stage 1 of this $200m project in May 2015 and completed it in July this year. Subcontractor, Precision Interior Walls & Ceilings enlisted Rondo’s expertise in designing the internal ceilings and partitions, external walls and soffit framing. Designed by Architect’s Elenberg Fraser, Stage 1 of the development consisted of 32 levels with 910 luxury apartments sprawled across two towers. This will eventually form part of three residential towers incorporating ground floor retail areas, cafés, restaurants and over 1000 apartments in total.
Sponsored
Northpoint Tower Refurbishment, NSW - Vitracore G2

Northpoint Tower Refurbishment, NSW - Vitracore G2

Fairview Architectural

Northpoint Tower, centrally located in North Sydney CBD has been overhauled, with the redevelopment project including a newly-constructed hotel and a complete reclad of the façade using Vitracore G2.The use of Vitracore G2 in this reclad project has ensured a deemed non-combustible, durable and modern appearance to the development. Installer: ABS Facade.
Sponsored
Perth Optus Stadium, WA - Stryüm

Perth Optus Stadium, WA - Stryüm

Fairview Architectural

The Perth Optus Stadium is a world-class sporting venue located within WA, Stryum, Australian-made, non-combustible façade system, was chosen to provide a unique and customised finish to the 60,000 seat Perth Stadium development. The stadium features over 16,000m2 of Stryum in 6 different anodized colours. Builder: Brookfield Multiplex, Architect: WESTADIUM
Sponsored
Lantern Apartments, VIC - Vitracore G2

Lantern Apartments, VIC - Vitracore G2

Fairview Architectural

Fairview provided the Collmill Group with Snow White Vitracore G2 to clad the bespoke Lantern Apartments in Melbourne's inner-city suburb of Collingwood. Our deemed-to-satisfy non-combustible product was ideal for the residential development due to its weather resistant coating and the lightweight nature which allowed for greater ease of off-site pre-cladding. Builder: Orange Building Solutions, Architect: Plus Architecture.
Sponsored
Forensic Pathology & Coroner’s Court, NSW - Vitracore G2

Forensic Pathology & Coroner’s Court, NSW - Vitracore G2

Fairview Architectural

The Forensic Pathology & Coroner's Court is located in Lidcombe NSW. Fairview's deemed-to-satisfy non-combustible Vitracore G2 panels were chosen to achieve the unique exterior as designed by Silver Thomas Hanley and Cox Architecture, The design features vertical fins with pyramid details in five complementary finishes - Fresh Green, Pure White, Cool Grey from Fairview standard range and custom colours. Bechett and Irish Moore. Builder: Watpac NSW, Architect: Silver Thomas Hanley & Cox Architecture.
Sponsored
Port House

Port House

ASI JD MacDonald Pty Ltd

Recognized for its maritime importance by Napoleon Bonaparte, the Port of Antwerp is the second largest port in Europe and fifth largest in the world, and has had a significant impact on European history. Appropriately known as “the Diamond Capital of the World,” Antwerp sees $16 billion in polished diamonds pass through its exchanges each year, with the city boasting an overall turnover of $54 billion in the gemstone.By 2007, however, the Port of Antwerp had outgrown its office space. To maintain the port’s prominence in an ever expanding international arena, the city needed a sustainable, future-proof workplace, with a design that represented the city’s past, present and future.To compliment the iconic structure and allow future workforce expansion, the building needed iconic washroom facilities that guaranteed sophistication, privacy, and the flexibility to grow. To deliver on these lofty washroom design requirements, Zaha Hadid Architects turned to ASI Group Europe. Custom-made, extra-height black Alpaco partitions provide superior privacy in the stunning washrooms. Stainless steel hardware accents the washroom design, adding distinction worthy of the building’s reputation and a touch of modern aesthetics. The elegance of stainless steel washroom accessories add sophistication to an already distinct design.
Sponsored
Colour by Design - Macarthur Anglican School

Colour by Design - Macarthur Anglican School

ECOTONE

Collaboration Architect: Mayoh ArchitectsBuilder: Reitsma ConstructionsDeveloper: Macarthur Anglican SchoolMaterial & ApplicationUsing our CXD process in collaboration with the design team, our ECOTONE team created a specialised wood grain colour finish using ECOTONE Matt Plus and ECOTONE Sharp. The surface colour finish was applied onsite to the grey compressed fibre cement cladding soffits to match in with the internal timber used in the project.OutcomeThe design required a space that was inviting and inspiring to students allowing them to remain in touch with the outside as well as being environmentally friendly. Our long-life ECOTONE finish to cladding replicating natural wood delivered in both design and sustainability. This project also went on to win a commendation award for Learning Environments Australasia Category 2: New Construction / New Individual Facility (or Facilities) Over $8m.TestimonialThe challenge of incorporating feature timber soffits within a bushfire zone was solved by the use of ECOTONE over non-combustible fibre cement sheeting. The soffits were colour matched to the natural spotted gum timber, which was used internally, resulting in a seamless visual appearance and an external soffit that is almost indistinguishable from real timberJonathan Henley, Mayoh Architects
Sponsored
Flowcrete Australia Works Wonders at Swinburne University Workshop

Flowcrete Australia Works Wonders at Swinburne University Workshop

Flowcrete

Swinburne University of Technology located in Hawthorn, Victoria required a new flooring solution for its Department of Architectural and Industrial Design workshop space. To find a solution that was both durable and decorative, Flowcrete Australia was consulted.600 m2 of Flowfresh SR in a custom Ultramarine Blue was installed at the Swinburne University Hawthorn campus thanks to its robust nature and ability to be specified in a bespoke colour.The workshop, locker area and classrooms provide students with a creative space to formulate, plan and create their visions, and the custom colour was chosen to help inspire and keep the creative juices flowing!As well as being extremely hard-wearing, the polyurethane system Flowfresh SR is also chemical resistant, meaning that it could withstand spills of drinks, paints or other substances that could harm lesser floors.Although Flowfresh SR has a positively textured surface with non-slip aggregates, the flooring system is also very easy to clean, meaning that spills or dirt could easily be wiped away, maintaining a safe space for staff and students.Prior to the application of Flowfresh SR, substantial remediation works were required including the removal of timber parquetry and the filling of over 100 lineal metres of 50mm deep service trenches.
Sponsored
New Street Station, Birmingham

New Street Station, Birmingham

SAS International Australia

Birmingham New Street Station was originally re-built in 1967 to accommodate 650 trains carrying 60,000 passengers per day. By 2010 it had become the busiest station outside of London, operating at more than twice its intended capacity. The first half of the refurbishment was completed in 2013. The station’s recently updated configuration should now accommodate a yearly 8.3% rise in passenger numbers. SAS International commenced work on the three-phase project in June 2012. NG Bailey and main contractor Mace installed SAS systems across the platforms, the shopping centre and the concourse. Full scale, physical mock-ups of the bespoke ceiling solutions were built on-site to ensure design intent prior to installation. The integration of fans for smoke extraction and complex wind loads had to be considered to guarantee passenger safety. The wind loads were a concern as trains passing platforms at speed can cause considerable negative loads. Bespoke ceilings comprising fixed angle bulkheads were installed in line with the curving platforms. The typically trapezoidal bulkheads were bolted end to end in order to form a faceted layout to follow these curves. Using shared data from the project’s BIM model, SAS International used a point cloud to measure the platforms and 3D model the panels. The model’s geometry revealed that the platforms were all non-uniform. This posed a significant design challenge. The data required careful analysis in order to achieve a smooth curved line within the platform edge. This was essential to provide train drivers with an unobstructed view coming into and out of the station. The SAS International design team was able to rationalise the number of unique panel types down to four. This overcame the driver visibility issue, ensured uncompromised aesthetics and brought costs within budget. Electronic Total Station setting-out techniques were then used to set out the panels along the curve.
Sponsored
Deakin Uni LC Building

Deakin Uni LC Building

RBA Group

The Deakin Uni LC Building features the following RBA products:RBA2733-032 – Compact Water Cooler Stainless Steel ShroudRBA2732-001 – Push Button Bottle Filler Stainless SteelDeakin University holds multiple campuses across multiple Melbourne suburbs. The University houses four main faculties, arts & education, business & law, health, and science, engineering & built environment. Deakin Uni is also renowned for its world-leading online tertiary education program, innovating modern education. Located to the west of the heart of Melbourne, the Burwood Campus holds the newly-unveiled LC Building, designed in an innovative way, holding multiple levels of formal and informal learning areas, health and wellbeing services and a premium staff working space for the Law School. The building aims for sustainability, sporting solar panels, native flora in its Wellness Garden and indoor greenery. The contemporary “green” design had to include RBA, as we share the same goal of sustainability. Furthermore, by providing to the ever-innovative Deakin University, we are improving the learning experience of the education sector.Pictured below, RBA’s ‘Compact’ Water Cooler, or the RBA2733-032, flows 30L of water per hour. RBA categorises the unit as ‘heavy duty’, meaning it maintains to be strong and long-lasting. Made of Stainless Steel with a Satin Finish, it has an Anti-microbial flexible bubbler with self-closing push button and non-squirt features (stainless steel bubbler options available upon request). Included is an integral perforated drain for hygiene & ease of cleaning. The Water Cooler exhibits a smooth radiused design that eliminates sharp corners thus minimising catch. All pipework is concealed within the Stainless Steel Shroud and contains the option of a Bottle Filler.Deakin University LC Building decided to pair the Water Cooler with a Push Button Bottle Filler, or the RBA2732-001. Users hold their bottle in the recess provided and press the button to activate the flow of water. Flow stops upon releasing the button. Spillage is directed onto the deck of the Water Cooler mounted underneath. Thus, students have a sustainable alternative for hydrating.
Sponsored
Rainwater harvesting for a government facility

Rainwater harvesting for a government facility

Atlantis

Project Location: Amberley, Queensland, AUSTRALIA.In Amberley is one of the largest base facilities in Australia. The redevelopment works are valued at AU$331.5 million. New construction and refurbishment works to be undertaken include newliving-in accommodation, maintenance facilities, storage, working and training accommodation, a combined mess and a new physical fitness centre.The site is owned by an Australian Government Department. The Atlantis® Turf Cell® was supplied by Atlantis and was installed by Kennedy Projects Group in April 2009. The system is located at the playing fields on the south-western corner of Gannet St and Rosewood Road, Amberley, QLD.A vegetated swale surrounds the playing field. The swale is an open, shallow channel designed to slow runoff, filter it, and promote infiltration into the ground. Excess water moving through the soil profile is captured by Atlantis® Matrix® Tank – Single modules. The use of a swale to collected water results in smaller runoff volumes, lower peak discharge rates and cleaner runoff. The vegetation in swales, usually thick grass, helps to trap pollutants such as suspended solids and trace metals. The Atlantis Matrix modules extend 3m (10ft) wide under the swale for 110m (360ft).Water collected by the swale is collected in a stormwater harvesting tank located adjacent to the north-western corner of the playing field. Perforated corrugated plastic pipes used as subsurface drainage pipes extend for 1560m (5110ft) is also collected by the stormwater harvesting tank.The stormwater harvesting tank is located subsurface and is constructed of a heavy duty low density polyethylene liner and non woven geotextile surrounding Atlantis® Matrix® Tank - Double modules. The Atlantis stormwater tank has a 4,100m3 (144,80 ft3) capacity. Water collected by the swale and stormwater tank system is used for irrigation of the sports field.The Atlantis stormwater tank has eight (8) cleanout / inspection ports placed through the systems. A 1200mm (4ft) dia. wet well with bolt down lids has been installed adjacent to the tank serves as a pump out pit. The overflow from the tank has a 15m (50ft) long x 400mm (1.3ft) deep spill way with scour protection into an adjacent creek.
Sponsored
Manly Beach Below Grade Project

Manly Beach Below Grade Project

Tremco

About the ProjectThis Child Health and Learning facility in Manly, deliversspecialist child healthcare for up to 15,000 families a yearfrom rural, regional and remote New South Wales andbeyond.The new facility will integrate a state-of-the-art child schooland health service that will accommodate regional childrenand families nationwide.This six storey building includes school classrooms,consultant and observation rooms, a paediatric oral healthunit with a dental and orthodontics room, ophthalmology,occupational therapy, sensory rooms and a telecare centre.ChallengeOver 80% of construction litigation and defect claims are a result of water ingress, of that 80%, almost 30% of those are below grade issues. (City Futures Research Centre UNSW).The two biggest waterproofing challenges for this build were:1) Below Grade - Non structural Blinding Slab, 4 metres below sea level and less then 50 metres from Manly Beach. This build had decanters pumping over 1.3 million litres of water per day awayfrom the site during the construction phase.2) The creation of a waterproofing solution which would not fail if the membrane was penetrated, be it in the pre or post construction phase.Due to the proximity to the beach and the build having a raft slab in the basement, a standard cookie cutter below-grade waterproofing solution was not an option for this build.Tremco SolutionTremco were asked to provide a solution for this complex build. The biggest and most demanding waterproofing areas within the build that needed attention were:1) Below Grade - 50 metres from the ocean and 4 metres below sea level, we needed a reliable waterproofing solution, that would also be robust enough to withstand any punishment tradesdelivered post installation, we recommended and used Paraseal SW (Saltwater). Paraseal SW is a multi-layer sheet membrane waterproofing system consisting of a self-sealing, expandable layer of bentonite laminated to an impermeable, high density polyethylene (HDPE).2) iAuditor reporting- iAuditor is an onsite quality assurance program Tremco conduct for the builder and applicator to ensure our products are being installed correctly and to specification. This gives the builder the confidence that there will be no waterproofing defects within the build.Overall, both the builder and developer were happy with the end result, which provided the warranty and quality required of such a development.
Sponsored
Termimesh - Protecting Historical Landmarks – Norwood Oval Adelaide

Termimesh - Protecting Historical Landmarks – Norwood Oval Adelaide

Termimesh

Termi Home & Commercial (SA) were proud to be a part of the historic Norwood Oval Redevelopment project in Adelaide, South Australia. As one of the most iconic football grounds in Adelaide only a non chemical termite management solution would do. We designed and installed the Termimesh System keeping in mind both the historical significance and the new facilities.The suitability of the Termimesh system for this project is based on its flexibility, which was necessary due to complex external geometry of the new construction and integration with the existing buildings. This presented challenges in performing remedial work. For example the Sir Edwin Smith Grandstand is heritage listed meaning minimal work was allowed to the external façade. This is where the strength of our termite management system lies. It can be customised for each individual project. Our estimating and design team will work alongside the architect, marking up plans and explaining how the system is applied to the design. Which in the case of the Norwood Oval was extremely important. We are on hand during the construction phase to iron out any challenges that may arise ensuring the installation process is simple, smooth and straightforward.Termimesh has maintained our position as market leader in termite protection in the South Australian construction industry for over 25 years, with a strong domestic and commercial portfolio. We are one of few companies that are triple certified to AS48001, ISO9001 and ISO14001 which delivers additional peace of mind for our clients.CONSTRUCTION TEAMSchiavello ConstructionOur team has a good relationship with the lead contractor, Schiavello, having worked on past projects together. They knew our capability and after a detailed review of the construction programme, we were sure we could meet their requirements. As a supporter and sponsor of the Norwood Football Club, Schiavello recognised the significance of the project for the community.  PROJECT DETAILSClient                          City of Norwood, Payneham & St Peters. Specifying Architects                                    Tridente ArchitectsInstallation Year                                              2019Installation Duration                                      7 monthsProject Value                                                    $9 mil TECHNICAL DETAILSInstallation Type                                             NumberService penetrations                                     200Column blockouts                                          7.5 LM                 Cluster penetrations                                     4Control joints                                                   315 LMConstruction joints                                        73 LMSaw cut service penetrations                    147 LMConcrete slab pours                                      NumerousPerimeter                                                          147 LMKey Termimesh Personnel                          Drew Wilson- Account Development ManagerShane Waye, Senior EstimatorAnthony Bennett- Operations Field Manager
Sponsored
Columbia College, USA.

Columbia College, USA.

Boon Edam Australia Pty Ltd

The new Student Center at Columbia College Chicago, located at 754 South Wabash Avenue in Chicago, opened its doors in the fall of 2019. This brand-new building offers five spectacular stories of spaces for students including music and film-screening rooms, dining options, a fitness centre, a reflection room for meditation and prayer, and event spaces for meetings, performances, and receptions. Columbia College Chicago has a closed campus. In order to enter any building on campus students and staff must have a Columbia ID or visitors must have a valid appointment. The main entrance at the Student Centre is the Tourniket manual revolving door that leads to a public foyer that includes a coffee shop and lounge. Since the speed gates are just past the security desk at the boundary of this area, they serve as a visual and physical indicator of where the public area terminates. Next to the Speedlane Open speed gates, which are notable because they do not have any closing barriers, guards watch as people pass through them to ensure that everyone is scanning their IDs and that the IDs are valid, in which case the speed gate shows a green light. In a situation where a red light shows and the gate alarms, the guard will check the person’s credentials and can try to troubleshoot the ID card. “The decision was really about what creates the least barrier to those entering and exiting the building,” said Dutil. “We don't really want our students to feel like they are overly policed or that our buildings are not accessible to them. So the design of the Open speed gates provided the best solution in terms of controlling access without being obtrusive." Swift Passage While Maintaining Accountability Before the Student Center was built, students entering any campus building would just show their ID to the security officer as they walked past. The administration realised that while this does provide some level of security, it is not foolproof – particularly when many people are entering at the same time for a class. The College’s head of security made the suggestion to install a system that would allow for swift passage of authorised people while maintaining accountability around who enters and exits the building. As anticipated, there was a brief learning curve for the students using the new system. “This was the first system like this on our campus,” said Dutil. “And the first few days that the new Centre was open were also the first few days of school. There were a lot of people new to the campus who required a bit of coaching from guards and our student staff in terms of where to place your card, and to not walk through before you place your card.” Coming Out Ahead of Swinging Doors Dutil confirms that the access systems placed at Boon Edam speed gates are actually outperforming those placed at swing doors across the campus for convenience and adoption. Across the campus, there is a card reader at every swing door entrance of a building where you present your card and a light turns red or green. But oftentimes the card reader is missed, or depending on the placement of the lights and placement of the guard, it can be kind of hit or miss with students walking right by it. “But with the Open speed gates, they're very visible and although they're not a total barrier to entry, they are something that's right in front of you. Because it's very noticable and not easily overlooked, the students have learned pretty quickly to get their ID out. In fact, this was meant to be a test run for the campus to ensure it would be viable and worthwhile for other buildings as well.” Advanced Features Add Value and Flexibility The speed gates have delivered additional benefits beyond basic campus security, according to Dutil. “One of the nice things about a system like this is that we can count visitors to the Student Centre because we get the data of everybody that scans in. So on a busy day for us it's about 2500 people throughout the day. That can range depending on what's going on and what time of year it is. On weekends we're very slow, since there are no classes – maybe 900 to 1200.” “We are a rental venue as well, so we have times where the building is open to non-Columbia College Chicago people for events or other functions. There's a really convenient touch panel right at the security desk called the BoonTouch, where the officer can turn off the turnstiles during those times and then attendees can move through freely without any alarms going off at all.” A New Revolving Door Adds Comfort and Peace of Mind Finally, the Tourniket manual revolving door delivers one additional benefit to the Student Centre, located in a city known for harsh weather. “Revolving doors are always preferred at a building like this that gets a lot of traffic going in and out. We have cold, drafty weather that blows right into our main space at that first floor entry. The revolving door helps to keep the building warm and saves energy and utility costs as well,” said Dutil. “Students feel safe and comfortable entering the building at night,” he concludes. “Our building has a lot of nooks and crannies, and someone can end up alone in a space. And so I think knowing that the only people that are in that building are the ones that are supposed to be there is helpful. Overall, our students appreciate the effort to try to keep them safer.”
Sponsored
Dallas Police Department, Dallas Texas, USA

Dallas Police Department, Dallas Texas, USA

Boon Edam Australia Pty Ltd

There is a saying that “Everything is Bigger in Texas,” and the Dallas, Texas police department is no exception. The city of Dallas is ranked in the top 10 cities in the U.S. in terms of population, at 1.2 million people. The Dallas Police Department is the ninth largest municipal police force in the U.S., based on 3,012 sworn officers. It is led by Chief of Police, U. Reneé Hall. Security a Concern When Designing HQ Building The department is located in the Jack Evans Police Headquarters building, which was built in 2003. It is 358,000 square feet, has six floors, is spread over a three-acre site, has a separate 1,200 car parking garage and a two-acre, open parking lot for additional visitor parking. Prior to 2003, the department was housed in the circa 1914 former City Hall Building. The Jack Evans Police Headquarters building was under construction when 9/11 terrorists flew airplanes into the World Trade Buildings in New York. That event was preceded by the Oklahoma City Murrah Federal Building bombing in April 1995. Therefore, security was a concern in its design. Police officials worked with a Police Design Consultant – McClaren, Wilson, and Lawrie Architects of Phoenix – to help design the building to resist a terrorist attack and isolate potential hazards. The building also needed to control visitor traffic and access. On an average month, there are 5,000 public visitors to the Jack Evans building. In addition, shots fired at police buildings nationally are not uncommon, says Paul M. Schuster, Senior Corporal/Facilities Management for the Dallas Police Department. “For the most part they are random, single shot drive-by shootings. Often, the officers are unaware that the building has been shot at, until they find a bullet hole in the brick or glass. Increasingly, police tend to be a symbol of government and some citizens see that as a visible target to lash out at. Police officers are trained to expect the routine types of calls, such as domestic violence, traffic accidents, and other crimes. Yet they must be flexible to anticipate the non-routine that can be dangerous and change in a heartbeat.” An Active Shooter Incident Led to an Increase in Security On June 13, 2015, after midnight, a 35-year-old male placed a duffle bag with a remote-controlled bomb to detonate later between cars in the parking lot of the headquarters building. The suspect then began shooting continuously at the lobby windows. Officers responded to the scene, a vehicle chase began, and the incident ended outside the city. Luckily officers in the lobby took cover and were not injured. Following that incident, the Dallas Police Department conducted a security assessment of the building and also at seven patrol stations throughout the city. The assessment included testing various construction materials for bullet resistance to various types of weapons. Gensler Architects and Guidepost Solutions, LLC developed the solutions and plans. “Yesterday we were concerned about handguns, today we are worried about rifles, and the idea of terrorism is always present with outright attack or bombs,” Schuster notes. “The police officers and police staff only want a place that is safe and where they can do their good work.” Funding of $1.3 million was approved to upgrade the lobbies of the seven patrol stations to withstand rifle rounds, and $1.9 million to improve headquarters lobby security, and to upgrade an aging security system. Turner Construction Company and Convergint Technologies, LLC conducted the renovations and security technology integration. Challenges to the Security Design The headquarter’s lobby was initially designed as a two-story glass-walled structure, with an information desk and public records service windows. Visitors were allowed free entry into the lobby and were only screened in an open area to the side if going to other floors. “The challenge in upgrading lobby security was the two-story lobby entrance glass. “In addition, there were concerns about keeping an ‘open’ and friendly service concept in mind and ensuring that the lobby would not resemble a ‘fortress’,” Schuster notes. Screening Room with Security Revolving Doors to Contain Incidents The solution was to keep the existing exterior unchanged and focus on adding a layer of security once a person enters the lobby. Visitors now enter the headquarters and immediately proceed to a side room where security screening is conducted. A new secondary wall with bullet-rated glass and solid bullet resistant wall materials was constructed inside the lobby to channel visitors to the room. Once inside the screening room, which also has bullet resistant walls, the visitor has belongings x-rayed, and they walk through a metal detector. In the event that anyone was to produce a gun and begin shooting, the incident could be contained inside that room. Once a visitor has been cleared, they proceed into the main lobby via a Boon Edam Tourlock 180 security revolving door. This automatic, four-wing door is the most advanced, security revolving door in the Boon Edam product range that offers maximum throughput, allowing users to enter and leave the building simultaneously. In the event that a large number of persons try to force their way into the facility, the Tourlock 180+90 will determine that more than one person is trying to enter and will reject the person and lock out any others from entering. Once a visitor is ready to leave the lobby and exit the building, they pass through another Boon Edam Tourlock 180+90 that leads to a vestibule with exterior swinging doors. In the event that someone tries to go back into the lobby from the front vestibule area, without going through the security screening room, the Tourlock security revolving door will reject their entry.

Showing 1-27 of 27

Feedback