NBS Source
I'm a manufacturer

"fibre reinforcement for concrete"

398 results found

Sort by:

Showing 37-41 of 41

Sponsored
Colour by Design - Siblings Restaurant

Colour by Design - Siblings Restaurant

ECOTONE

CollaborationArchitect: Space Cubed DesignBuilder: Zero 9 ConstructionsMaterial & ApplicationOur ECOTONE team created and applied a white colour finish using ECOTONE Matt to the grey brick moulded precast concrete. The surface was then protected and sealed with ECOCLEAN Clean and Protect Shield to provide a gloss finish which would also be easy to clean and provide antimould, anti-bacterial and antiviral benefits.OutcomeThe architect had included a gloss white brick to the interior colour scheme however supply became an issue. ECOTONE was asked to step in and collaborate with the design team to deliver a durable gloss white colour finish while maintaining a grey mortar realistic effect. A truly stunning and sustainable Colour by Design!TestimonialThe ECOTONE team were very professional to deal with from the start of the process. The guys on site were friendly, professional and did a very neat job. The product itself is amazing, we applied the clear sealer on top of the white ECOTONE stain to the bricks, nothing sticks to it and it is very easy to clean.Adam Fisher, Zero 9 Constructions
Sponsored
Macquarie University Car Park Turf Cell

Macquarie University Car Park Turf Cell

Atlantis

APPLICATION: 52mm Turf CellPROJECT LOCATION: North Ryde NSWPROJECT DETAILS: Macquarie University Permeable Overflow Car ParkPROJECT COMPLETION: March 2017Established in 1964, Macquarie University began as a bold experiment in higher education. Built to break from traditions: to be distinctive, progressive, and to be transformational. Today its pioneering history continues to be a source of inspiration as they celebrate their place among the best and brightest minds.When Macquarie University’s existing cark park became too small for the amount of cars now using it, it was decided to construct an overflow car park. However, not just any car park, but in keeping with their innovative thinking, an environmentally friendly permeable car park. Of course the Atlantis® Turf CellTM system was chosen, so that turf covered parking spaces could be provided.The project required 9,843sq. m of Atlantis® Turf CellTM system, which is constructed from 480mm x 260mm x 52mm panels and has a rigid interlocking clipping system and is made from high quality recycled polypropylene. The project was undertaken by J & G Excavations and Asphalting (NSW) Pty Ltd.The Turf CellTM cells were laid on a bed of permeable soil, and filled with sandy soil and turf was then placed on top of the linked Atlantis® Turf CellTM cells and rolled with a heavy roller to press the roots into the soil in the cells, where they were protected from compaction and could grow freely both horizontally and vertically.The Turf CellTM system is another Atlantis invention, and is specifically suited for car parks, access roads, aircraft taxiways and helicopter landing pads as it has the following features:a high load bearing of approximately 4000t/sq. M;protects the root system of grass from compaction, while allow for vigorous horizontal and vertical root growth;permits surface water absorption and infiltration;has a long use life; andaesthetically, the system allows the grass to fill in completely, creating a lush lawn with an invisible reinforcement structure.
Sponsored
Government Building Parramatta

Government Building Parramatta

Tremco

Challenge750m2 roof with a large quantity of vents, air conditioning units and other equipment on the roof. Add to this problem damaged aging torch membrane, combined with Governments regulations regarding solar absorption and reflectivity of the building posed a real challenge for the applicator when determining a solution for the job.A second challenge for this job is the location of the building was located in the built up CBD of Parramatta with neighbours in close proximity, which meant the solution needed to be neighbourhood friendly.SolutionGiven the complexity of solution required for such a job AlphaGuard BIO is the only product which ticks all the boxes. AlphaGuard BIO is an extremely high performing composite waterproofing system, designed with a focus on roofing restoration. Due to AlphaGuard BIO being a liquid, it makes it ideal for jobs where there are machinery on the roof which needs to be worked around.AlphaGuard BIO has the ability to be installed over various existing roofing membranes in order to minimise tenant disruption and extend the life of the roof for an additional 20 years.It cures to form a durable rubber membrane surface that provides a lasting and easy-to clean waterproof coating. AlphaGuard BIO may be used to apply a seamless, monolithic waterproof membrane to concrete, primed metal, or existing roofing membrane surfaces.AlphaGuard BIO’s low VOC will minimise offensive odours to current tenants and applicators. The white top coat provides high solar reflectance, reducing the building’s operation costs and complying with Section J1.3(b) of the 2019 NCC.
Sponsored
Burj Khalifa

Burj Khalifa

Boon Edam Australia Pty Ltd

The Burj Khalifa – formerly the Burj Dubai – is a legendary building that can only be described in superlatives. At 828 metres high, it is the tallest building in the world. The Burj Khalifa has 160 floors, more than any building in the world. The building also has the highest floor, the highest façade made of aluminium and glass, the highest nightclub and the highest restaurant, the highest service lift and the lift with the longest travel distance. Finally, the building has the highest positioned revolving doors ever installed in a façade worldwide. In less than 30 years, Dubai has become the leading city in the Middle East and is known for its architectural and technical excellence. The Burj Khalifa has become the symbol of this progress. The Burj Khalifa also takes the title of the highest structure in the world back to the Middle East; the Great Pyramid of Giza used to hold the title 4 millennia ago. International Collaboration The tower was designed by architectural firm Skidmore, Owings & Merril, known for their designs for the Willis Tower (formerly the Sears Tower) and the new One World Trade Center in New York. The three-pronged design is based on the spider lily desert flower and consists of three elements around a central core, with the elements spiralling upwards. It can rightly be called an international project: the construction team consisted of Samsung Engineering & Construction employees from South Korea in collaboration with Besix from Belgium and Arabtec from the United Arab Emirates. The UK consultancy Hyder Consulting was responsible for overseeing construction of the building. In total, companies from more than 30 different countries contributed to the construction of the Burj Khalifa. A Windy Challenge The wind is quite a challenge when building a skyscraper of this size. Without additional measures, the top of the building would move so much from side to side due to the wind that people would become seasick. Dubai is also regularly tested by the shamals: sandstorms that can last for days. As the outer façade of the Burj Khalifa contains an enormous amount of glass, these weather conditions presented a considerable challenge. The three-part design proved to be the solution because the spiral floors break the wind currents around the building, resulting in a stable structure. The World's Highest Revolving Doors Skidmore, Owings & Merril's design includes an observation platform on the 124th floor of the building. Two glass revolving doors provide access to this room. At 442 metres above the ground, these are the highest positioned revolving doors ever installed in the façade of a building. The revolving doors must also be able to withstand an extremely high wind load of at least 3000 Pascal, which corresponds to an F3 class tornado. The Burj Khalifa required two automatic revolving doors with a diameter of 3,000 mm and a total height of 2,700 mm; the cover could only be 300 mm high with the motor installed. Generally speaking, a revolving door with these specifications would only be able to withstand wind loads of up to 689 Pascal. It was clear, then, that not every revolving door manufacturer could supply an entrance that met these requirements. Challenge Accepted Koninklijke Boon Edam was one of only two companies invited to devise a system for this challenge. There were two main problems that had to be solved: the round sides of the revolving door had to be strong enough to resist the wind, and the door set had to be properly fixed so the door wings could not be blown off during a storm. Boon Edam worked closely with Mace, the Hyder Consulting Group, Samsung Engineering and Construction and Turner Construction, the subcontractor, to develop a system that met all these requirements. During the first phase of the process, the second company invited to tender had to give up because their design did not meet the challenging conditions on the 124th floor. Boon Edam persisted in its efforts, and after conducting various wind load and glass tests, it became possible to adapt the construction of the Tourniket to the requirements of the Burj Dubai. A Tornado-Proof Revolving Door at the Burj Khalifa Our proposal for the Burj Khalifa consisted of a Tourniket with specially reinforced door frames twice the width and thickness of a normal revolving door. These were securely anchored with special bolts under the floor to guarantee the structure's rigidity. Although most revolving doors are installed on the top of the subfloor, this door was installed under the top finish layer of the concrete floor. To guarantee the stability of the door set, an extra-thick steel frame was added to the structure. This allows the door wings to easily withstand the wind pressure. Expansion on the 148th Floor in 2014 Boon Edam installed the same specially designed Tourniket revolving door on the 148th floor as on the 124th floor. However, the new project brought an extra challenge: transporting all of the materials from the basement of the building to the 148th floor. First, the materials had to be transported in one lift to the 111th floor. They were then transferred to a second lift, from where everything had to be moved manually from the 149th floor to the 148th floor, to the door's location. Special Projects Based on Standard Solutions The revolving doors we created for the Burj Khalifa were an extreme challenge. The experience and expertise of our technicians combined with the tried and tested technology of the Tourniket enabled us to develop a successful solution. Both revolving doors are now used daily and give visitors a spectacular view of Dubai. The glass design beautifully complements the modern façade of the observation platform and puts Dubai's beautiful skyline in the spotlight.
Sponsored
Termimesh - Protecting Historical Landmarks – Norwood Oval Adelaide

Termimesh - Protecting Historical Landmarks – Norwood Oval Adelaide

Termimesh

Termi Home & Commercial (SA) were proud to be a part of the historic Norwood Oval Redevelopment project in Adelaide, South Australia. As one of the most iconic football grounds in Adelaide only a non chemical termite management solution would do. We designed and installed the Termimesh System keeping in mind both the historical significance and the new facilities.The suitability of the Termimesh system for this project is based on its flexibility, which was necessary due to complex external geometry of the new construction and integration with the existing buildings. This presented challenges in performing remedial work. For example the Sir Edwin Smith Grandstand is heritage listed meaning minimal work was allowed to the external façade. This is where the strength of our termite management system lies. It can be customised for each individual project. Our estimating and design team will work alongside the architect, marking up plans and explaining how the system is applied to the design. Which in the case of the Norwood Oval was extremely important. We are on hand during the construction phase to iron out any challenges that may arise ensuring the installation process is simple, smooth and straightforward.Termimesh has maintained our position as market leader in termite protection in the South Australian construction industry for over 25 years, with a strong domestic and commercial portfolio. We are one of few companies that are triple certified to AS48001, ISO9001 and ISO14001 which delivers additional peace of mind for our clients.CONSTRUCTION TEAMSchiavello ConstructionOur team has a good relationship with the lead contractor, Schiavello, having worked on past projects together. They knew our capability and after a detailed review of the construction programme, we were sure we could meet their requirements. As a supporter and sponsor of the Norwood Football Club, Schiavello recognised the significance of the project for the community.  PROJECT DETAILSClient                          City of Norwood, Payneham & St Peters. Specifying Architects                                    Tridente ArchitectsInstallation Year                                              2019Installation Duration                                      7 monthsProject Value                                                    $9 mil TECHNICAL DETAILSInstallation Type                                             NumberService penetrations                                     200Column blockouts                                          7.5 LM                 Cluster penetrations                                     4Control joints                                                   315 LMConstruction joints                                        73 LMSaw cut service penetrations                    147 LMConcrete slab pours                                      NumerousPerimeter                                                          147 LMKey Termimesh Personnel                          Drew Wilson- Account Development ManagerShane Waye, Senior EstimatorAnthony Bennett- Operations Field Manager

Showing 37-41 of 41

Feedback