NBS Source
I'm a manufacturer

"cement board"

122 results found

Sort by:

Showing 1-10 of 10

Sponsored
Oracle Apartments, WA

Oracle Apartments, WA

Rondo Building Services Pty Ltd

Rondo worked closely with C&L Ceilings who were charged with the wall and ceiling contract. In order to be sure that the building’s external facade would remain structurally secure and adhere to the architectural detail, C&L installed Fibrous Cement Sheets, supported by heavy gauge Rondo components.
Sponsored
Summit Apartments, QLD

Summit Apartments, QLD

Baxta Industries Pty. Ltd.

The developers were looking for an elegant, cleaner, sophisticated look complimented by the movement of the ocean across the road. In addition to this, eye catching colours brought to life through unique systems. Baxta cement renders are being delivered and applied to this ultimate coastal sanctuary featuring a unique design enhanced by the use of the beautiful Baxta render and elastomeric finishes.
Sponsored
Hyatt Regency Sydney, NSW - Equitone

Hyatt Regency Sydney, NSW - Equitone

Fairview Architectural

The 5-star Hyatt Regency Sydney on the fringe of Darling Habour, formerly Four Points by Sheraton, underwent a vast redevelopment which included refurbishment of the hotel and construction of a new convention space and 25 level tower. Adorning the recognisable covered facade is Equitone Tectiva, a through-coloured fibre cement cladding, which was installed by Stane Industries. Architect: Cox Architecture
Sponsored
Colour by Design - Macarthur Anglican School

Colour by Design - Macarthur Anglican School

ECOTONE

Collaboration Architect: Mayoh ArchitectsBuilder: Reitsma ConstructionsDeveloper: Macarthur Anglican SchoolMaterial & ApplicationUsing our CXD process in collaboration with the design team, our ECOTONE team created a specialised wood grain colour finish using ECOTONE Matt Plus and ECOTONE Sharp. The surface colour finish was applied onsite to the grey compressed fibre cement cladding soffits to match in with the internal timber used in the project.OutcomeThe design required a space that was inviting and inspiring to students allowing them to remain in touch with the outside as well as being environmentally friendly. Our long-life ECOTONE finish to cladding replicating natural wood delivered in both design and sustainability. This project also went on to win a commendation award for Learning Environments Australasia Category 2: New Construction / New Individual Facility (or Facilities) Over $8m.TestimonialThe challenge of incorporating feature timber soffits within a bushfire zone was solved by the use of ECOTONE over non-combustible fibre cement sheeting. The soffits were colour matched to the natural spotted gum timber, which was used internally, resulting in a seamless visual appearance and an external soffit that is almost indistinguishable from real timberJonathan Henley, Mayoh Architects
Sponsored
Colour by Design - Gray Community Hall

Colour by Design - Gray Community Hall

ECOTONE

Collaboration Architect: Rossi ArchitectsBuilder: M+J BuildersMaterial & ApplicationOur ECOTONE Matt and ECOTONE Sharp were applied onsite to the compressed fibre cement (CFC) soffit cladding to bring about a natural timber look aestheticOutcomeWe love our Gol Duhn with black shadow line edge finish on these soffits. It has been a pleasure to collaborate on this community hall to deliver a truly stunning space for local gatherings.
Sponsored
St Mark's Catholic College

St Mark's Catholic College

ECOCLEAN

COLLABORATIONArchitect: Morson GroupBuilder: Reitsma ConstructionsBRIEFApplication to the coloured precast concrete and compressed fibre cement sheeting of the newly built auditorium.MATERIAL & APPLICATIONECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOUTCOMEThe ECOCLEAN team was engaged to find solutions that would protect the appearance of the facades of the St Mark’s Catholic College auditorium which included easy graffiti removal. The award-winning project is protected by our long-lasting functional coatings for years to come.
Sponsored
Shangri-la Hotel, Mumbai

Shangri-la Hotel, Mumbai

Rondo Building Services Pty Ltd

Rondo’s Technical Team supplied emblematic CAD floor plans and designs for wall types including acoustic and fire rating to board to the manufacturer’s specifications. Onsite support from Rondo included assistance in setting out, framing, lining and finishing training as well material supply coordination.
Sponsored
Ready to Set Sail at the Brisbane International Cruise Terminal

Ready to Set Sail at the Brisbane International Cruise Terminal

Flowcrete

The brand new state-of-the-art $177 million Brisbane International Cruise Terminal was completed in mid-2020 and will serve as a gateway for the Queensland tourismsector. The 9,300m² terminal was designed by Arkhefield in collaboration with Arup will provide visitors with a world class experience.The public spaces including the internal walkways, communal areas and departure lounge featured 1,500m² of Flowcoat Terrosso in four bespoke colour combinations.The decorative resin-based flooring system was chosen to provide a decorative, seamless flooring system that would not only create a luxurious and welcome environment, but withstand the expected foot traffic.A further 1,200m² of Deckshield ID was applied to the foot bridge, providing passengers with a slip resistant and safe surface as they board or disembark some of the biggest cruise ships in the world.Tremco CPG Australia’s portfolio of industry leading products provided not just a flooring solution for the world-glass tourism facility. In addition to the Flowcreteflooring systems, Tremco CPG Australia also provided the structural glazing silicone Proglaze II to a total of 218 glass panels.
Sponsored
Mother Teresa Catholic College, WA

Mother Teresa Catholic College, WA

Termimesh

Mother Teresa Catholic College, WALocation – Baldivis, Perth, Western Australia      Installation Duration - 3 monthsInstallation Year – 2019                             Project Value - $15-20 millionSpecifying Architects – Parry and Rosenthal Architects TECHNICAL DETAILInstallation Type                                             NumberService penetrations                                     150Cluster penetrations                                      11Control joints                                                   700 LMConcrete slab pours                                       Grid pattern - numerousPerimeter                                                           500 LM  BACKGROUNDMother Teresa Catholic College is a progressive co- educational facility in the fast-growing suburb of Baldivis, 60 kilometres south of Perth in the City of Rockingham.The school opened in 2013 and in 2018/19 a Stage 3 Capital Development Program called for the construction of junior-secondary class-rooms and associated facilities, playing fields, courts, grounds, and extended parking. REQUIREMENTThe College’s ongoing plans for facility enhancements represents a significant investment and is worth protecting with the most effective pre-construction termite management system.The College caters for students from pre-kindergarten to Year 12. Chemical termite controls were not an option because of toxicity issues, making a clean and environmentally safe physical termite barrier the correct solution.APPROACHA typical WA site, the college’s location is predominantly flat, with sandy soils and substrates. In general, this type of environment poses a high risk for termite attack common to this region of Western Australia. SOLUTIONThe main challenge with the installation came from the rammed earth exterior walls. Their natural composition can chip easily, so nailing or sealing the termite barrier onto the wall was not practical.Our solution was to install Termimesh cold joint /paver trays to the perimeter of the concrete slab edge. These protected the concealed entry point between the slab and wall. They also engaged into the external pavement instead of against the rammed earth wall itself.BENEFITSThe Termimesh System which comprises of our 725 grade stainless steel mesh, Termiparge bonding cement and high grade stainless steel clamps not only met their strict requirement of no chemicals it will also continue to provide them with reassurance and peace of mind the comes with our market leading Pledge Guarantee. The Pledge Guarantee provides the client with a 10 year guarantee that requires no annual inspections during that initial period. The client then has the option to extend this on an ongoing basis by having an approved annual inspection.
Sponsored
The Icon - St Kilda

The Icon - St Kilda

Interpon Powder Coatings

A bold and significant new development has emerged in St Kilda as a ‘liveable Lego tower’, rising in tiered rainbow cubes that appear to balance like building blocks. Aptly named The Icon, the distinctive new building is wrapped in expanded aluminium mesh that changes colour as sunlight moves.The inspiration of artist Matthew Johnson, who worked with Jackson Clements Burrows Architects to conceptualise the distinctive complex, was achieved with Interpon Powder Coating on board as a collaborative partner.“My vision for the project was for people look up and see something interesting, to see something that is in a sense iconographic – as a marker or reference point,” explains Matthew.Interpon were involved with the project “right from the start”, explains Gareth Connell, Regional Specification, Interpon. Their association began after they were introduced to Pace Developments to discuss colour and product selection for the external façade.“We work closely with Interpon, and Pace asked us to quote with the product already powder coated,” says Ian Dunstan, southern regional sales manager at Locker Group, who manufacture perforated and expanded metal. Interpon were able to step in and develop the colour range separately, to meet the design brief and provide an ultra-durable coating system that meet the expectations of all parties.“The team at Interpon were very accommodating, engaged and professional in taking the concept on board,” says Matthew. “We were able to manifest unique colours based on the ratios I created with their chemist, inventing a whole new series of colours. This was crucial, as each level is depicted in different colour hue variations from earth to sky, which cross reference the nature of the geographical and environmental stratums. This flux of seasonal change is portrayed through subtle tonal gradation. Working with Interpon was a very fluid operation.”Interpon has collaborated on several high profile property developments and high rises over the years – although perhaps none quite as unique or with as many distinct characteristics as The Icon. “The nature of expanded aluminium mesh is such that it is formed by shearing and expanding aluminium sheet to create the ‘3D form’ effect. A visually appealing system for a façade, the shearing of the metal can present issues with very sharp edges, particularly in aggressive coastal environments,” Gareth explains.“Part of understanding this project was to comprehend as many elements as possible. Given the location was in St Kilda, with the bay just over 1.5km away, environmental considerations such as UV degradation, exposure to corrosive sea salts and prevailing winds needed to be considered.”After reviewing available data, such as Bureau of Meteorology weather patterns and local geography and topography maps, a specific duplex or two-layer powder finishing system was specified.“This consisted of a controlled preparation process for the expanded aluminium sheets. An epoxy barrier primer (was specified) to provide enhanced protection and to build the sharp edges in order to minimise issues associated with filiform corrosion. And the ultra-durability polyester powder top coat was developed in 34 distinct colours,” Gareth says.After the colour range was developed, it was applied by powder coating specialists Mansutti Bros. Lead by managing director Claude Mansutti, the team refinished hundreds of mesh panels over a period of nine months.“It was a major benefit to be using powder coating because, unlike liquid paints, powder is cured once it comes out of the oven and it’s ready to go once it’s cooled down. If they were painted, the drying phase could delay the process from refinish to installation by up to two weeks. It meant we were able to keep to a very strict schedule,” Claude says.“The project involved a lot of large spreadsheet work. There were 17 floors and over 30 colours, with panels in 15 sizes; it was quite a matrix to work with. But the end result is so different and so unique. It’s an interesting design and I’m sure it’s going to be a talking point for the area for many years.”

Showing 1-10 of 10

Feedback