NBS Source
I'm a manufacturer

"artificial grass"

27 results found

Sort by:

Showing 1-6 of 6

Sponsored
Permeable Car & Trailer Park

Permeable Car & Trailer Park

Atlantis

Snapper Creek Car Park was developed as an environmentally friendly permeable car park. As such the Atlantis® Turf CellTM and Atlantis® Gravel CellTM systems were chosen, to provide gravel driveways and grass parking areas, thus preventing compaction of the soil and to protect the grass and to stabilize the gravel and provide a permeable car park.The parking areas were divided into car only parking and car & trailer parking.The area, consisting of natural sandy material, was excavated to a depth of 300mm, and a tensar grid was placed into the excavation and the excavated material placed back on top of the tensar grid and compacted.A layer of 100mm of gravel was then place on the areas where the Atlantis® Gravel CellTM modules were to be used and the Atlantis® Gravel cellTM modules positioned thereon and filled with gravel.The Atlantis® Turf CellTM modules were installed and filled with soil and then the area was grass seeded; no turf was used. The project was completed in mid 2014 and was at that stage semi grassed and in use.The project required 4,300sq. m of Atlantis® 52mm drainage cell, which are 480mm x 260mm x 52mm panels and have a rigid interlocking clipping system and are made from recycled polypropylene.In August 2017, the operators of the car park, which is still operating, were contacted and they stated that they were extremely happy with the condition of the car park, even though it has heavy traffic as there is a boat ramp there, and some areas have been flooded by Snapper Creek.The Atlantis® Turf CellTM & Atlantis® Gravel CellTM systems are specifically suited for car parks, access roads, aircraft taxiways and helicopter landing pads as it has the following features:a high load bearing of approximately 4000t/sq. M;protects the root system from compaction, while allow for vigorous horizontal and vertical root growth;permits surface water absorption and infiltration; andhave a long use life.
Sponsored
Meriton

Meriton

Evergreen Walls

Meriton is a long standing client of Evergreen Walls and we are their trusted provider of any artificial greenery needs that arise. In this particular fitout we installed a green wall as a feature piece in Meriton's Pagewood Green lobby with mirrors and timber panels atop the foliage in an impressive sprawling pattern.
Sponsored
Greenery Installation at BAI Communications For Cachet Group

Greenery Installation at BAI Communications For Cachet Group

Evergreen Walls

We had the pleasure of working alongside Cachet Group to install our artificial greenery into the newly-designed office space of BAI Communications and the results were stunning! We used a combination of different hanging bushes and vines, which were offset beautifully against the modern, crisp white interiors of the space.
Sponsored
Macquarie University Car Park Turf Cell

Macquarie University Car Park Turf Cell

Atlantis

APPLICATION: 52mm Turf CellPROJECT LOCATION: North Ryde NSWPROJECT DETAILS: Macquarie University Permeable Overflow Car ParkPROJECT COMPLETION: March 2017Established in 1964, Macquarie University began as a bold experiment in higher education. Built to break from traditions: to be distinctive, progressive, and to be transformational. Today its pioneering history continues to be a source of inspiration as they celebrate their place among the best and brightest minds.When Macquarie University’s existing cark park became too small for the amount of cars now using it, it was decided to construct an overflow car park. However, not just any car park, but in keeping with their innovative thinking, an environmentally friendly permeable car park. Of course the Atlantis® Turf CellTM system was chosen, so that turf covered parking spaces could be provided.The project required 9,843sq. m of Atlantis® Turf CellTM system, which is constructed from 480mm x 260mm x 52mm panels and has a rigid interlocking clipping system and is made from high quality recycled polypropylene. The project was undertaken by J & G Excavations and Asphalting (NSW) Pty Ltd.The Turf CellTM cells were laid on a bed of permeable soil, and filled with sandy soil and turf was then placed on top of the linked Atlantis® Turf CellTM cells and rolled with a heavy roller to press the roots into the soil in the cells, where they were protected from compaction and could grow freely both horizontally and vertically.The Turf CellTM system is another Atlantis invention, and is specifically suited for car parks, access roads, aircraft taxiways and helicopter landing pads as it has the following features:a high load bearing of approximately 4000t/sq. M;protects the root system of grass from compaction, while allow for vigorous horizontal and vertical root growth;permits surface water absorption and infiltration;has a long use life; andaesthetically, the system allows the grass to fill in completely, creating a lush lawn with an invisible reinforcement structure.
Sponsored
Rainwater harvesting for a government facility

Rainwater harvesting for a government facility

Atlantis

Project Location: Amberley, Queensland, AUSTRALIA.In Amberley is one of the largest base facilities in Australia. The redevelopment works are valued at AU$331.5 million. New construction and refurbishment works to be undertaken include newliving-in accommodation, maintenance facilities, storage, working and training accommodation, a combined mess and a new physical fitness centre.The site is owned by an Australian Government Department. The Atlantis® Turf Cell® was supplied by Atlantis and was installed by Kennedy Projects Group in April 2009. The system is located at the playing fields on the south-western corner of Gannet St and Rosewood Road, Amberley, QLD.A vegetated swale surrounds the playing field. The swale is an open, shallow channel designed to slow runoff, filter it, and promote infiltration into the ground. Excess water moving through the soil profile is captured by Atlantis® Matrix® Tank – Single modules. The use of a swale to collected water results in smaller runoff volumes, lower peak discharge rates and cleaner runoff. The vegetation in swales, usually thick grass, helps to trap pollutants such as suspended solids and trace metals. The Atlantis Matrix modules extend 3m (10ft) wide under the swale for 110m (360ft).Water collected by the swale is collected in a stormwater harvesting tank located adjacent to the north-western corner of the playing field. Perforated corrugated plastic pipes used as subsurface drainage pipes extend for 1560m (5110ft) is also collected by the stormwater harvesting tank.The stormwater harvesting tank is located subsurface and is constructed of a heavy duty low density polyethylene liner and non woven geotextile surrounding Atlantis® Matrix® Tank - Double modules. The Atlantis stormwater tank has a 4,100m3 (144,80 ft3) capacity. Water collected by the swale and stormwater tank system is used for irrigation of the sports field.The Atlantis stormwater tank has eight (8) cleanout / inspection ports placed through the systems. A 1200mm (4ft) dia. wet well with bolt down lids has been installed adjacent to the tank serves as a pump out pit. The overflow from the tank has a 15m (50ft) long x 400mm (1.3ft) deep spill way with scour protection into an adjacent creek.
Sponsored
Versatile 52mm Drainage Cell

Versatile 52mm Drainage Cell

Atlantis

The 52mm drainage cell has been used as normally in two guises. Firstly as a TurfcellTM grass reinforcement such as at Natural Designer Homes , a display home in Casuarina NSW. The photograph of the driveway is from about 1year ago, some 4 years from installation. As there are several cars in the family as well as work trucks the installation looks quite good.Secondly as a Gravel cellTM gravel retainer, such as that used at Leaf and Limb Nursery in Kin Kin Qld., where they use the 52mm cell in the walkways as this makes it easier for them to run the trolley through the gravel.However there is a third use for the 52mm drainage cell. That is as walk ways in mining camps. Traymark Industrial Caravans make the vans for accommodation for the workers and Atlantis® 52mm cells are supplied with each van to be used as a walk way to keep workers out of the mud and dirt when at their accommodation..Secondly as a Gravel cellTM gravel retainer, such as that used at Leaf and Limb Nursery in Kin Kin Qld., where they use the 52mm cell in the walkways as this makes it easier for them to run the trolley through the gravel.Now for another use: a client already was successfully using our 52mm drainage cell as reinforcement for parking bays beside a river and in August 2011, it occurred to him that he could extend the parking area into a boat ramp. Our 52mm drainage cell is made from recycled polypropylene with U. V. protection, in sheets being 480mm x 260mm x 52mm.Two tracks, being 0.96m in width were connected to the 52mm drainage cell in the parking area and also were secured by metal hook pegs to the drainage cell of the parking area. The tracks lead to a full width ramp (2.88m in width) into the water.To prevent the ramp from sinking fully into the silt, the ramp and adjacent section of the two tracks are formed by two layers of 52mm drainage cell connected to each other by cable ties. Metal hook pegs were also used to assist in holding the ramp in position.We contacted our client in August 2017 and he is very happy with the boat ramp which is still in use despite several floods, and constant exposure to the elements.Thus the high load bearing of approximately 4000t/sq. M and the long useful life of the 52mm drainage cell has permitted the 52mm drainage cell to be used and still being used in many ways.

Showing 1-6 of 6

Feedback