NBS Source
I'm a manufacturer

"密苏里州身份证ID卡驾驶证哪里可以办【📞Whatsapp✈️Telegram: 852 6312 0748】.{随机字符1-8}💯72169"

432 results found

Sort by:

Showing 1-23 of 23

Sponsored
West Side Place - Stage 1, Towers 1 & 2

West Side Place - Stage 1, Towers 1 & 2

Bostik Australia Pty Ltd

At Bostik, innovation comes in many forms.Ultraset® 3 in 1 is Bostik Australia's premium timber floor adhesive incorporating Thickness Control™ Spacer Technology, a proprietary feature consisting of recycled, ground-up car tyres mixed throughout the adhesive.When applied, the Thickness Control™ Spacers act like tiny rubber pillars, suspending the timber and maintaining optimal adhesive thickness to ensure superior performance as a moisture and impact sound reduction membrane.For West Side Place, Ultraset® 3 in 1 presented significant time and cost savings vs conventional multi-layer acoustic systems by eliminating the need to install a separate moisture barrier, acoustic underlay and additional layers of adhesive. Efficiencies that flowed directly onto the construction team, supporting trades and ultimately the developer, delivering a high performance solution within budget, ahead of schedule all the while guaranteeing a compliant and comfortable environment.
Sponsored
1 Bligh Street, Sydney, NSW

1 Bligh Street, Sydney, NSW

Caroma

GWA Bathroom & Kitchens worked collaboratively with Architectus and Grocon to supply a full schedule of fittings, including reduced flow tapware and water saving toilet suites. This installation, together with the building’s innovative recycling technology, is saving approximately 100,000 litres of water per day, helping 1 Bligh meet its 6 Green Star rating - the highest Green Star rating for a commercial development across NSW.
Sponsored
No.1 Collins Wharf, VIC

No.1 Collins Wharf, VIC

Rondo Building Services Pty Ltd

No 1. Collins Wharf is the latest part of the $1.2 billion development of the Victoria Harbour precinct. The 29-level apartment complex, built by Lend Lease and designed by Architectural firm, Bates Smart was completed in September this year and boasts 321 water-lined apartments and townhouses. Expoconti were awarded the wall and ceiling contract for the $106M development and soon after contacted Rondo to supply systems for the external walls, external cladding and internal suspended ceiling system.
Sponsored
Brisbane 1, South Brisbane, QLD

Brisbane 1, South Brisbane, QLD

Alspec

The striking glass facades of this new residential development are making their mark on the South Brisbane skyline.
Sponsored
Mungo Scott Flour Mill - Stage 1, Summer Hill NSW

Mungo Scott Flour Mill - Stage 1, Summer Hill NSW

Alspec

Former iconic grain silos transformed into residential apartments using Alspec's window and door framing products.
Sponsored
Kings Square - Tower 1, WA

Kings Square - Tower 1, WA

Rondo Building Services Pty Ltd

Rondo worked closely with Bravo Ceiling Industries on this project to provide engineering designs for high pressure areas within the building. A thorough assessment was completed to ascertain which Rondo products would achieve the best outcome.
Sponsored
Bike Lockers for St. Leonards Square

Bike Lockers for St. Leonards Square

Cora Bike Rack

As one of Mirvac’s signature developments, St. Leonards Square exemplifies sophisticated living in Sydney - including the exceptional amenities residents have come to expect. As part of this project, Cora Bike Rack was consulted to ensure the industry’s best bicycle facilities would be provided to future residents. The CBL bicycle locker range includes heavy duty models for use in outdoor public areas, and cost efficient light duty models for use in secure indoor areas such as residential and commercial towers.
Sponsored
Columbia College, USA.

Columbia College, USA.

Boon Edam Australia Pty Ltd

The new Student Center at Columbia College Chicago, located at 754 South Wabash Avenue in Chicago, opened its doors in the fall of 2019. This brand-new building offers five spectacular stories of spaces for students including music and film-screening rooms, dining options, a fitness centre, a reflection room for meditation and prayer, and event spaces for meetings, performances, and receptions. Columbia College Chicago has a closed campus. In order to enter any building on campus students and staff must have a Columbia ID or visitors must have a valid appointment. The main entrance at the Student Centre is the Tourniket manual revolving door that leads to a public foyer that includes a coffee shop and lounge. Since the speed gates are just past the security desk at the boundary of this area, they serve as a visual and physical indicator of where the public area terminates. Next to the Speedlane Open speed gates, which are notable because they do not have any closing barriers, guards watch as people pass through them to ensure that everyone is scanning their IDs and that the IDs are valid, in which case the speed gate shows a green light. In a situation where a red light shows and the gate alarms, the guard will check the person’s credentials and can try to troubleshoot the ID card. “The decision was really about what creates the least barrier to those entering and exiting the building,” said Dutil. “We don't really want our students to feel like they are overly policed or that our buildings are not accessible to them. So the design of the Open speed gates provided the best solution in terms of controlling access without being obtrusive." Swift Passage While Maintaining Accountability Before the Student Center was built, students entering any campus building would just show their ID to the security officer as they walked past. The administration realised that while this does provide some level of security, it is not foolproof – particularly when many people are entering at the same time for a class. The College’s head of security made the suggestion to install a system that would allow for swift passage of authorised people while maintaining accountability around who enters and exits the building. As anticipated, there was a brief learning curve for the students using the new system. “This was the first system like this on our campus,” said Dutil. “And the first few days that the new Centre was open were also the first few days of school. There were a lot of people new to the campus who required a bit of coaching from guards and our student staff in terms of where to place your card, and to not walk through before you place your card.” Coming Out Ahead of Swinging Doors Dutil confirms that the access systems placed at Boon Edam speed gates are actually outperforming those placed at swing doors across the campus for convenience and adoption. Across the campus, there is a card reader at every swing door entrance of a building where you present your card and a light turns red or green. But oftentimes the card reader is missed, or depending on the placement of the lights and placement of the guard, it can be kind of hit or miss with students walking right by it. “But with the Open speed gates, they're very visible and although they're not a total barrier to entry, they are something that's right in front of you. Because it's very noticable and not easily overlooked, the students have learned pretty quickly to get their ID out. In fact, this was meant to be a test run for the campus to ensure it would be viable and worthwhile for other buildings as well.” Advanced Features Add Value and Flexibility The speed gates have delivered additional benefits beyond basic campus security, according to Dutil. “One of the nice things about a system like this is that we can count visitors to the Student Centre because we get the data of everybody that scans in. So on a busy day for us it's about 2500 people throughout the day. That can range depending on what's going on and what time of year it is. On weekends we're very slow, since there are no classes – maybe 900 to 1200.” “We are a rental venue as well, so we have times where the building is open to non-Columbia College Chicago people for events or other functions. There's a really convenient touch panel right at the security desk called the BoonTouch, where the officer can turn off the turnstiles during those times and then attendees can move through freely without any alarms going off at all.” A New Revolving Door Adds Comfort and Peace of Mind Finally, the Tourniket manual revolving door delivers one additional benefit to the Student Centre, located in a city known for harsh weather. “Revolving doors are always preferred at a building like this that gets a lot of traffic going in and out. We have cold, drafty weather that blows right into our main space at that first floor entry. The revolving door helps to keep the building warm and saves energy and utility costs as well,” said Dutil. “Students feel safe and comfortable entering the building at night,” he concludes. “Our building has a lot of nooks and crannies, and someone can end up alone in a space. And so I think knowing that the only people that are in that building are the ones that are supposed to be there is helpful. Overall, our students appreciate the effort to try to keep them safer.”
Sponsored
The River Building, London

The River Building, London

Boon Edam Australia Pty Ltd

Known as being positioned within one of the most popular positions within London, The River Building sits comfortably between London Bridge, St Paul’s, and Bank. The position offers enviable commutes for the city workforce, boasting a five minutes’ walk from six key tube stations. Renovated to utilise a once void entrance, The River Building is now a self-contained office space with a contemporary industrial design. The large atrium features a set of sleek black Lifeline Speedlane Swings. Stiff + Trevillion working with Blackstone Group, had specified early into the design process for the Lifeline Speedlane Swing, due to its existing specification in existing projects. The new two-story building boasts a spacious atrium that combines naked brick walling with warm feature lighting and dark tones. Mimicking the interior styling a bank of Lifeline Speedlane Swings were to be finished in black RAL. The River Building with an occupancy density of 1:8 requested comfortable yet stylish entry resulting in a wider lane width configuration. The 615mm passage width utilises two glass wings that offer fast access but give the illusion of openness.
Sponsored
Ready to Set Sail at the Brisbane International Cruise Terminal

Ready to Set Sail at the Brisbane International Cruise Terminal

Flowcrete

The brand new state-of-the-art $177 million Brisbane International Cruise Terminal was completed in mid-2020 and will serve as a gateway for the Queensland tourismsector. The 9,300m² terminal was designed by Arkhefield in collaboration with Arup will provide visitors with a world class experience.The public spaces including the internal walkways, communal areas and departure lounge featured 1,500m² of Flowcoat Terrosso in four bespoke colour combinations.The decorative resin-based flooring system was chosen to provide a decorative, seamless flooring system that would not only create a luxurious and welcome environment, but withstand the expected foot traffic.A further 1,200m² of Deckshield ID was applied to the foot bridge, providing passengers with a slip resistant and safe surface as they board or disembark some of the biggest cruise ships in the world.Tremco CPG Australia’s portfolio of industry leading products provided not just a flooring solution for the world-glass tourism facility. In addition to the Flowcreteflooring systems, Tremco CPG Australia also provided the structural glazing silicone Proglaze II to a total of 218 glass panels.
Sponsored
Gurner Apartments, QLD

Gurner Apartments, QLD

Rondo Building Services Pty Ltd

Located in Fortitude Valley in the heart of Brisbane. Builder, Multiplex began Stage 1 of this $200m project in May 2015 and completed it in July this year. Subcontractor, Precision Interior Walls & Ceilings enlisted Rondo’s expertise in designing the internal ceilings and partitions, external walls and soffit framing. Designed by Architect’s Elenberg Fraser, Stage 1 of the development consisted of 32 levels with 910 luxury apartments sprawled across two towers. This will eventually form part of three residential towers incorporating ground floor retail areas, cafés, restaurants and over 1000 apartments in total.
Sponsored
Portsea Surf Life Saving Club

Portsea Surf Life Saving Club

ECOCLEAN

LOCATIONPortsea, Victoria – AustraliaCOLLABORATIONArchitect: CarrBuilder: IB ProjectsDeveloper: Portsea Surf Life Saving ClubBRIEFPortsea Surf Life Saving Club was given an $8 million contemporary redevelopment where part of the brief was to protect the glass and external concrete to reduce maintenance costs and dirt build-up.ECOCLEAN were engaged to coat the building’s glass windows (including the observation room) and all external concrete with our protective Self-Cleaning Coating. The coated surfaces will self-clean and look as new with the added benefits of purifying the air the that comes in contact with.MATERIAL & APPLICATIONECOCLEAN Glass TreatmentECOCLEAN Self-Cleaning GlassECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOUTCOMEThe redevelopment of the surf club not only brings the building into the present but our ecofriendly and sustainable coatings will keep the concrete and glass protected and clean well into the future.
Sponsored
Mumbai Airport, India

Mumbai Airport, India

Rondo Building Services Pty Ltd

Rondo provided a solid support foundation, using resources from both international and Australian technical services departments. The South West Pier (Stage 1), was built by Rachana Arts and saw Rondo provide assistance for the Corian cladding to the columns by creating adjustable and concealed fixings that were purposely designed for the hollow section support framing, as well as providing Stud and Track to support the various cladding materials.
Sponsored
Minter Ellison, Sydney

Minter Ellison, Sydney

SAS International Australia

Minter Ellison's award-winning office specified SAS International ceilings as part of their overall workplace well-being strategy. Designed by BVN, the feature ceilings enhance the open floor design while minimising the use of materials. BVN challenged internal preconceptions of how major law firms present themselves to staff and clients alike. Deliberately shying away from a stiff, corporate feel, they specified SAS750 Tubeline in black. Their aim was to evoke a sleek and forward-thinking dynamism while maintaining a highly professional atmosphere. Elsewhere in the office areas SAS310 metal pan ceilings were specified with an unusually large perforation. This design feature creates a visually engaging ceiling which offers subtle system integration for sprinklers, down-lighters and other small services. Due to a tight project programme, micro-perforated SAS150 was specified knowing the tiles were readily available in the Sydney warehouse. The system satisfied acoustic absorption requirements too, achieving 0.95 NRC. Minter Ellison invested in not just a Grade A office redevelopment, but also their staff, improving motivation and retention. The reinvigorated space also communicates a clear sense of approach to visiting clients, underlining core brand values. Occupying the top 8 floors of the Governor Macquarie Tower, the project won the 'John Verge Award for Interior Architecture (NSW Architecture Awards) in 2016.
Sponsored
Colour Matching - East Palm Beach Apartments

Colour Matching - East Palm Beach Apartments

ECOTONE

Collaboration Architect: ArchidiomBuilder: McNab ConstructionsDeveloper: BluePoint PropertyMaterial & ApplicationConcrete stain applied to unsightly concreteOutcomeThe owner of the building and builder were impressed with the result and widened the scope to include the soffits and feature foyer moulded concrete wall.TestimonialUpon dropping our Scaffold on a 10 Storey residential project with a Precast façade spanning 8 Storeys, we were left with an incredibly unaesthetically pleasing finish resulting from sealing applications.We reached out to all our contacts including our competitors who all suggested our only solution was to all Wayne at ECOTONE. From the first phone call to the initial site visit we were immediately satisfied that we were in the hands of a true expert in which could rectify all our issues.Wayne detailed how the product was applied, provided multiple samples for the client to choose from and in which once approved, we were off. After completing the initial precast façade rectification, our client and internal team were blown away by the workmanship, speed and appeal of the application. After seeing what the team was capable of, we engaged ECOTONE to complete multiple other areas of the building, which have now have become the talking point for each site visit.We cannot thank Wayne & Jayden enough as without them, our building would not have the appeal it does today, thank you boys! Cannot wait for the next project!Anthony Yared, Contract Administrator- McNab
Sponsored
Miesian Plaza, Dublin

Miesian Plaza, Dublin

SAS International Australia

Now, and after years of meticulous renovation and restoration, the Miesian Plaza is set to welcome its new tenants, including the likes of Ireland’s Department of Health. Aiming to achieve the highest LEED platinum accreditation, architects Scott Tallon Walker have said their goal is: “To provide Grade A accommodation of the highest modern standard to equal or surpass the finest developments in the market.” Combining sustainable high-grade services all encased in a bronze-tinted double-glazed window motif, the building achieves the architect’s bold aim to create a building like no other. SAS International designed and manufactured products for three of the Miesian Plaza’s blocks. As the building module size is imperial, SAS was able to provide bespoke C profile width to maintain the buildings original 64 1/2” planning module.
Sponsored
Manly Beach Below Grade Project

Manly Beach Below Grade Project

Tremco

About the ProjectThis Child Health and Learning facility in Manly, deliversspecialist child healthcare for up to 15,000 families a yearfrom rural, regional and remote New South Wales andbeyond.The new facility will integrate a state-of-the-art child schooland health service that will accommodate regional childrenand families nationwide.This six storey building includes school classrooms,consultant and observation rooms, a paediatric oral healthunit with a dental and orthodontics room, ophthalmology,occupational therapy, sensory rooms and a telecare centre.ChallengeOver 80% of construction litigation and defect claims are a result of water ingress, of that 80%, almost 30% of those are below grade issues. (City Futures Research Centre UNSW).The two biggest waterproofing challenges for this build were:1) Below Grade - Non structural Blinding Slab, 4 metres below sea level and less then 50 metres from Manly Beach. This build had decanters pumping over 1.3 million litres of water per day awayfrom the site during the construction phase.2) The creation of a waterproofing solution which would not fail if the membrane was penetrated, be it in the pre or post construction phase.Due to the proximity to the beach and the build having a raft slab in the basement, a standard cookie cutter below-grade waterproofing solution was not an option for this build.Tremco SolutionTremco were asked to provide a solution for this complex build. The biggest and most demanding waterproofing areas within the build that needed attention were:1) Below Grade - 50 metres from the ocean and 4 metres below sea level, we needed a reliable waterproofing solution, that would also be robust enough to withstand any punishment tradesdelivered post installation, we recommended and used Paraseal SW (Saltwater). Paraseal SW is a multi-layer sheet membrane waterproofing system consisting of a self-sealing, expandable layer of bentonite laminated to an impermeable, high density polyethylene (HDPE).2) iAuditor reporting- iAuditor is an onsite quality assurance program Tremco conduct for the builder and applicator to ensure our products are being installed correctly and to specification. This gives the builder the confidence that there will be no waterproofing defects within the build.Overall, both the builder and developer were happy with the end result, which provided the warranty and quality required of such a development.
Sponsored
Rainwater harvesting for a government facility

Rainwater harvesting for a government facility

Atlantis

Project Location: Amberley, Queensland, AUSTRALIA.In Amberley is one of the largest base facilities in Australia. The redevelopment works are valued at AU$331.5 million. New construction and refurbishment works to be undertaken include newliving-in accommodation, maintenance facilities, storage, working and training accommodation, a combined mess and a new physical fitness centre.The site is owned by an Australian Government Department. The Atlantis® Turf Cell® was supplied by Atlantis and was installed by Kennedy Projects Group in April 2009. The system is located at the playing fields on the south-western corner of Gannet St and Rosewood Road, Amberley, QLD.A vegetated swale surrounds the playing field. The swale is an open, shallow channel designed to slow runoff, filter it, and promote infiltration into the ground. Excess water moving through the soil profile is captured by Atlantis® Matrix® Tank – Single modules. The use of a swale to collected water results in smaller runoff volumes, lower peak discharge rates and cleaner runoff. The vegetation in swales, usually thick grass, helps to trap pollutants such as suspended solids and trace metals. The Atlantis Matrix modules extend 3m (10ft) wide under the swale for 110m (360ft).Water collected by the swale is collected in a stormwater harvesting tank located adjacent to the north-western corner of the playing field. Perforated corrugated plastic pipes used as subsurface drainage pipes extend for 1560m (5110ft) is also collected by the stormwater harvesting tank.The stormwater harvesting tank is located subsurface and is constructed of a heavy duty low density polyethylene liner and non woven geotextile surrounding Atlantis® Matrix® Tank - Double modules. The Atlantis stormwater tank has a 4,100m3 (144,80 ft3) capacity. Water collected by the swale and stormwater tank system is used for irrigation of the sports field.The Atlantis stormwater tank has eight (8) cleanout / inspection ports placed through the systems. A 1200mm (4ft) dia. wet well with bolt down lids has been installed adjacent to the tank serves as a pump out pit. The overflow from the tank has a 15m (50ft) long x 400mm (1.3ft) deep spill way with scour protection into an adjacent creek.
Sponsored
The Wharf Phase 2

The Wharf Phase 2

CarbonCure

Project Overview The Wharf Phase 2 will deliver the final more than 1million square feet (92,903 square metres) of mixed-use development to the vibrant waterfront neighborhood, The Wharf. Phase 2 will include a marina, office, residential and retail in addition to a 1.5 acre (0.6 hectare) park and abundant outdoor public space. Delivered in 2017, Phase 1 includes more than 2 million square feet (185,800 square metres) of development. The project architects and designers comprise one of the most impressive lineups in the nation, including SHoP Architects, WDG, ODA, Rafael Viñoly, Morris Adjmi Architects, Hollwich Kushner (HWKN), S9 Architecture, Michael Van Valkenburgh Associates, DCWDG Architecture, Parker Rodriguez, Rhodeside & Harwell, Thomas JuulHansen and Wolf Josey. Sustainable Waterfront CarbonCure-based concrete mixes were selected for the construction of The Wharf to support the sustainability goals. Vulcan Materials Company placed 18,891 cubic yards (14,443 cubic metres) of concrete made with CarbonCure through their partners at Concrete Mixes Inc. These mixes prevented the emissions of an estimated 134 tonnes of CO2. That’s equivalent to 175 acres (71 hectares) of forest absorbing CO2 for a year
Sponsored
Fresh Floor Finish for Orchard Manufacturing

Fresh Floor Finish for Orchard Manufacturing

Flowcrete

Orchard Manufacturing is an Australian health company that has been producing fruit-based laxatives under the Nu-Lax brand, since 1937.The organisation’s new state-of-the-art, purpose-built facility - located in the Victorian suburb of Rowville - delivers both superior function and out-of-the-box design as well as providing a new home for the long-time Melbourne-based manufacturer.To ensure the new facility’s processing and packaging zones met the strict hygiene standards, 1, 300 m2 of Flowfresh SR was installed in Warm Buff, Grey and a custom Aqua Blue shade.The HACCP Internationally certified Flowfresh SR system was chosen thanks to its seamless, antimicrobial finish as well as its abrasion and chemical resistant profile.Flowfresh SR provides excellent chemical resistance against detergents, oil ingredients, caustic soda, sugar syrups, methanol and a variety of acids. The system delivers excellent abrasion resistance against impact as well as sustained foot and trolley traffic.Flowfresh SR is resistant to thaw and thermal fluctuations from -40°C to +120°C, making it suitable for cool rooms and cold storage areas as well as those areas subject to high-temperature cooking processes and hot-water wash-downs. Slip resistance can be tailored to suit the individual needs of a given processing area.
Sponsored
Heathrow Airport, Terminal 4

Heathrow Airport, Terminal 4

SAS International Australia

The £70 million project saw SAS International design and manufacture bespoke spun alum­inium profiled discs, acoustic metal wall panelling and System 600 rafts in the new terminal. The architects 3D Reid had to make the building light, airy and modern yet the façade and various materials used within the terminal had to withstand potential of a security breach. All products installed ‘land-side’ were required to meet the requirements of Aviation Security in Airport Development (ASIAD). The result answers aesthetic demands, yet provides the highest level of performance for the requirements of the building. For the design to be realised, square aluminium sheets were cut by the manufacturer into a circle and spun into a dome. Installation in such an environment means safety cables had to be attached to each disc, wall panel, tile and raft to ensure they do not fall and cause injury. Allowance for safety cables to be attached had to be taken into consideration during the design phase. Large vertical wall panels with an ultra-micro perforation were also specified to provide the necessary acoustic properties required for this vast open space. The very fine 0.7mm perforation, with 1% open area, helps to manage acoustics within the large open spaced terminal. The off-site modular manufacture of the architectural metalwork products meant installation was quicker, which causes less disruption to such a busy environment, and in addition there is no waste on site. Aesthetic versatility can be achieved using SAS International Architectural Metalwork throughout projects. It also allows for inte­gration of M&E services into the building design while meeting design demands and durability requirements. The range includes acoustic baffles, acoustic wall panels, air handling units, bespoke ceilings, and column casings.
Sponsored
Australian Parliament House

Australian Parliament House

RBA Group

The Australian Parliament House features the following RBA products:B4112 – Bobrick Contura™ Surface Mounted Soap DispenserB38034 – Bobrick Paper Towel & Waste, Trimline™ series Also referred to as Capital Hill, the Australian Parliament House is the central meeting place for the Parliament of Australia. Designed to hold 5000 people when Parliament meets, the 32 hectare site is where Australia’s biggest decisions are made by agents of our citizens. RBA has consistently provided for Capital Hill during the 21st Century in a bid to provide world-class products for Australia’s representatives.Located in the heart of Canberra in the Australian Capital Territory, the Australian Parliament House was designed to better accommodate a larger number of people, meaning a greater amount of facilities for its growing occupancy. The building is designed to be spacious and not intimidating to the public, encouraging citizens to visit. Catering for Capital Hill’s requirements of security, high traffic and minimal maintenance, RBA has supplied a number of Bobrick Accessories specific to this project, suitable for both the highest of political representatives and the average citizen.RBA’s Bobrick Contura™ Surface Mounted Soap Dispenser, or the B4112, is made of strong Stainless Steel and holds a capacity of 1.2L. The unit is Antibacterial Soap resistant, allowing for its users to maintain optimal hygiene without wear and tear. Needing nominal maintenance, the B4112 is ideal for high traffic locations. Exhibiting a Satin Finish, the unit is a subtle addition to the facilities whilst simultaneously complimenting the silver notes in the Washroom design.Also pictured below is RBA’s Bobrick Trimline™ Recessed 2-in-1 Combination Unit, containing both a Paper Towel Dispenser and Waste Receptacle B38034. Recessed in nature, the unit invades minimal space while holding a large capacity of 600 C-fold of 800 multifold paper towels and a waste capacity of 14.4L, sporting two Tumbler Locks for security. It too has a Satin Finish to its Stainless Steel exterior, matching the B4112, maintaining a consistent aesthetic as well as blending in with the amenities. 
Sponsored
Rouse Gardens

Rouse Gardens

Tremco

About the ProjectIn response to unprecedented demand, Rouse Garden is filling the void of modern-day homes close to trains, shops & jobs at the most competitive price on the market. Featuring the diversity of 1, 2 & 3 bedroom homes, there’s something for everyone in the most wondrous apartments to grace Rouse Hill. From floor to ceiling glass walls, timber hardwood flooring in your living room and a private rooftop garden terrace complete with BBQ and lounge areas. The quality of design is worthy of being marvelled at. Living rooms have been purposed to allow seamless indoor and outdoor transitions, blurring the boundaries between inside and out and elevating your home to new heights.ChallengeWhen you are building in one of the premier locations in Norwest Sydney, it’s all about the ding to match the lifestyle your new residents demand from your new community.  Presented with tight detail, the look, the feel and the performance of your build time-lines, and expectations of high quality, Hydraseal were tasked with working on Rouse Gardens. Waterproofing both the internals and roof of the building, the builder demanded warranties to match the project requirements and to deliver a quality finish demanded of this high profile project.To streamline this project, availability of stock and ease of application were key product requirements needed from the project, which Tremco were tasked with delivering.Tremco SolutionVulkem H2 Plus, Vulkem NEM, Tremflex50, Vulkem 951Hydraseal partnered with Tremco for a few reasons, primarily trust built up through a longstanding relationship provided the support necessary for the key for the success in this project.The versatility of Vulkem NEM being able to be used for internal wet areas, in conjunction with Vulkem H2, as well as for outdoor areas under Vulkem 951 NF allowed for fast and consistent application of waterproofing on the project, given the tight time frames, all backed with long warranties to match product performance.The combination of Vulkem NEM, Vulkem 951 NF and Vulkem H2 provided the warranties demanded by the builder which resulted in both Builder, and Applicator very satisfied with the job. 

Showing 1-23 of 23

Feedback