NBS Source
I'm a manufacturer

"local air conditioning systems"

1,742 results found

Sort by:

Showing 289-301 of 301

Sponsored
Rainwater harvesting for a government facility

Rainwater harvesting for a government facility

Atlantis

Project Location: Amberley, Queensland, AUSTRALIA.In Amberley is one of the largest base facilities in Australia. The redevelopment works are valued at AU$331.5 million. New construction and refurbishment works to be undertaken include newliving-in accommodation, maintenance facilities, storage, working and training accommodation, a combined mess and a new physical fitness centre.The site is owned by an Australian Government Department. The Atlantis® Turf Cell® was supplied by Atlantis and was installed by Kennedy Projects Group in April 2009. The system is located at the playing fields on the south-western corner of Gannet St and Rosewood Road, Amberley, QLD.A vegetated swale surrounds the playing field. The swale is an open, shallow channel designed to slow runoff, filter it, and promote infiltration into the ground. Excess water moving through the soil profile is captured by Atlantis® Matrix® Tank – Single modules. The use of a swale to collected water results in smaller runoff volumes, lower peak discharge rates and cleaner runoff. The vegetation in swales, usually thick grass, helps to trap pollutants such as suspended solids and trace metals. The Atlantis Matrix modules extend 3m (10ft) wide under the swale for 110m (360ft).Water collected by the swale is collected in a stormwater harvesting tank located adjacent to the north-western corner of the playing field. Perforated corrugated plastic pipes used as subsurface drainage pipes extend for 1560m (5110ft) is also collected by the stormwater harvesting tank.The stormwater harvesting tank is located subsurface and is constructed of a heavy duty low density polyethylene liner and non woven geotextile surrounding Atlantis® Matrix® Tank - Double modules. The Atlantis stormwater tank has a 4,100m3 (144,80 ft3) capacity. Water collected by the swale and stormwater tank system is used for irrigation of the sports field.The Atlantis stormwater tank has eight (8) cleanout / inspection ports placed through the systems. A 1200mm (4ft) dia. wet well with bolt down lids has been installed adjacent to the tank serves as a pump out pit. The overflow from the tank has a 15m (50ft) long x 400mm (1.3ft) deep spill way with scour protection into an adjacent creek.
Sponsored
Adagio Apartments, WA

Adagio Apartments, WA

Capral Aluminium

The term ‘adagio’ is an instruction to slow down and function at a leisurely pace, which makes it an appropriate name for the recently completed apartment complex. Designed by Hanssen Pty Ltd, minimalist design principles are apparent in the building’s sleek lines, as evidenced in the strong use of high-performance window systems, doors and balustrades; low-maintenance aluminium framing; and a simple linear design promoting an outward-looking connection to the environment. The affordability, strength, adaptability and quality of manufacture of the Capral Apartment Collection made it our ‘material of choice’ for the Adagio high-rise.
Sponsored
Upper Yarra Secondary College

Upper Yarra Secondary College

BRITEX Metal Products

Britex are proud to be involved in another successful VSBA School Upgrade Project at Upper Yarra Secondary College in Yarra Junction, Victoria. The completion of Stage One of the College’s Upgrade and Modernisation Project saw the inclusion of almost 30 Grade 316 SS Acid Resistant Britex Laboratory Bowls for their state of the art science and technology facilities throughout. A floor mounted 3.5m Vandal Resistant Sanistep Urinal was also installed in the Male Bathrooms complete with Smart Saniflush Sensor Flushing System, a water efficient and hygienic choice ideal for education projects.
Sponsored
Span+ (rafter-mounted platform): Multi-level Shopping Complex, ACT

Span+ (rafter-mounted platform): Multi-level Shopping Complex, ACT

Con-form Group

THE CHALLENGE: House 30+ new HVAC&R mechanical plant equipment and vents. Retrofitted to the roof of a large, multi-level shopping centre without interrupting regular retail operations.THE SOLUTION: We supplied over 30 EasyMech MR (purlin mount) and Span+ (rafter mount), HVACR platforms in Kit form.Our Span+ (rafter-mount) system, was designed to be 100% penetration-free and installed on the surface of the roof over the rafters.We also supplied walkways, up & overs, and ladders – all in Kit form! Providing savings in cost and time.
Sponsored
ABC Melbourne Office, VIC

ABC Melbourne Office, VIC

Capral Aluminium

The ABC project in Melbourne’s Southbank precinct represents a bold union of the national broadcaster’s multiple aims and responsibilities. With its bold style, internal and external openness and highly innovative use of technology, the ABC’s Victorian headquarters embodies socially responsible design. The central design theme of transparency is perfectly suited to the Capral curtain wall, window and door systems throughout. The building, which designer Cox Architecture characterise as fostering a ‘dynamic, integrated and visually transparent environment which promotes interaction across program teams’, also invites ‘greater public interest and participation’.
Sponsored
RMIT Swanston Street Campus, VIC

RMIT Swanston Street Campus, VIC

Rondo Building Services Pty Ltd

Expoconti and Rondo, along with the project architects, Lysons Architects and builder, Brookfield Multiplex, combined their expertise to ensure the design and construction of the RMIT Swanston Academic Building (SAB) offers a higher quality and innovative learning experience for students. To achieve this, the newly launched Rondo MAXIframe External Wall Framing System was specified, with Rondo MAXIjamb designed for installation around door jambs and internal window openings. This meant Expoconti could save time on site as MAXIjamb replaces the necessity for multiple stud configurations, as well as offering greater performance capacities than traditional wall stud framing.
Sponsored
Rosewood Aged Care

Rosewood Aged Care

Markham Global PTY LTD

There were two sets of challenges involved in the Rosewood Aged Care.Firstly, waterproofing the basement. The basement was excavated around a heritage-listed building, which had to stay undamaged for the duration of the works. Piles and shotcrete were implemented for the construction, but there was no scope to install a membrane due to space and other limitations. The Markham BASE-TECT system was ideal for this situation.Second were the requirements for moisture control and permanent hygiene protection for the interior floor slabs of the residential parts of the building. This is a more routine challenge, faced by aged care facilities with concrete floor slabs. AQURON 2000 MEDI+ was selected for concrete curing enhancement and permanent hygiene sealing.
Sponsored
Gold Coast Sports and Leisure Centre

Gold Coast Sports and Leisure Centre

Interpon Powder Coatings

As the countdown for the Gold Coast 2018 Commonwealth Games begins, the Gold Coast Sports and Leisure Centre is emerging as the centrepiece of the newly revitalised Carrara Sports Precinct. The Centre rises from the bank of Clear Island Lake in Carrara, Queensland, resplendent in an eye-catching, sub-tropical palette of yellow and ultramarine blue. Its sprawling 16,500m2 footprint is home to over 5300 spectator seats and 15 multi-use sports courts, which will host a number of Commonwealth Games events including badminton, weightlifting, and wrestling. Designed by BVN Architecture and taking just under four years to complete, the $101 million Centre represents the best and the brightest that the Gold Coast has to offer in terms of sports training and completion facilities. Throughout the design process, BVN had to comply with standards set by the Commonwealth Games and International Sports Federations, as well as those of the local council. The resulting project embodies – and triumphs over – the challenges faced by high profile projects that need to meet high standards, and is evidence of how rewarding such projects can be when done right. It’s rare that a project so closely captures the spirit of the program for which it was designed: the Centre does this and more with flair, the bold, colourful design clearly communicating the vibrancy and high energy of the Australian sporting spirit.  To realise the soon-to-be iconic design of the Centre, BVN turned to Interpon Powder Coatings, the largest manufacturer of powder coatings worldwide. Drawing from their unbeatable experience as the trusted frontrunners in powder coatings technology, Interpon’s team of experts closely colour-matched the architects’ palette to bring their drawings to life. “We were able to work collaboratively with our liquid Metal Coatings team and Bluescope® Steel to match the corresponding powder coat colour to compliment the exterior durability required for the project,” said Gareth Connell, Interpon Specifications Manager.  Warranty-grade Interpon D2015 Ultriva™ products in Carrara Gold Matt and Copper Penny Matt met the long-term legacy requirements of the Council, and will hold their sunny colours for years to come. The Interpon D2015 Ultriva product range offers outstanding performance with a 20 year film integrity and 15 year colour and gloss retention guarantee.  The warmth of the project also reflects the human element that organisers of the 2018 Games are championing in the lead up to the event. “This is a special event… it stands for everything good about humanity,” Gold Coast 2018 chief executive Mark Peters told Inside the Games earlier this month. “We want to make sure the Gold Coast and Australia continues that.”  The gold-tinged façade is fitting in more ways than one: once the Commonwealth Games end mid-April 2018, the Centre will become the new home of the Gold Coast AFL Club, aptly named the SUNS. “We are absolutely delighted,” said Andrew Travis, CEO of the Gold Coast SUNS, about the impending move, “I can’t wipe the smiles off people’s faces.”  For over 25 years, Interpon has supplied high quality powder coating solutions for architectural projects of all styles and colour palettes, bringing smiles to the faces of designers and clients alike.
Sponsored
Deakin University - Waterfront Student Accommodation

Deakin University - Waterfront Student Accommodation

ECOCLEAN

COLLABORATIONArchitect: ThomsonAdsett in collaboration with nettletontribeBuilder: L.U.SimonDeveloper: Deakin UniversityBRIEFThe Waterfront campus for Deakin University at Geelong celebrates the “individual” student through the prominent white precast concrete. The client on this project wanted to ensure that over time the white concrete stayed pristine – looking as good as new – without expensive cleaning and maintenance costs.MATERIAL & APPLICATIONECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOUTCOMEOur ECOCLEAN Self-Cleaning system has been applied to the concrete to preserve the appearance of this building’s prominent facade. This significantly reduces cleaning and maintenance costs making this a cost-effective and net positive environmental solution.
Sponsored
Prima Pearl Apartments, VIC

Prima Pearl Apartments, VIC

Rondo Building Services Pty Ltd

Rondo has delivered exceptional expertise and technical assistance during the design and construction of Melbourne’s Prima Pearl, residential skyscraper. This prestigious 667 apartment landmark boasts unparalleled amenities across 72 levels, some of which include a private cinema, virtual golf driving range and Level 67 Sky Lounge. By assisting Brookfield Multiplex Constructions’ architects at the design stage, Rondo has ensured our products are readily accessible on site, resulting in less design enquiries during construction. Rondo will be supplying the project with Stud and Track in 64mm, 76mm and 92mm sizes, KEY-LOCK Concealed Suspended Ceiling System and PANTHER Access Panels.
Sponsored
Margaret Whitlam Grandstand – Waverly Oval

Margaret Whitlam Grandstand – Waverly Oval

Tremco

​About the ProjectThe sporting history of Waverly Oval dates from the 1880s when the Waverley Cricket Club gained approval to construct a pitch. Football codes also began using the park at this time. In 1890, the oval was created, and in 1898 the Waverley District Baseball club was founded at the oval.The first pavilion was built by the Waverley Cricket Club in the 1890s and Council built a second pavilion in 1908 with expanded facilities for the benefit of the cricketers and the public. This Pavilion was replaced in 1939 with an Inter War Functionalist style building. In April 2012 the new Waverley Park Pavilion was named the Margaret Whitlam Recreation Centre, in honour of the long association the late Margaret Whitlam (AO) had with the Waverley area. The pavilion was chosen because of its civic, community and recreational facilities incorporating several important aspects of Margaret Whitlam’s life.ProblemRemediation of the pedestrian areas of Margaret Whitlam Grandstand was completed 5 years ago but unfortunately was not successful due to product failure (not Tremco). Council contacted Tremco to provide an acceptable solution with the requirements that the new system needed to come with a 15 year warranty.The challenge of this project was not the 15 year warranty period, but the need for a low odour solution due to the area being in a Public/Government venue. Not all membranes have Low VOC properties.SolutionTremco recommended Vulkem 350/951NF/951NF for the job, which is not only low odour but also offers a 15 year warranty period as required from the council. Tremco offering onsite support throughout the project gave the council confidence in our product.Vulkem 350/951NF/951NF, is a composite waterproofing system comprised of tough-curing liquid polyurethane. It cures to form a durable rubber membrane surface that provides a lasting and easy-to-clean waterproof and trafficable coating. Textured surfaces for traffic will use an aggregate-laden top membrane to aid in wear and slip resistance.
Sponsored
Columbia College, USA.

Columbia College, USA.

Boon Edam Australia Pty Ltd

The new Student Center at Columbia College Chicago, located at 754 South Wabash Avenue in Chicago, opened its doors in the fall of 2019. This brand-new building offers five spectacular stories of spaces for students including music and film-screening rooms, dining options, a fitness centre, a reflection room for meditation and prayer, and event spaces for meetings, performances, and receptions. Columbia College Chicago has a closed campus. In order to enter any building on campus students and staff must have a Columbia ID or visitors must have a valid appointment. The main entrance at the Student Centre is the Tourniket manual revolving door that leads to a public foyer that includes a coffee shop and lounge. Since the speed gates are just past the security desk at the boundary of this area, they serve as a visual and physical indicator of where the public area terminates. Next to the Speedlane Open speed gates, which are notable because they do not have any closing barriers, guards watch as people pass through them to ensure that everyone is scanning their IDs and that the IDs are valid, in which case the speed gate shows a green light. In a situation where a red light shows and the gate alarms, the guard will check the person’s credentials and can try to troubleshoot the ID card. “The decision was really about what creates the least barrier to those entering and exiting the building,” said Dutil. “We don't really want our students to feel like they are overly policed or that our buildings are not accessible to them. So the design of the Open speed gates provided the best solution in terms of controlling access without being obtrusive." Swift Passage While Maintaining Accountability Before the Student Center was built, students entering any campus building would just show their ID to the security officer as they walked past. The administration realised that while this does provide some level of security, it is not foolproof – particularly when many people are entering at the same time for a class. The College’s head of security made the suggestion to install a system that would allow for swift passage of authorised people while maintaining accountability around who enters and exits the building. As anticipated, there was a brief learning curve for the students using the new system. “This was the first system like this on our campus,” said Dutil. “And the first few days that the new Centre was open were also the first few days of school. There were a lot of people new to the campus who required a bit of coaching from guards and our student staff in terms of where to place your card, and to not walk through before you place your card.” Coming Out Ahead of Swinging Doors Dutil confirms that the access systems placed at Boon Edam speed gates are actually outperforming those placed at swing doors across the campus for convenience and adoption. Across the campus, there is a card reader at every swing door entrance of a building where you present your card and a light turns red or green. But oftentimes the card reader is missed, or depending on the placement of the lights and placement of the guard, it can be kind of hit or miss with students walking right by it. “But with the Open speed gates, they're very visible and although they're not a total barrier to entry, they are something that's right in front of you. Because it's very noticable and not easily overlooked, the students have learned pretty quickly to get their ID out. In fact, this was meant to be a test run for the campus to ensure it would be viable and worthwhile for other buildings as well.” Advanced Features Add Value and Flexibility The speed gates have delivered additional benefits beyond basic campus security, according to Dutil. “One of the nice things about a system like this is that we can count visitors to the Student Centre because we get the data of everybody that scans in. So on a busy day for us it's about 2500 people throughout the day. That can range depending on what's going on and what time of year it is. On weekends we're very slow, since there are no classes – maybe 900 to 1200.” “We are a rental venue as well, so we have times where the building is open to non-Columbia College Chicago people for events or other functions. There's a really convenient touch panel right at the security desk called the BoonTouch, where the officer can turn off the turnstiles during those times and then attendees can move through freely without any alarms going off at all.” A New Revolving Door Adds Comfort and Peace of Mind Finally, the Tourniket manual revolving door delivers one additional benefit to the Student Centre, located in a city known for harsh weather. “Revolving doors are always preferred at a building like this that gets a lot of traffic going in and out. We have cold, drafty weather that blows right into our main space at that first floor entry. The revolving door helps to keep the building warm and saves energy and utility costs as well,” said Dutil. “Students feel safe and comfortable entering the building at night,” he concludes. “Our building has a lot of nooks and crannies, and someone can end up alone in a space. And so I think knowing that the only people that are in that building are the ones that are supposed to be there is helpful. Overall, our students appreciate the effort to try to keep them safer.”
Sponsored
DNV GL Energy Office

DNV GL Energy Office

Boon Edam Australia Pty Ltd

TenneT's former head office at the Arnhems Buiten business park has been renovated and converted into one of the most sustainable office buildings in the Netherlands. It is now the head office of DNV GL's energy branch, which employs 2,500 energy experts worldwide. It is DNV GL's largest office building in the Netherlands. The site accommodates about 400 DNV GL employees and covers about 10,000 m2 of office and lab space. The building has achieved an A energy label thanks to innovations such as the use of seasonal thermal energy storage, solar panels, HR +++ glass and a highly efficient heating and cooling system. Boon Edam installed a sliding door at the main entrance, and three Speedlane Slide access gates and two Winglock 900 swing barrier gates in the central hall behind the main entrance to prevent unauthorised entry.

Showing 289-301 of 301

Feedback